Urinal (Carys S4020104) was provided and fixed with tools, tackles, labour and equipment. The rate analysis includes 6 items - the urinal, fasteners, waste pipe, spreader, labour charges, and additional charges for water, contractor profit and total cost. The total cost for 1 unit was Rs. 1046.
Urinal (Carys S4020104) was provided and fixed with tools, tackles, labour and equipment. The rate analysis includes 6 items - the urinal, fasteners, waste pipe, spreader, labour charges, and additional charges for water, contractor profit and total cost. The total cost for 1 unit was Rs. 1046.
Urinal (Carys S4020104) was provided and fixed with tools, tackles, labour and equipment. The rate analysis includes 6 items - the urinal, fasteners, waste pipe, spreader, labour charges, and additional charges for water, contractor profit and total cost. The total cost for 1 unit was Rs. 1046.
Provinding and fixing of Cera Brand Urinal ( Carys S4020104) with all tools, tackles, labour, equipment complete as directed by EIC.
Details N L B D /H Qty. Unit Unit Rate Total
Amount
1 Urinal Carys S4020104 1.00 Each 2676.24 2676.24
2 Fastner 2.00 Each 80.00 160.00 Providing and fixing C.P. 3 brass waste for washbasin or 1.00 Each 600.00 600.00 sink. F8050101 Waste Pipe for Wash basin 4 C.P. 40 mm dia (SOR - 1.00 Each 80.00 80.00 M603) Urnial Spreader (Cera 5 1.00 Each 850.00 850.00 F8070201) 6 Labour plumber(SOR) 1.00 Each 303.00 303.00