Daily Report Status on 8-11-2023

Quantity Executed
SL.No Area Unit Balance Labour Deployed Net Balance Remark
Today

Roof Truss , Sky light Area, Welder are engaged


Lower Roof Truss , Facia all to finish the truss
1 complete with ramp super MT 93.5 2.5 91 work.
70
structure

2 Lower Truss Erection MT 70 12 58


3 Fixed Link Fabrication MT 168.4 9 3 165.4
4 Facade Framing(MS) SQM 1310 25 30 1280
Labour Engaged for fabrication & shifting material

5 Facade Aluminium Framing SQM 4633 25 283 4350


6 Facade DGU glass Fixing SQM 4576 22 60 4516
7 Flooring Mezzanine-Granite SQM 1262 3 28 1234
Flooring Ground Floor-Granite SQM 5 40 Cum. Quantity as on date 295 sqm
8
Toilet Tiles - Wall SQM 1447 8 45 1402
9
Dado(Ground Floor)
Bottom Liner(Including Lower SQM 3000 4 0 3000
10
Truss)
Cement Board (Including SQM 12136 7 580 11556 Labour Engaged to fix Top Hat Batten &
11 VCL Layer fixing & Material Shifting
Lower Roof Truss)
12 Brick Work CUM 36.5 7 1.5 35
13 Plaster Work-Gypsum SQM 661 7 55 606
14 Misc Work at site 47
15 Painting Work 8
247