You are on page 1of 20

Monitoring Progress Proyek

Renovasi Pekerjaan Atap dan Pintu Bpk. Doli


Jl. Pangrango Raya, Bekasi Barat
ARTURE BUILDING

Nilai Proyek : Rp 41,980,000


Durasi Pengerjaan : 14 Hari
Jenis Proyek : Material & Jasa Konstruksi

8/6/2022
Volume
No Uraian Pekerjaa Satuan Volume Ri
S/D S/D
Ra Skrng
Lalu Skrng
1 Pek. Kanopi Atap Baja Ringan m2 36.00 - 3.60 3.60
a Material
Kontrak Mandor - - - - -

b Tenaga
Tukang Org 3 - 3 3

2 Tambahan Baja Ringan btg 30.00 - - -


a Material
Baja Ringan btg 30 - - -

b Tenaga
Tukang Org - - - -

3 Tambahan Reng Baja Ringan btg 12.00 - - -


a Material
Reng Baja Ringan btg 12 - - -

b Tenaga
Tukang Org - - - -

4 Pintu Handerson + Akrilik m2 7.35 - - -


a Material
Kontrak Mandor - - - - -

b Tenaga
Tukang Org - - - -

5 Pek. Aluminium Foil & Penutup Plafond m2 36.00 - - -


a Material
Kontrak Mandor - - - - -

b Tenaga
Tukang Org - - - -

6 Tambahan Baja Ringan btg 12.00 - - -


a Material
Baja Ringan btg 12 - - -
Ruping bngks 2 - - -

b Tenaga
Tukang Org - - - -
8/6/2022 12/6/2022
ume Ri Progress Ri Volume Ri Progress Ri
S/D S/D S/D
Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng
Lalu Skrng Lalu
(32.40) 0% 10% 10% -90%

(30.00) 0% 0% 0% -100%

(30)

(12.00) 0% 0% 0% -100%

(12)

(7.35) 0% 0% 0% -100% 0.50 0.25 0.75 (6.60) 7% 3%

(36.00) 0% 0% 0% -100% - - - (36.00) 0% 0%

(12.00) 0% 0% 0% -100%
(12)
(2)

-
13/6/2022
Progress Ri Volume Ri Progress Ri Volume Ri
S/D S/D S/D
Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu
Skrng Lalu Skrng

10% -90% 0.75 0.25 1.00 (6.35) 10% 3% 14% -86% 1.00

0% -100% - - - (36.00) 0% 0% 0% -100% -


14/6/2022 15/6/2022
Volume Ri Progress Ri Volume Ri
S/D S/D
Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa
Lalu Skrng

0.25 1.25 (6.10) 14% 3% 17% -83% 1.25 0.25 1.50 (5.85)

- - (36.00) 0% 0% 0% -100% - - - (36.00)


15/6/2022 16/6/2022
Progress Ri Volume Ri Progress Ri
S/D S/D S/D S/D
Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa
Lalu Skrng Lalu Skrng

17% 3% 20% -80% 1.50 0.25 1.75 (5.60) 20% 3% 24% -76%

0% 0% 0% -100% - - - (36.00) 0% 0% 0% -100%


17/6/2022 18/6/2022
Volume Ri Progress Ri Volume Ri
S/D S/D
S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng
Lalu Skrng

1.75 0.25 2.00 (5.35) 24% 3% 27% -73% 2.00 0.25 2.25

- - - (36.00) 0% 0% 0% -100% - - -
18/6/2022 19/6/2022
me Ri Progress Ri Volume Ri Progress Ri
S/D S/D S/D
Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng
Lalu Skrng Lalu

(5.10) 27% 3% 31% -69% 2.25 0.25 2.50 (4.85) 31% 3%

(36.00) 0% 0% 0% -100% - - - (36.00) 0% 0%


20/6/2022
Progress Ri Volume Ri Progress Ri Volume
S/D S/D S/D
Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu
Skrng Lalu Skrng

34% -66% 2.50 0.25 2.75 (4.60) 34% 3% 37% -63% 2.75

0% -100% - - - (36.00) 0% 0% 0% -100% -


24/6/2022 25/6/2022
Volume Ri Progress Ri Volume Ri
S/D S/D
Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa
Lalu Skrng

0.25 3.00 (4.35) 37% 3% 41% -59% 0.25 0.25 0.50 (6.85)

9.00 9.00 (27.00) 0% 25% 25% -75% 9.00 9.00 18.00 (18.00)
25/6/2022 26/6/2022
Progress Ri Volume Ri Progress Ri
S/D S/D S/D S/D
Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa
Lalu Skrng Lalu Skrng

3% 3% 7% -93% 0.25 0.25 0.50 (6.85) 3% 3% 7% -93%

25% 25% 50% -50% 18.00 9.00 27.00 (9.00) 50% 25% 75% -25%