Workshop:
Machining and face the 12” MS flange for ETP area work is completed.
Dismantled the P412 change its mechanical seal and both bearing work is
completed.
Machining and welding the rotor AG3000B motor work is completed.
Machining and facing to make the teflon washer for diesel peter engine
work is completed.
Two flexible shafts of boiler are repaired and maintenance, work is
completed.
Welding and resizing of the shaft of P412 work is completed.
One adopter is prepared for the cleaning shaft work is completed.
Dismantled the P308B change its mechanical seal and both bearing work
is completed.
Spare centrifugal pump change its bearing and whole maintenance work
is in progress.
Cleaning the lathe, drill and shaper machine work is completed.
General work:
Checked the all welding plants & covered them work is completed.
Welding cutting and grinding the R428 to ready the fiber glass coating
work is in progress.
Welding cutting and grinding the R427 to ready the fiber glass coating
work is in progress.
Welding cutting and grinding to install the new MS plates bottom of
R428 tank work is in progress.
Dismantled the 8” setup valve of R411 tank for cleaning purpose work is
completed.
Dismantled the 8” setup valve of R412 tank for cleaning purpose work is
completed.
Dismantled the 8” setup valve of R413 tank for cleaning purpose work is
completed.
After cleaning air sparger of R411 boxed up work is completed.
Dismantled the bottom main hole of R305 decanter for cleaning purpose
work is completed.
Welded the MS patch of 5’*8” at R422 tank work is completed.
Welded the MS patch of 5’*8” at R423 tank work is completed.
After tube cleaning boxed up the side two main hole of E401 work is
completed.
Dismantled the suction and discharge pipe line of P308 pump for
cleaning purpose after cleaning boxed up work is in progress.
Dismantled the inlet and outlet pipelines of H.E302 pump for cleaning
purpose after cleaning again boxed up work is in progress.
The line of R304 is dismantled towards pump P308 for cleaning and
inspection purpose work is in progress.
The all butterfly valves at the line of R430 are dismantled for cleaning
purpose after cleaning again boxed up.
After washing one side main hole of E526 is boxed up work is in
progress.
Dismantled the main ways of C540 column, work is completed.
Overhauling work of all pumps in distillation, work is in progress.
Dismantled the P308B pump for maintenance and bring to mechanical
work shop work is in progress.
Dismantled the P412 pump for maintenance and bring to mechanical
work shop work is in progress.
Dismantled the P550A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P535A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P545A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P530A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P561A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P563A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P543A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P560A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P565A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P500A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P546A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P540A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P510A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P515A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P501A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P525A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P562A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P541A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P555A motor for overhauling and hand over to electrical
department work is completed.
Dismantled the P520A, B motor for overhauling and hand over to
electrical department work is completed.
Dismantled the P521A, B motor for overhauling and hand over to
electrical department work is completed.
ETP Area:
The 12” biogas line coming from ETP to boiler is dismantled and bring
down with the assistance of crane for cleaning purpose, work is in
progress.
The 12” biogas line coming from ETP to Flair tip is dismantled and
brings down with the assistance of crane for cleaning purpose, work is in
progress.
The work of replacing the damaged 12” MS Biogas line of Flair tip is in
progress.
Dismantled the over flow lines digesters with the help of crane work is in
progress.
All clarifier’s outlet lines were dismantled for cleaning purpose after
cleaning boxed up the line work is in progress.
Dismantled the 8” bottle lines of all digester for cleaning purpose work is
in progress.
The work of replacing the damaged 12” MS Biogas line is in progress.
Dismantled the 12” main biogas line for cleaning purpose after cleaning
again boxed up the lines work is in progress.
The work of replacing the damaged 12” MS Biogas elbow is in progress.
After cleaning boxed up the suction and discharge side 6” biogas line of
all blowers work is in progress.
Install and operate the 5” submersible pump near STP area work is
completed.
Boiler House:
Operate the 30HP diesel peter engine near Based wala point for effluent
transfer work is completed.
Operate the 25HP diesel peter engine at kamena wala dera point for
effluent transfer work is completed.
Operate the 5”F submersible pump at pit no 3 for effluent transfer work
is completed.
Sultan concrete:
Pre-cast plant:
Manager Mechanical