REPLACE MAINTENANCE BUILDING AT RAS

TANUTA TERMINAL SOUTH


Target Contruction S. A. DATE: APRIL 21, 2016
REVSION NO. 00
PROCEDURE FOR HYDROSTATIC TEST
ATTACHMENT III
BI-.I. No. 10-00675 Contract No. 6600033483 Phase: Contruction Ref. # QCP-MECH-002

Table 1 : Pressure Test Requirements: Test Pressure & Duration


DURATION (HRS)
SERVICE PIPES TEST PRESSURE (Kpa/PSI) REFERENCE
BURRIED EXPOSED
Hot/cold potable & Non-potable water 1034/150 24 4 SAES-S-040 & 060
Fire Protection Water 1380/200 24 4 saes-B-017
Chilled Water (Supply/Return 1034/150 24 4 ASME B31.9
Force Mains 1034/150 24 4 SAES-S-070

TABLE 2 : Gravity Test Requirements: Water Head & Duration


DURATION (HRS)
SERVICE PIPES WATER FILLING LEVEL REFERENCE
BURRIED EXPOSED
Waste & Sewer 3 m head 24 4 SAES-S-010
Laboratory Waste 3 m head 24 4 SAES-S-070
Vent Pipes Till Highest point of pipe 24 4 SAES-S-070
Storm Water drainage 3 m head 24 4 SAES-S-030
Condesate Drainage 3 m head 24 4 ASME B31.9
Manhole Chambers Fully filled till top of rim 24 8 SAES-S-070, SATR-S-4002
Note1: Burried: Are pipe with the joints that cannot be kept exposed during hydrotesting
Note2: Exposed: Are pipe (above ground or underground) kept exposed during hydro testing
Note3: These requirements are applicable for all pipe materials and for indoor/outdoor application