1) This document is a permit form from Asia International Maritime Services S.A. for work requiring safety precautions.
2) It describes the work, location, validity period, and authorized person in charge and includes a checklist of safety measures that must be verified before work begins such as isolating energy sources and warning others in the area.
3) The master, authorizing officer, and authorized person in charge must sign off when work starts and is completed.
1) This document is a permit form from Asia International Maritime Services S.A. for work requiring safety precautions.
2) It describes the work, location, validity period, and authorized person in charge and includes a checklist of safety measures that must be verified before work begins such as isolating energy sources and warning others in the area.
3) The master, authorizing officer, and authorized person in charge must sign off when work starts and is completed.
1) This document is a permit form from Asia International Maritime Services S.A. for work requiring safety precautions.
2) It describes the work, location, validity period, and authorized person in charge and includes a checklist of safety measures that must be verified before work begins such as isolating energy sources and warning others in the area.
3) The master, authorizing officer, and authorized person in charge must sign off when work starts and is completed.
Description of work ......................................................................................................................
Location......................................................................................................................................... Validity of permit (should not exceed 24 hours) from.................hrs Date .............................. to......................hrs Date ................................ Authorized person in charge of the work........................................................................................
CHECK LIST Checked
by: AO PC 1 Working aloft, overboard, or on stagings Near the whistle: power cut off and warning notice displayed ¨ ¨ On the funnel: Engineers informed to limit emission of smoke, soots and steam ¨ ¨ Near radio antenna: Officer on watch informed not to use the GMDSS ¨ ¨ Near radar scanners: Officer on watch informed and warning notice displayed ¨ ¨ Vicinity of propellers: Engineers informed and warning notice displayed ¨ ¨ Safety harnesses and lifeline worn (where guard rails not fitted) ¨ ¨ Life jackets worn (works overboard, when they are allowed) ¨ ¨ Stagings inspected and properly secured ¨ ¨ Tool boxes, to be properly secured ¨ ¨ 2 Hot work Area and bilges free of gas and hazardous material ¨ ¨ Adjoining compartments are free of gas and hazardous material ¨ ¨ Ventilation satisfactory ¨ ¨ Equipment in good working order ¨ ¨ Fire appliances in good working order ¨ ¨ 3 Work on machinery and equipment Machinery secured / power cut off ¨ ¨ All relevant persons informed ¨ ¨ Notice of warning displayed ¨ ¨ 4 Electric system Has electric supply been isolated ¨ ¨ All relevant persons informed ¨ ¨ Work notice displayed ¨ ¨ 5. Additonal precautions .................................................................................................................. Master Authorizing Officer (AO) Authorized person in charge (PC)