You are on page 1of 2

MAGNETIC PARTICLE PT.

TERRA SAMUDRA ENG


EXAMINATION REPORT CONTRACTOR – ENGINERING – SUPPLIER - INSPECTION -
CERTIFICATION
Jl. Cibereum Ruko Pekopen No. 03 RT/RW 02/03 Lambang Jaya Tambun Selatan Kab. Bekasi Indonesia 17510 Telp. (021) 3029 7653

Client : PT. RPE Drawing No. : 651-MCD-TW-DRG-351-002 Report No. : 01/MT/TSE-RPE/III/24


Project : Fabrication Collar Procedure : 003-NDT-MT-TSE Date : 27-03-2024
Moulding Applicable CODE : AWS D1.1
Location : Gresik – Jawa Timur
Material Spec : CARBON STEEL Welding Process : FCAW
MT Equipmnt : √ Yoke □ Probe □ Coil
Current Type : √ AC □ DC Serial No. : 5756
Particle Materials : □ Fluorecent √ Non Fluorecent Light Intensity : 1076 Lux
: □ Dry √ Wet
Brand Name / Type : MAGNAFLUX Particle : 7HF White : WCP-2
Contrast
Examination Method : √ Continous □ Residual
Surface Condition : √ As Welded □ As Machined □ As Ground □ Other
Time of Examination : √ After Welding □ After Hydro-Test □ After PWHT □ Other
Scope of Examination : √ Base Metal □ Edge Prep □ Back Chipping
: √ Weld Part □ Repair Weld □ Other
No. Part Name Joint Welder Result Type of Remark
No. ID Accepted Rejected Discontinuity
1 SIDE FORM J.1 WD-01 ACC - ND NO DEFECT
LIFTING LUG # 1 J.2 WD-01 ACC - ND NO DEFECT
J.3 WD-01 ACC - ND NO DEFECT
J.4 WD-01 ACC - ND NO DEFECT

Sketch (Identify discontinuities listed above) If necessary :

SEE ATTACHED !

Examined by Reviewed by Reviewed by

Name : WAWAN KURNIAWAN ASNT LV II


Date : 27-03-2024
SIDE FORM
LIFTING LUG # 1
Report No. 01