Professional Documents
Culture Documents
Shifting of Gear Box along with Hub and blade assembly from store to work place.
Receipt Of PTW Along with required certificates
Ensure LOTO Of Motor
Shifting of all required tools and tackles.
Dismantling of Machine Guarding
Fixing of coupling to spare gear box.
All required tools and tackles.
All moving equipment’s required for the job till, trailer & crane.
De-couple the old gear box.
Erection of gear box along with Hub and blade assembly and alignment.
Re fixing of Machine guarding
Checking of rotation of gear box.
Coupling of new gear box.
Return of PTW & All certificates
Trials of gear box
If any abnormal in operation rectification of same in presence of JVML Engineer
Shifting of old gear box to designated place.
Supervisor for the job
Contractor has to supply sufficient gang to execute the work within the given time.
All required arrangement for coupling removal should be made by contractor.
Multi working groups for parallel jobs and number of activates and number of replacements at same time.
Working elevation from 0.00 Mts. to + 16.00 Mts
D. V-Belt Pulley Replacement :
E. JVML SCOPE:
Required permit of work.
Give clearance for de-coupling and coupling.
Provide heavy crane (200t/90 t) if required.
G. Safety:
All JVML approved PPE’s should be provided to work force by contractor
All workers should undergo training of JVML Corporate standards also all of them should have medical certificate. The same to
furnished if asked.
Following standards are applicable to this job. PTW/WAH/LOTO/MATERIAL HANDLING, PPE’S, HEAVY LIFT & ESS safety standard’s
For welding m/c, cutting set, grinding m/c and safety belts JVML standard checklist should be followed.
H. Up keeping:
During job execution and after completion of the job, site should be maintained neat and clean.
Scraps and grease should be cleaned immediately after job completion.
All removed items should be shifted to designated place (Metallic /Non metallic).
All required movable, lifting and erection, tools, equipment’s trailer, till and cranes required for the job.
I. JVML Scope:
Work to permit (For each working group one dedicated contractor supervisor should be available)
Corporate standard safety certificates (For each working group one dedicated contractor supervisor should be available) And
contractor has to full fill all the requirements which are required for each safety certificate.
Spare motor and coupling
All required fasteners, rustolene and cleaners.
Crane, hydra and trailer for replacement and shifting
Equipment (Hand tools): Standard tool box, Standard Rigging Tools, Hydraulic jack, puller alignment tools, cutting set, welding m/grinding
M/c Till, Trailer.
Specialist Equipment: Competent authority certification for Lifting machines tools & tackles and pressure vessels, Hydra (pick & carry
cranes), EOT cranes, Forklifts, and earth moving equipment’s (JCB, Pock lain). All buses, Utility vehicles, Jeeps and Cars should have seat
belts for all passengers including driver. RTO fitness certificate, Third party insurance coverage is required. Legal Licensing.
1 PTW Applicable
2 CSE Not Applicable
3 WAH Applicable
4 LOTO Applicable
5 MG Applicable
6 ESS Applicable
7 PPE’s Applicable
8 Conveyor Safety Applicable
9 Scaffolding Not Applicable
10 L&H Applicable
11 G&A Applicable
12 Chemical safety Not applicable
13 Fall of object Applicable
14 Fire Prevention Applicable
(Pertaining to the activities other than General): Special hydraulic puller or jack, jigs and fixtures to be made ready for removal of wear
General PPE's: Helmet Shoes Jackets Dust Mask Goggles Ear Plugs Gloves Apron Face
shield
Scope of Work for clear water & Slurry Water Pumps maintenance at BF#5 Entire Complex
Contractor's Scope:
Job is to be carried out with valid work permit & proper isolation to be ensured.
Job is to be carried out as per the instructions of JSW Engineer instructions round the clock & completed
within specified time.
Contractor has to carry out the jobs which is concern to main job
Job is to be carried out with all safety PPEs and fire hydrant/ water hose to be ensured before starting the
work to prevent the fire incidents.
One supervisor from contractor should present during carrying job being carried out.
Lifting tools and tackles, accessories — Chain blocks, Slings, D -shackles should be certified by the
competent persons before the use and will be in the scope of the contractor.
All consumables, gases, electrodes, are under the scope of contractor
Shifting of required material from CS/Sub stores to the work site will be under the scope of contractor
and should comply with materials handling corporate standard.
Contractor should deploy Hydra /mobile equipment for replacement of pump/gear box, valve, pipe etc.
After the completion of the job materials /scrap to be shifted to scrap yard & housekeeping to be done
as per JSW standards.
Contractor has to ensure the safety of other related nearby equipment’s while working.
All consumables like grinding wheel, DA and oxygen cylinders ,welding electrodes-E6013&E7018 will be in
the scope of the contractor.
All tools and tackles like spanners, Welding machine, grinding machine, oven, cutting set etc. as per job
requirement will be in the scope of the contractor and should comply with JSW safety
standards/Check lists.
1. Job to be carried out at blast furnace area during plant running/shut down only
2. During plant running particular equipment to be electrically isolated and suction and delivery
valves
pumps
6. Inspect the coupling under supervision of JSW engineer, if required the same to be rectified or
engineer
10. Inspect under supervision of JSW engineer and required repair and rectifications to be carried out
as
11. Inspection of gland ropes as per instructions of JSW engineer and if required the same to rectified
or
12. Inspection of sleeves of pumps to be carried out as per instructions and under JSW engineer
supervision and if required the same to be rectified or replaced with new one as per
13. Inspection of impeller of pumps to be carried out as per instructions, under JSW engineer
supervision
and if required the same to be rectified or replaced with new one as per instructions of JSW
engineer
14. Inspection of wear rings of the pumps to be carried out as per instructions, under JSW engineer
supervision and if required the same to be rectified or replaced with new one as per
15. Inspection of bearings of the pumps to be carried out as per instructions and supervision of JSW
engineer and if required the same to be rectified or replaced with new one as per
16. Inspection of shaft of the pumps to be carried out as per instructions and supervision of JSW
engineer
and is required the same to be rectified or replaced with new one as per instructions of JSW
engineer
17. Inspection of foundation bolts to be carried out if founds any abnormal the same to be rectified or
18. Inspect the gasket and the same to be replaced with new one
20. Disconnect the suction and delivery lines as per instructions and the same to be re connected after
giving clearance
21. While carrying the above jobs if any machining to be done the material to be shifted to CRS for
repair
and rectification and the same to re shifted back to work place after completion and as per
instructions
24. After giving clearance regarding alignment only further jobs to be processed
25. Required lubrication to be done to the pumps and spares as per instructions of JSW engineer
26. Photo to be taken during dismantling condition of the pump and after assembling and completion
of
JSW engineer
4. Job to be started after giving clearance from operation, mechanical and electrical
5. Contractor has to make approach platform to work safely inside the cooling tower fan.
7. Inspect the condition of fan blades and if any damages found , same to be replaced.
8. Required crane (Except Hydra) to carry out the job is under scope of JSW
9. Alignment to be carried out and readings should be recorded and should reach
limits as per
requirement
1) Job to be started after giving clearance from operation, Electrical & mechanical department through proper PTW and
LOTO only.
2) Pumps preventive maintenance to be done as per pumps check list & check list to be duly signed by contractor
supervisor.
3) Suction & Discharge valve to be closed with lock out & tag out system to be follow.
7) Check gland seal condition of both DE & NDE side. If gland leakage is heavy leakage replace packing.
8) Checking of gland hose condition & choking. If choke clear the jam & re-fix the hose.
11) Checking pump to motor misalignment. If any misalignment inform the area incharge & align the motor, reading to
be
13) Condition of the suction & delivery bellow, tie rods tightness to be checked.
15) If belt driven pump, check pulleys taper lock bush & pulley groove condition.
19) IF Pump to motor mis-aligned, inform jsw engineer and re-align the motor.
Replacement of parts on site wherever possible. Wherever the pump can be re-commissioned by
replacing the parts in site be done in position.
Wherever the pump needs overhauling to re-commission the pump, the job shall be done in at
specified area or workshop.
Shifting of pump to Workshop is under JVML scope. The pump will be submitted to the workshop
with a problem description.
Inspection of pump & preparation of detailed jobs to be done for repairing of pumps and
refurbishment.
Complete overhauling of the pump consisting of cleaning the parts in the workshop, strip down,
inspection of spares, replacement of the spares, and reassembly of the pump.
All spares are JVML scope ,it may be OEM or others make.
Supervision of installation, alignment, and Trial run at the final stage.
To analyze the reason for repetitive/major failures and submission of observation report
Submission of inspection report of all pumps on a daily basis.
Submission of spare planning details every 6 Months.
Scope of work does not include any Automation/Electrical work.
Maintenance
A mechanical hoist or the like should be used when lifting parts weighing more than 30 kg. The
weights of the pump components are given in the spare parts list.
WARNING!
Before any work is started, follow the JVML Corporate safety standards motor must be disconnected
from the mains or the main Switch turned off and locked so that the pump cannot be started
inadvertently. It will sometimes be necessary to work with the pump in operation when greasing the
bearing and adjusting the shaft seal. When working in the vicinity of the freely rotating shaft, make
sure that all personal equipment is arranged so that it cannot fasten in the rotating parts. Work with
care and exercise good judgment.
Note: all pumps Inspection, maintenance periodic/schedule/break down & Shut down &
Repair/servicing as per OEM recommendations only.
Make of Pumps: KBL, Wilo, Metso & Weir Minerals