This document provides the requirements for hydrostatic pressure and gravity tests for various service pipes at the Ras Tanuta Terminal South maintenance building project. It outlines the required test pressures and durations for buried and exposed pipes for services like potable water, fire protection, chilled water, and force mains. It also specifies the water filling levels and test durations for gravity tests on waste, sewer, laboratory waste, vent, storm drainage, condensate drainage, and manhole chambers. All pipes must be tested according to the specified standards based on their material and indoor or outdoor application.
This document provides the requirements for hydrostatic pressure and gravity tests for various service pipes at the Ras Tanuta Terminal South maintenance building project. It outlines the required test pressures and durations for buried and exposed pipes for services like potable water, fire protection, chilled water, and force mains. It also specifies the water filling levels and test durations for gravity tests on waste, sewer, laboratory waste, vent, storm drainage, condensate drainage, and manhole chambers. All pipes must be tested according to the specified standards based on their material and indoor or outdoor application.
This document provides the requirements for hydrostatic pressure and gravity tests for various service pipes at the Ras Tanuta Terminal South maintenance building project. It outlines the required test pressures and durations for buried and exposed pipes for services like potable water, fire protection, chilled water, and force mains. It also specifies the water filling levels and test durations for gravity tests on waste, sewer, laboratory waste, vent, storm drainage, condensate drainage, and manhole chambers. All pipes must be tested according to the specified standards based on their material and indoor or outdoor application.
Target Contruction S. A. DATE: APRIL 21, 2016 REVSION NO. 00 PROCEDURE FOR HYDROSTATIC TEST ATTACHMENT III BI-.I. No. 10-00675 Contract No. 6600033483 Phase: Contruction Ref. # QCP-MECH-002
Table 1 : Pressure Test Requirements: Test Pressure & Duration
DURATION (HRS) SERVICE PIPES TEST PRESSURE (Kpa/PSI) REFERENCE BURRIED EXPOSED Hot/cold potable & Non-potable water 1034/150 24 4 SAES-S-040 & 060 Fire Protection Water 1380/200 24 4 saes-B-017 Chilled Water (Supply/Return 1034/150 24 4 ASME B31.9 Force Mains 1034/150 24 4 SAES-S-070
TABLE 2 : Gravity Test Requirements: Water Head & Duration
DURATION (HRS) SERVICE PIPES WATER FILLING LEVEL REFERENCE BURRIED EXPOSED Waste & Sewer 3 m head 24 4 SAES-S-010 Laboratory Waste 3 m head 24 4 SAES-S-070 Vent Pipes Till Highest point of pipe 24 4 SAES-S-070 Storm Water drainage 3 m head 24 4 SAES-S-030 Condesate Drainage 3 m head 24 4 ASME B31.9 Manhole Chambers Fully filled till top of rim 24 8 SAES-S-070, SATR-S-4002 Note1: Burried: Are pipe with the joints that cannot be kept exposed during hydrotesting Note2: Exposed: Are pipe (above ground or underground) kept exposed during hydro testing Note3: These requirements are applicable for all pipe materials and for indoor/outdoor application
Hydraulic Tables; The Elements Of Gagings And The Friction Of Water Flowing In Pipes, Aqueducts, Sewers, Etc., As Determined By The Hazen And Williams Formula And The Flow Of Water Over The Sharp-Edged And Irregular Weirs, And The Quantity Discharged