MONTH :
NO. LOCATION CONDITION Switch Pressure REMARK
Pressure PUMP position Cut in Cut off
1 Jockey pump
2 Sprinkel pump 1
3 Sprinkel pump 2
4 Jokey pump
5 Sprinkel pump 3
6 Sprinkel pump 4
7 Jokey pump
8 Sprinkel pump 5
9 Sprinkel pump 6
10 Jokey pump
11 Hydrant pump 1
12 Hydrant pump 2
Prepared by Acknowledge :
MONTH : June
NO. LOCATION CONDITION Switch Pressure REMARK
Pressure PUMP position Cut in Cut off
1 Jockey pump
2 Hydrant pump 1
3 Hydrant pump 2
Prepared by Acknowledge :
Fls (Chief Engineer)
Shangri-la Hotel Surabaya
Fire Life Safety - Engineering Department
NO. TIME:
STANDARD CONDITON CONDITON CONDITON CONDITON CONDITION CONDITON
LOCATION STATUS STATUS STATUS STATUS STATUS STATUS
Pressure Pump STATUS Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump
REMARKS (REASON /
EXPLANATION)
I have carried out the above visual checks & confirm the results are as recorded.
LEGEND: INSPECTED BY : ACKNOWLEDGED BY :
1. V = GOOD
2. X = POOR
3. SB = STANDBY
4. RUN = RUNNING
GIVE REASON WHY THE PUMP IS RUNNING WHEN DO INSPECTION (REMARKS) - NUMBER 4
5. TRP = TRIP FLS STAFF FLSM / DOE
GIVE REASON WHY AND FOLLOW UP PROGRESS (REMARKS) - NUMBER 5
6. OFF = TURN OFF PURPOSELY
PLEASE GIVE REASON WHY PUMP IN OFF CONDITION (REMARKS) - NUMBER 6
7. DO = DAY OFF (NO STAFF FLS WORKING AT THAT DAY)