Professional Documents
Culture Documents
Engineering Department
MONTH :
NO. LOCATION CONDITION Switch Pressure REMARK
Pressure PUMP position Cut in Cut off
1 Jockey pump
2 Sprinkel pump 1
3 Sprinkel pump 2
4 Jokey pump
5 Sprinkel pump 3
6 Sprinkel pump 4
7 Jokey pump
8 Sprinkel pump 5
9 Sprinkel pump 6
10 Jokey pump
11 Hydrant pump 1
12 Hydrant pump 2
Prepared by Acknowledge :
MONTH : June
NO. LOCATION CONDITION Switch Pressure REMARK
Pressure PUMP position Cut in Cut off
1 Jockey pump
2 Hydrant pump 1
3 Hydrant pump 2
Prepared by Acknowledge :
Fls (Chief Engineer)
Shangri-la Hotel Surabaya
Fire Life Safety - Engineering Department
NO. TIME:
CONDITON CONDITON CONDITON CONDITON CONDITION CONDITON CONDITON
LOCATION STATUS STATUS STATUS STATUS STATUS STATUS STATUS
Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump
1 SP1(DUTY)
2 SP2(STANDBY)
3 SP3(JOCKEY)
4 SP4(DUTY)
5 SP5(STANDBY)
6 SP6(JOCKEY)
7 WSP1(STANDBY)
8 WSP2(DUTY)
9 WSP3(JOCKEY)
10 FSP1(DUTY)
11 FSP2(STANDBY)
12 JOCKEY PUMP
REMARKS (REASON /
EXPLANATION)
I have carried out the above visual checks & confirm the results are as recorded.
LEGEND: INSPECTED BY : ACKNOWLEDGED BY :
1. V = GOOD
2. X = POOR
3. SB = STANDBY
4. RUN = RUNNING
GIVE REASON WHY THE PUMP IS RUNNING WHEN DO INSPECTION (REMARKS) - NUMBER 4
5. TRP = TRIP FLS STAFF FLSM / DOE
GIVE REASON WHY AND FOLLOW UP PROGRESS (REMARKS) - NUMBER 5
6. OFF = TURN OFF PURPOSELY
PLEASE GIVE REASON WHY PUMP IN OFF CONDITION (REMARKS) - NUMBER 6
7. DO = DAY OFF (NO STAFF FLS WORKING AT THAT DAY)