Volume
No Uraian Pekerjaa Satuan Volume Ri
S/D S/D
Ra Skrng
Lalu Skrng
1 Pek. Kanopi Atap Baja Ringan m2 36.00 - 3.60 3.60
a Material
Kontrak Mandor - - - - -
b Tenaga
Tukang Org 3 - 3 3
b Tenaga
Tukang Org - - - -
b Tenaga
Tukang Org - - - -
b Tenaga
Tukang Org - - - -
b Tenaga
Tukang Org - - - -
b Tenaga
Tukang Org - - - -
8/6/2022 12/6/2022
ume Ri Progress Ri Volume Ri Progress Ri
S/D S/D S/D
Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng
Lalu Skrng Lalu
(32.40) 0% 10% 10% -90%
(30.00) 0% 0% 0% -100%
(30)
(12.00) 0% 0% 0% -100%
(12)
(12.00) 0% 0% 0% -100%
(12)
(2)
-
13/6/2022
Progress Ri Volume Ri Progress Ri Volume Ri
S/D S/D S/D
Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu
Skrng Lalu Skrng
10% -90% 0.75 0.25 1.00 (6.35) 10% 3% 14% -86% 1.00
0.25 1.25 (6.10) 14% 3% 17% -83% 1.25 0.25 1.50 (5.85)
17% 3% 20% -80% 1.50 0.25 1.75 (5.60) 20% 3% 24% -76%
1.75 0.25 2.00 (5.35) 24% 3% 27% -73% 2.00 0.25 2.25
- - - (36.00) 0% 0% 0% -100% - - -
18/6/2022 19/6/2022
me Ri Progress Ri Volume Ri Progress Ri
S/D S/D S/D
Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng
Lalu Skrng Lalu
7/6/2022
Volume
No Uraian Pekerjaan Satuan Volume Ri
Ra S/D Lalu Skrng S/D Skrng Sisa
b Tenaga
Tukang Org 1 - 1 1 -
7/6/2022 8/6/2022
Progress Ri Volume Ri Progress Ri
S/D Lalu Skrng S/D Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa S/D Lalu Skrng S/D Skrng
0% 43% 43% -57% 11.20 10.00 21.20 (4.80) 43% 38% 82%
- - - -
- 1 1 -
9/6/2022
ess Ri Volume Ri Progress Ri
Sisa S/D Lalu Skrng S/D Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa
- - - -
- 1 1 -