Professional Documents
Culture Documents
02 RA - Temporary Boundary Fence Fixing Work - P608
02 RA - Temporary Boundary Fence Fixing Work - P608
RISK ASSESSMENT
1 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
2 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
3 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
4 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
Awareness
Following speed Limit on site – 10
mph
Designate Banks man to overlook
the activity.
All the equipment should be
certified by Dubai South approved
for Material Loading and Physical injury
third party.
offloading Property Damage
Pre-operational visual check by
operator
On-site Pre-Task Briefing.
Routine Machinery Checklist.
Ensure visible signage is posted.
Strictly, do not use cell phone while
driving.
Arrangements of Slip 4 4 16 High • Should provide adequate 4 1 4 Low
foundation stones. Trip information and instruction by
AL TURATH AL ASEEL LLC.
PROJECT NAME AND CODE DUBAI SCHOOLS- ALBARSHA - 608
RISK ASSESSMENT
5 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
6 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
7 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
Fixing of fence wall on the • Slip 4 4 16 High • Should provide adequate 4 1 4 Low
foundation stone. • Trip information and instruction by
Manual Handling activity. • Cut injury from induction and tool box talk before
sharpen edges. start the activity.
• Material falling • Should provide proper
• Back pain housekeeping around the site.
AL TURATH AL ASEEL LLC.
PROJECT NAME AND CODE DUBAI SCHOOLS- ALBARSHA - 608
RISK ASSESSMENT
8 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
9 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
10 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
11 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK ASSESSMENT
12 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
RISK MATRIX
SEVERITY
1.NEGLIGIBLE.
2.MINOR.
3.REPORTABLE. 1
5 5 15 20 25
4.SERIOUS. 0
LIKELIHOOD (L)
LIKELIHOOD 5. CATASTROPHIC.
1. IMPROBABLE. CLASS OF RISK (L X S) 4 4 8 12 16 20
2. REMOTE. HIGH = 15 – 25
3.PROBABLE MEDIUM = 07 – 14 3 3 6 9 12 15
4. OCCASIONAL. LOW = 01 - 06
5.FREQUENT 2 2 4 6 8 10
1 1 2 3 4 5
1 2 3 4 5
SEVERITY (S)
AL TURATH AL ASEEL LLC.
PROJECT NAME AND CODE DUBAI SCHOOLS- ALBARSHA - 608
RISK ASSESSMENT
13 of 13 Prepared by :
Page Number:
DATE Mr. Thomas Johny Sheela
REV: 06/08/2023 ENG. AHMED ALDERBI
Notes : N=Number of people affected S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L