You are on page 1of 4

Shangri-la Hotel Surabaya

Engineering Department

MOTORIZE VALVE HYDRANT PUMP TEST

MONTH :
NO. LOCATION CONDITION Switch Pressure REMARK
Pressure PUMP position Cut in Cut off

1 Jockey pump
2 Sprinkel pump 1
3 Sprinkel pump 2
4 Jokey pump
5 Sprinkel pump 3
6 Sprinkel pump 4
7 Jokey pump
8 Sprinkel pump 5
9 Sprinkel pump 6
10 Jokey pump
11 Hydrant pump 1
12 Hydrant pump 2

Prepared by Acknowledge :

Fls (Chief Engineer)


Shangri-la Hotel Surabaya
Engineering Department

MOTORIZE VALVE HYDRANT PUMP TEST

MONTH : June
NO. LOCATION CONDITION Switch Pressure REMARK
Pressure PUMP position Cut in Cut off

1 Jockey pump

2 Hydrant pump 1

3 Hydrant pump 2

Prepared by Acknowledge :
Fls (Chief Engineer)
Shangri-la Hotel Surabaya
Fire Life Safety - Engineering Department

FIRE PUMP DAILY INSPECTION


MONTH: __________________
DATE:

NO. TIME:
CONDITON CONDITON CONDITON CONDITON CONDITION CONDITON CONDITON
LOCATION STATUS STATUS STATUS STATUS STATUS STATUS STATUS
Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump Pressure Pump

1 SP1(DUTY)

2 SP2(STANDBY)

3 SP3(JOCKEY)

4 SP4(DUTY)

5 SP5(STANDBY)

6 SP6(JOCKEY)

7 WSP1(STANDBY)

8 WSP2(DUTY)

9 WSP3(JOCKEY)

10 FSP1(DUTY)

11 FSP2(STANDBY)

12 JOCKEY PUMP

REMARKS (REASON /
EXPLANATION)

I have carried out the above visual checks & confirm the results are as recorded.
LEGEND: INSPECTED BY : ACKNOWLEDGED BY :
1. V = GOOD
2. X = POOR
3. SB = STANDBY
4. RUN = RUNNING
GIVE REASON WHY THE PUMP IS RUNNING WHEN DO INSPECTION (REMARKS) - NUMBER 4
5. TRP = TRIP FLS STAFF FLSM / DOE
GIVE REASON WHY AND FOLLOW UP PROGRESS (REMARKS) - NUMBER 5
6. OFF = TURN OFF PURPOSELY
PLEASE GIVE REASON WHY PUMP IN OFF CONDITION (REMARKS) - NUMBER 6
7. DO = DAY OFF (NO STAFF FLS WORKING AT THAT DAY)

You might also like