Monitoring Progress Proyek

Renovasi Pekerjaan Atap dan Pintu Bpk. Doli


Jl. Pangrango Raya, Bekasi Barat
ARTURE BUILDING

Nilai Proyek : Rp 41,980,000


Durasi Pengerjaan : 14 Hari
Jenis Proyek : Material & Jasa Konstruksi

8/6/2022
Volume
No Uraian Pekerjaa Satuan Volume Ri
S/D S/D
Ra Skrng
Lalu Skrng
1 Pek. Kanopi Atap Baja Ringan m2 36.00 - 3.60 3.60
a Material
Kontrak Mandor - - - - -

b Tenaga
Tukang Org 3 - 3 3

2 Tambahan Baja Ringan btg 30.00 - - -


a Material
Baja Ringan btg 30 - - -

b Tenaga
Tukang Org - - - -

3 Tambahan Reng Baja Ringan btg 12.00 - - -


a Material
Reng Baja Ringan btg 12 - - -

b Tenaga
Tukang Org - - - -

4 Pintu Handerson + Akrilik m2 7.35 - - -


a Material
Kontrak Mandor - - - - -

b Tenaga
Tukang Org - - - -

5 Pek. Aluminium Foil & Penutup Plafond m2 36.00 - - -


a Material
Kontrak Mandor - - - - -

b Tenaga
Tukang Org - - - -

6 Tambahan Baja Ringan btg 12.00 - - -


a Material
Baja Ringan btg 12 - - -
Ruping bngks 2 - - -

b Tenaga
Tukang Org - - - -
8/6/2022 12/6/2022
ume Ri Progress Ri Volume Ri Progress Ri
S/D S/D S/D
Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng
Lalu Skrng Lalu
(32.40) 0% 10% 10% -90%

(30.00) 0% 0% 0% -100%

(30)

(12.00) 0% 0% 0% -100%

(12)

(7.35) 0% 0% 0% -100% 0.50 0.25 0.75 (6.60) 7% 3%

(36.00) 0% 0% 0% -100% - - - (36.00) 0% 0%

(12.00) 0% 0% 0% -100%
(12)
(2)

-
13/6/2022
Progress Ri Volume Ri Progress Ri Volume Ri
S/D S/D S/D
Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu
Skrng Lalu Skrng

10% -90% 0.75 0.25 1.00 (6.35) 10% 3% 14% -86% 1.00

0% -100% - - - (36.00) 0% 0% 0% -100% -


14/6/2022 15/6/2022
Volume Ri Progress Ri Volume Ri
S/D S/D
Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa
Lalu Skrng

0.25 1.25 (6.10) 14% 3% 17% -83% 1.25 0.25 1.50 (5.85)

- - (36.00) 0% 0% 0% -100% - - - (36.00)


15/6/2022 16/6/2022
Progress Ri Volume Ri Progress Ri
S/D S/D S/D S/D
Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa
Lalu Skrng Lalu Skrng

17% 3% 20% -80% 1.50 0.25 1.75 (5.60) 20% 3% 24% -76%

0% 0% 0% -100% - - - (36.00) 0% 0% 0% -100%


17/6/2022 18/6/2022
Volume Ri Progress Ri Volume Ri
S/D S/D
S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng
Lalu Skrng

1.75 0.25 2.00 (5.35) 24% 3% 27% -73% 2.00 0.25 2.25

- - - (36.00) 0% 0% 0% -100% - - -
18/6/2022 19/6/2022
me Ri Progress Ri Volume Ri Progress Ri
S/D S/D S/D
Sisa Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng
Lalu Skrng Lalu

(5.10) 27% 3% 31% -69% 2.25 0.25 2.50 (4.85) 31% 3%

(36.00) 0% 0% 0% -100% - - - (36.00) 0% 0%


20/6/2022
Progress Ri Volume Ri Progress Ri
S/D S/D S/D
Sisa S/D Lalu Skrng S/D Skrng Sisa Skrng Sisa
Skrng Lalu Skrng

34% -66% 2.50 0.25 2.75 (4.60) 34% 3% 37% -63%

0% -100% - - - (36.00) 0% 0% 0% -100%


Monitoring dan Evaluasi Progress Proyek
Renovasi Pekerjaan Dinding Roster Bpk. Bagas
Perumahan Terasbali Premier Blok E7 Cibubur
ARTURE BUILDING

Nilai Proyek : Rp 1,599,000


Durasi Pengerjaan : 3 Hari
Jenis Proyek : Jasa Konstruksi

7/6/2022
Volume
No Uraian Pekerjaan Satuan Volume Ri
Ra S/D Lalu Skrng S/D Skrng Sisa

1 Pekerjaan Pasangan Roster m2 26.00 - 11.20 11.20 (14.80)


a Material
Owner - - - - - -

b Tenaga
Tukang Org 1 - 1 1 -
7/6/2022 8/6/2022
Progress Ri Volume Ri Progress Ri
S/D Lalu Skrng S/D Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa S/D Lalu Skrng S/D Skrng

0% 43% 43% -57% 11.20 10.00 21.20 (4.80) 43% 38% 82%

- - - -

- 1 1 -
9/6/2022
ess Ri Volume Ri Progress Ri
Sisa S/D Lalu Skrng S/D Skrng Sisa S/D Lalu Skrng S/D Skrng Sisa

-18% 21.20 5.32 26.52 0.52 82% 20% 102% 2%

- - - -

- 1 1 -