Professional Documents
Culture Documents
LAUNCHING GIRDERS
BRIDGE DECKS
MATERIAL HANDLING
What is the construction methodology of bridge decks when river are heavy
flowing and it is risky to use barge cranes?
2 BRIDGE DECKS
Describe the launching girder method of bridge construction with detailed sketches
Describe the segmental method of bridge construction
Explain the different types of bridges in detail.
Why SLIPFORM type of formwork is required and for what type of structures?
Write a brief note on Slip forms.
. Write a detailed note on equipment for bridges.
Describe the various methods of construction of bridges.
Differentiate between Cable Stayed Bridge and Bow String Bridge.
Differentiate between Bridge deck and space deck. ****** Dec 2009
What is meant by Bridge Deck? ***** Nov 2009
What are the various components of a Bridge Deck? Also list the
classifications of Decks.
What is Segmental Construction of bridges?
Write a detailed note on equipment for bridges.
Describe the various methods of construction of bridges.
7 MATERIAL HANDLING
Discuss the various types of material Handling structures and systems
1 What is Boom Placer and how is it better than conveying concrete by belt conveyor?
2
8 ERECTING LIGHT WEIGHT COMPONENTS ON TALL STRUCTURES
Mention any two equipment used for erection of tall structures.
List out different types of cranes and their salient features.
List out the various methods of Erection of Sky Scrappers and the
corresponding equipment used.
Mention any two equipment used for erection of tall structures.