List of Pending/Ongoing/Completed Work Date: 07-11-2023

Sl no Assigned work To be done by Status TCD


1 Updating List
Updated journal list Saswat & Ashish Completed 21/07/2023
Updated conference list Saswat & Ashish Completed 21/08/2023
2 Pending review work
Paper Name Due date Extended date
COLSUA-D-23-04636 27 Aug 2023 ̶ Pending 27 Aug 2023
Ankush
PVENG-1421_R1_reviewer 11 Sept 2023 ̶ Pending 11 Sept 2023
OCMA-D-23-00517_R1_reviewer 8 Sept 2023 ̶ Complete 8 Sept 2023
Saswat
CONBUILDMAT-D-23-07391_ 30 Aug 2023 ̶ Pending 30 Aug 2023
MTENG-16733_R1_reviewer 16 Sept 2023 ̶ Complete 16 Sept 2023
Ashish
JPRT-D-23-00247 12 Sept 2023 ̶ Pending 12 Sept 2023
3 Lecture Preparation
Ankush, Ashish &
NPTEL Ongoing
Saswat
4 Report Checking
Ankush, Ashish &
PMGSY Ongoing
Saswat
5 Fabrication
Bucket for mixing asphalt mature (2 nos) Saswat & Ashish Completed 4 Aug 2023
Basket for drain down test (2 nos) Saswat & Ashish Ongoing TBD
Horizontal permeability Saswat & Ashish Pending TBD
Rainwater simulator Saswat & Ashish Pending TBD
6 Project proposal/Research paper drafting
Perpetual pavement project draft Saswat Ongoing 28/08/2023
Jute fiber project proposal Ashish Ongoing 01/09/2023
Paper writing for MTech, 2021-23 batch Saswat & Ashish Ongoing 18/09/2023
TCD: Tentative completion date TBD: To be decided