CALCULATION OF BUILDING STRUCTURE ANALYSIS

PT SEMEN JAWA – WHG BUILDING, SUKABUMI


Document No. Rev. Contract No. Page
0 1

CALCULATION AND ANALYSIS OF BUILDING

PT SEMEN JAWA – WHG BUILDING, SUKABUMI

Picture 1 Project Location

Picture 2 Modeling Picture in SAP 2002


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 2

CALCULATION AND ANALYSIS OF


BUILDING
CONTRACT NO.
PT SEMEN JAWA – WHG, SUKABUMI

Picture 3 Modeling Picture in SAP 2002

ISSUED FOR APPROVAL BKA BKA BKA AGS


By Chk App App’d
Description ’d 'd
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 3

TABULATION OF REVISED SHEETS


REVISIONS REVISIONS
SHEET SHEET
A B C 0 1 2 3 4 A B C 0 1 2 3 4
41
2 42
3 43
4 44
5 45
6 46
7 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80

1. GENERAL DESCRIPTION
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 4

1.1Scope

This document presents design calculation of Building Structure and Roof Analysis for steel structure
will be perform and calculate by SAP 2000 Structure Spesification:
a. Length = 30 m
b. Width = 18 m
c. Hright = 20.36m
d. Upper structure material = Steel Structure
e. Sub –Structure Material = Concrete Structure

Picture 4 Modeling Picture in SAP 2002


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 5

1.2 Code, Standards, and Refferences

a. SNI 2847: 2013 Persyaratan Beton Struktural Untuk Bangunan

b. SNI 1726: 2012 Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung dan non
Gedung
c. SNI 1727: 2013 Beban Minimum Untuk Perancangan Bangunan Gedung dan
Struktur Lain
d. PPIUG 1983.

1.3 Quality Of Material


No Material Description Value Unit
C-35
1 Concrete
Compressive strength at 28 days 350 Kg/cm2
Deformed reinforcing steel bar
2
(fy)
Yield strength
3000 Kg/cm2

3 Plain reinforcing steel bat (fy) Yield strength


2400 Kg/cm2

1.4 Quality Of Material


No Material Value Unit

1 Steel Structure 7850 kg/m3


2 Structural Concrete 2400 kg/m3
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 6

2. LOADING DESIGEN
He following loads and forces are considered in the design of steel structurer
2.1 Load Type
a. Dead Load (DL)
- Selfweight of steel structure
- Wall and Floor cladding Weight
- MEP
b. Live Load (LL)
- Load at slab
- Load at roof construction
c. Wind Load (WL)
- Wind load from left side of the building = 25 kg
- Wind load from right side of the building = 25 kg
d. Sejsmic (QL)
The structure is to be designed to resist Seismic Force induced as lateral static equivalentthe lateral
seismic force will be calculated base on indonesian code SNI.

2.2 Load Calculation


a. Dead Load
- First floor
 All Selfweight of Structural Steel Shall be Calculated with SAP 2000
 Brick = 100 kg/m²
 Mortar = 21 kg/m²
 MEP = 30 kg/m²
- Second Floor
 All Selfweight of Structural Steel Shall be Calculated with SAP 2000
 MEP = 30 kg/m²
 Steel Structure = 22 kg/m²
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 7

 Mesin yang ada di dalam pabrik = 30 000 kg/ m²


 Solar PV = 11.09 kg/m² (solar panel load is input to the revter)
b. Live Load
- First Floor
 Load at Slab = 420 kg/m²
- Secound Floor
 Load at Roof From Construction Worker = 100 kg/m²
c. Wind Load
Wind Load = 25 kg/m
d. Seismic Load
Seismic Load is calculated based on SNI 1726-2019 with Static Equivalent Method
Table 1 Occupancy Categories
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 8

Table 2 Site Geology and Soil Characteristic

Gudang Penyimpanan, dan WHG kategori resiko =1


Faktor Keutamaan Gempa Ie = 1.0

Table 2 Structural System


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 9

S1 = 1.733 g
SS = 0.626 g
Fa =1
Fy = 1.5
Sms = 1.733 X 1 = 1.733
SM1 = 0.626 X 1.5 = 0.939
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 10
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 11

R=8
Ct = 0.0466
X = 0.9
Ta = Ct X hnx

= 0.0466 X 0.9
= 0.04194 X
6.60.9

= 0.25
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 12
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 13

2.3 Loaad Combination

\
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 14

2.4 Gording Strength Calculation


The size and roof slope of the gording is assumed to be based on the minimum size of the
gording used for the roof truss
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 15
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 16
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 17

3. STRUCTURAL ANALYSIS AND DESIGEN


3.1 Structural Propertis
Due To The Lack Of Detailed Pictures Of Beams And Roof Frame The Writer Assumes The
Size Of Beams And Column From Photos Of Field Survey Results
Rafter = Canel doble 250 x 70 x 20 x 2.5
Kuda kuda = siku doble 50 x 50 x 5
Win Brace = siku doble 50 x 50 x 5
Win Brace = C150
Colom = 1050 x 500
= 400 x 400
Beam = 200 x 350
= 250 x 450

Picture 5 Modeling Picture in SAP 2002


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 18

3.2 Analysis Result


The focus of observation in the analysis of the building structure lies in the part of the frame
that is loaded with solar panels
a. Beam and Colom
From the results of building analysis using the sap 2000 application there are not records
or errors in the structure with solar panel installation.
From the conclusion above this building is safe to install the solar panels according to the
installation plan.
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 19

b. Roof truss
The structure below are calculated by SAP 2000 (computer program for civil structure)
and these are the result for stress ratio. The structure will meet therequirement if the value
of stress ratio < 1.
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 20

C. Support Reaction Summary

TABLE: Concrete Design 1 - Column Summary Data - ACI 318-14


Frame DesignSect DesignTyp DesignOp Status Location
PMMComb
e t o
Text Text Text Text Text m Text
55 KILOM1050 X Column Check No 0 DCON6
500 Messages
55 KILOM1050 X Column Check No 2 DCON6
500 Messages
55 KILOM1050 X Column Check No 4 DCON1
500 Messages
56 KILOM1050 X Column Check No 0 DCON6
500 Messages
56 KILOM1050 X Column Check No 2 DCON1
500 Messages
56 KILOM1050 X Column Check No 4 DCON1
500 Messages
57 KILOM1050 X Column Check No 0 DCON1
500 Messages
57 KILOM1050 X Column Check No 2 DCON1
500 Messages
57 KILOM1050 X Column Check No 4 DCON3
500 Messages
59 KOLOM 400 X Column Check No 0 DCON4
400 Messages
59 KOLOM 400 X Column Check No 2 DCON4
400 Messages
59 KOLOM 400 X Column Check No 4 DCON1
400 Messages
60 KOLOM 400 X Column Check No 0 DCON5
400 Messages
60 KOLOM 400 X Column Check No 2 DCON1
400 Messages
60 KOLOM 400 X Column Check No 4 DCON5
400 Messages
61 KOLOM 400 X Column Check No 0 DCON5
400 Messages
61 KOLOM 400 X Column Check No 2 DCON1
400 Messages
61 KOLOM 400 X Column Check No 4 DCON5
400 Messages
63 KOLOM 400 X Column Check No 0 DCON4
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 21

400 Messages
63 KOLOM 400 X Column Check No 2 DCON4
400 Messages
63 KOLOM 400 X Column Check No 4 DCON1
400 Messages
64 KOLOM 400 X Column Check No 0 DCON6
400 Messages
64 KOLOM 400 X Column Check No 2 DCON1
400 Messages
64 KOLOM 400 X Column Check No 4 DCON6
400 Messages
65 KOLOM 400 X Column Check No 0 DCON6
400 Messages
65 KOLOM 400 X Column Check No 2 DCON1
400 Messages
65 KOLOM 400 X Column Check No 4 DCON6
400 Messages
67 KILOM1050 X Column Check No 0 DCON18
500 Messages
67 KILOM1050 X Column Check No 2 DCON6
500 Messages
67 KILOM1050 X Column Check No 4 DCON6
500 Messages
68 KILOM1050 X Column Check No 0 DCON6
500 Messages
68 KILOM1050 X Column Check No 2 DCON6
500 Messages
68 KILOM1050 X Column Check No 4 DCON6
500 Messages
69 KILOM1050 X Column Check No 0 DCON6
500 Messages
69 KILOM1050 X Column Check No 2 DCON5
500 Messages
69 KILOM1050 X Column Check No 4 DCON3
500 Messages
70 KILOM1050 X Column Check No 0 DCON5
500 Messages
70 KILOM1050 X Column Check No 3.00001 DCON3
500 Messages
70 KILOM1050 X Column Check No 3.00001 DCON3
500 Messages
70 KILOM1050 X Column Check No 4.2 DCON3
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 22

70 KILOM1050 X Column Check No 8.4 DCON3


500 Messages
71 KILOM1050 X Column Check No 0 DCON5
500 Messages
71 KILOM1050 X Column Check No 2 DCON5
500 Messages
71 KILOM1050 X Column Check No 4 DCON5
500 Messages
72 KILOM1050 X Column Check No 0 DCON5
500 Messages
72 KILOM1050 X Column Check No 2 DCON5
500 Messages
72 KILOM1050 X Column Check No 4 DCON5
500 Messages
73 KILOM1050 X Column Check No 0 DCON5
500 Messages
73 KILOM1050 X Column Check No 2 DCON6
500 Messages
73 KILOM1050 X Column Check No 4 DCON3
500 Messages
75 KILOM1050 X Column Check No 0 DCON17
500 Messages
75 KILOM1050 X Column Check No 2 DCON17
500 Messages
75 KILOM1050 X Column Check No 4 DCON5
500 Messages
76 KILOM1050 X Column Check No 0 DCON17
500 Messages
76 KILOM1050 X Column Check No 2 DCON5
500 Messages
76 KILOM1050 X Column Check No 4 DCON5
500 Messages
77 KILOM1050 X Column Check No 0 DCON5
500 Messages
77 KILOM1050 X Column Check No 2 DCON6
500 Messages
77 KILOM1050 X Column Check No 4 DCON6
500 Messages
79 KILOM1050 X Column Check No 0 DCON18
500 Messages
79 KILOM1050 X Column Check No 2 DCON18
500 Messages
79 KILOM1050 X Column Check No 4 DCON18
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 23

500 Messages
80 KILOM1050 X Column Check No 0 DCON18
500 Messages
80 KILOM1050 X Column Check No 2 DCON6
500 Messages
80 KILOM1050 X Column Check No 4 DCON5
500 Messages
81 KILOM1050 X Column Check No 0 DCON5
500 Messages
81 KILOM1050 X Column Check No 2 DCON5
500 Messages
81 KILOM1050 X Column Check No 4 DCON3
500 Messages
82 KILOM1050 X Column Check No 0 DCON5
500 Messages
82 KILOM1050 X Column Check No 3 DCON3
500 Messages
82 KILOM1050 X Column Check No 3 DCON3
500 Messages
82 KILOM1050 X Column Check No 4.2 DCON3
500 Messages
82 KILOM1050 X Column Check No 8.4 DCON3
500 Messages
83 KILOM1050 X Column Check No 0 DCON17
500 Messages
83 KILOM1050 X Column Check No 2 DCON17
500 Messages
83 KILOM1050 X Column Check No 4 DCON5
500 Messages
84 KILOM1050 X Column Check No 0 DCON5
500 Messages
84 KILOM1050 X Column Check No 2 DCON5
500 Messages
84 KILOM1050 X Column Check No 4 DCON6
500 Messages
85 KILOM1050 X Column Check No 0 DCON6
500 Messages
85 KILOM1050 X Column Check No 2 DCON6
500 Messages
85 KILOM1050 X Column Check No 4 DCON3
500 Messages
87 KILOM1050 X Column Check No 0 DCON18
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 24

87 KILOM1050 X Column Check No 2 DCON18


500 Messages
87 KILOM1050 X Column Check No 4 DCON6
500 Messages
88 KILOM1050 X Column Check No 0 DCON18
500 Messages
88 KILOM1050 X Column Check No 2 DCON6
500 Messages
88 KILOM1050 X Column Check No 4 DCON6
500 Messages
89 KILOM1050 X Column Check No 0 DCON6
500 Messages
89 KILOM1050 X Column Check No 2 DCON5
500 Messages
89 KILOM1050 X Column Check No 4 DCON3
500 Messages
90 KILOM1050 X Column Check No 0 DCON5
500 Messages
90 KILOM1050 X Column Check No 3 DCON3
500 Messages
90 KILOM1050 X Column Check No 3 DCON3
500 Messages
90 KILOM1050 X Column Check No 4.2 DCON3
500 Messages
90 KILOM1050 X Column Check No 8.4 DCON3
500 Messages
91 KILOM1050 X Column Check No 0 DCON5
500 Messages
91 KILOM1050 X Column Check No 2 DCON5
500 Messages
91 KILOM1050 X Column Check No 4 DCON5
500 Messages
92 KILOM1050 X Column Check No 0 DCON5
500 Messages
92 KILOM1050 X Column Check No 2 DCON5
500 Messages
92 KILOM1050 X Column Check No 4 DCON5
500 Messages
93 KILOM1050 X Column Check No 0 DCON5
500 Messages
93 KILOM1050 X Column Check No 2 DCON6
500 Messages
93 KILOM1050 X Column Check No 4 DCON4
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 25

500 Messages
95 KILOM1050 X Column Check No 0 DCON6
500 Messages
95 KILOM1050 X Column Check No 2 DCON6
500 Messages
95 KILOM1050 X Column Check No 4 DCON6
500 Messages
97 KILOM1050 X Column Check No 0 DCON6
500 Messages
97 KILOM1050 X Column Check No 2 DCON5
500 Messages
97 KILOM1050 X Column Check No 4 DCON3
500 Messages
98 KILOM1050 X Column Check No 0 DCON3
500 Messages
98 KILOM1050 X Column Check No 3 DCON3
500 Messages
98 KILOM1050 X Column Check No 3 DCON3
500 Messages
98 KILOM1050 X Column Check No 4.2 DCON3
500 Messages
98 KILOM1050 X Column Check No 8.4 DCON3
500 Messages
582 KILOM1050 X Column Check No 0 DCON5
500 Messages
582 KILOM1050 X Column Check No 0.88 DCON5
500 Messages
582 KILOM1050 X Column Check No 1.76 DCON6
500 Messages
583 KILOM1050 X Column Check No 0 DCON6
500 Messages
583 KILOM1050 X Column Check No 0.88 DCON6
500 Messages
583 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
584 KILOM1050 X Column Check No 0 DCON5
500 Messages
584 KILOM1050 X Column Check No 0.88 DCON6
500 Messages
584 KILOM1050 X Column Check No 1.76 DCON6
500 Messages
585 KILOM1050 X Column Check No 0 DCON17
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 26

585 KILOM1050 X Column Check No 0.88 DCON5


500 Messages
585 KILOM1050 X Column Check No 1.76 DCON5
500 Messages
586 KILOM1050 X Column Check No 0 DCON17
500 Messages
586 KILOM1050 X Column Check No 0.88 DCON5
500 Messages
586 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
587 KILOM1050 X Column Check No 0 DCON17
500 Messages
587 KILOM1050 X Column Check No 0.88 DCON3
500 Messages
587 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
588 KILOM1050 X Column Check No 0 DCON17
500 Messages
588 KILOM1050 X Column Check No 0.88 DCON3
500 Messages
588 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
589 KILOM1050 X Column Check No 0 DCON18
500 Messages
589 KILOM1050 X Column Check No 0.88 DCON6
500 Messages
589 KILOM1050 X Column Check No 1.76 DCON6
500 Messages
590 KILOM1050 X Column Check No 0 DCON18
500 Messages
590 KILOM1050 X Column Check No 0.88 DCON6
500 Messages
590 KILOM1050 X Column Check No 1.76 DCON6
500 Messages
591 KILOM1050 X Column Check No 0 DCON18
500 Messages
591 KILOM1050 X Column Check No 0.88 DCON3
500 Messages
591 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
592 KILOM1050 X Column Check No 0 DCON18
500 Messages
592 KILOM1050 X Column Check No 0.88 DCON3
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 27

500 Messages
592 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
593 KILOM1050 X Column Check No 0 DCON4
500 Messages
593 KILOM1050 X Column Check No 0.88 DCON5
500 Messages
593 KILOM1050 X Column Check No 1.76 DCON5
500 Messages
541 KILOM1050 X Column Check No 0 DCON6
500 Messages
541 KILOM1050 X Column Check No 2 DCON6
500 Messages
541 KILOM1050 X Column Check No 4 DCON6
500 Messages
542 KILOM1050 X Column Check No 0 DCON1
500 Messages
542 KILOM1050 X Column Check No 1.5 DCON1
500 Messages
542 KILOM1050 X Column Check No 3 DCON3
500 Messages
543 KILOM1050 X Column Check No 0 DCON1
500 Messages
543 KILOM1050 X Column Check No 2.7 DCON6
500 Messages
543 KILOM1050 X Column Check No 5.4 DCON6
500 Messages
544 KILOM1050 X Column Check No 0 DCON6
500 Messages
544 KILOM1050 X Column Check No 2 DCON6
500 Messages
544 KILOM1050 X Column Check No 4 DCON1
500 Messages
545 KILOM1050 X Column Check No 0 DCON6
500 Messages
545 KILOM1050 X Column Check No 2 DCON1
500 Messages
545 KILOM1050 X Column Check No 4 DCON1
500 Messages
546 KILOM1050 X Column Check No 0 DCON1
500 Messages
546 KILOM1050 X Column Check No 2 DCON1
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 28

546 KILOM1050 X Column Check No 4 DCON4


500 Messages
547 KILOM1050 X Column Check No 0 DCON1
500 Messages
547 KILOM1050 X Column Check No 1.5 DCON1
500 Messages
547 KILOM1050 X Column Check No 3 DCON4
500 Messages
550 KILOM1050 X Column Check No 0 DCON5
500 Messages
550 KILOM1050 X Column Check No 2 DCON5
500 Messages
550 KILOM1050 X Column Check No 4 DCON1
500 Messages
551 KILOM1050 X Column Check No 0 DCON5
500 Messages
551 KILOM1050 X Column Check No 2 DCON1
500 Messages
551 KILOM1050 X Column Check No 4 DCON1
500 Messages
552 KILOM1050 X Column Check No 0 DCON1
500 Messages
552 KILOM1050 X Column Check No 2 DCON1
500 Messages
552 KILOM1050 X Column Check No 4 DCON1
500 Messages
553 KILOM1050 X Column Check No 0 DCON1
500 Messages
553 KILOM1050 X Column Check No 1.5 DCON1
500 Messages
553 KILOM1050 X Column Check No 3 DCON1
500 Messages
554 KILOM1050 X Column Check No 0 DCON1
500 Messages
554 KILOM1050 X Column Check No 2.7 DCON1
500 Messages
554 KILOM1050 X Column Check No 5.4 DCON5
500 Messages
558 KOLOM 400 X Column Check No 0 DCON6
400 Messages
558 KOLOM 400 X Column Check No 1.49999 DCON1
400 Messages
558 KOLOM 400 X Column Check No 2.99998 DCON6
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 29

400 Messages
559 KOLOM 400 X Column Check No 0 DCON5
400 Messages
559 KOLOM 400 X Column Check No 2.70001 DCON5
400 Messages
559 KOLOM 400 X Column Check No 5.40002 DCON17
400 Messages
561 KOLOM 400 X Column Check No 0 DCON5
400 Messages
561 KOLOM 400 X Column Check No 1.5 DCON1
400 Messages
561 KOLOM 400 X Column Check No 3 DCON5
400 Messages
562 KOLOM 400 X Column Check No 0 DCON6
400 Messages
562 KOLOM 400 X Column Check No 2.7 DCON6
400 Messages
562 KOLOM 400 X Column Check No 5.4 DCON18
400 Messages
564 KILOM1050 X Column Check No 0 DCON6
500 Messages
564 KILOM1050 X Column Check No 1.60086 DCON6
500 Messages
564 KILOM1050 X Column Check No 3.20173 DCON6
500 Messages
565 KILOM1050 X Column Check No 0 DCON6
500 Messages
565 KILOM1050 X Column Check No 2.59914 DCON3
500 Messages
565 KILOM1050 X Column Check No 5.19828 DCON3
500 Messages
566 KILOM1050 X Column Check No 0 DCON18
500 Messages
566 KILOM1050 X Column Check No 1.5775 DCON6
500 Messages
566 KILOM1050 X Column Check No 3.15499 DCON6
500 Messages
567 KILOM1050 X Column Check No 0 DCON6
500 Messages
567 KILOM1050 X Column Check No 2.62251 DCON3
500 Messages
567 KILOM1050 X Column Check No 5.24501 DCON3
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 30

572 KILOM1050 X Column Check No 0 DCON3


500 Messages
572 KILOM1050 X Column Check No 1.5 DCON3
500 Messages
572 KILOM1050 X Column Check No 3 DCON3
500 Messages
573 KILOM1050 X Column Check No 0 DCON3
500 Messages
573 KILOM1050 X Column Check No 2.7 DCON3
500 Messages
573 KILOM1050 X Column Check No 5.4 DCON3
500 Messages
574 KILOM1050 X Column Check No 0 DCON5
500 Messages
574 KILOM1050 X Column Check No 2 DCON5
500 Messages
574 KILOM1050 X Column Check No 4 DCON1
500 Messages
575 KILOM1050 X Column Check No 0 DCON5
500 Messages
575 KILOM1050 X Column Check No 2 DCON1
500 Messages
575 KILOM1050 X Column Check No 4 DCON1
500 Messages
576 KILOM1050 X Column Check No 0 DCON1
500 Messages
576 KILOM1050 X Column Check No 2 DCON1
500 Messages
576 KILOM1050 X Column Check No 4 DCON4
500 Messages
578 KILOM1050 X Column Check No 0 DCON1
500 Messages
578 KILOM1050 X Column Check No 1.5 DCON1
500 Messages
578 KILOM1050 X Column Check No 3 DCON4
500 Messages
579 KILOM1050 X Column Check No 0 DCON1
500 Messages
579 KILOM1050 X Column Check No 2.7 DCON1
500 Messages
579 KILOM1050 X Column Check No 5.4 DCON4
500 Messages
580 KILOM1050 X Column Check No 0 DCON1
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 31

500 Messages
580 KILOM1050 X Column Check No 2.7 DCON1
500 Messages
580 KILOM1050 X Column Check No 5.4 DCON6
500 Messages
581 KOLOM 400 X Column Check No 0 DCON15
400 Messages
581 KOLOM 400 X Column Check No 2 DCON3
400 Messages
581 KOLOM 400 X Column Check No 4 DCON3
400 Messages
594 KOLOM 400 X Column Check No 0 DCON3
400 Messages
594 KOLOM 400 X Column Check No 2 DCON1
400 Messages
594 KOLOM 400 X Column Check No 4 DCON6
400 Messages
598 KOLOM 400 X Column Check No 0 DCON5
400 Messages
598 KOLOM 400 X Column Check No 2 DCON1
400 Messages
598 KOLOM 400 X Column Check No 4 DCON5
400 Messages
600 KOLOM 400 X Column Check No 0 DCON5
400 Messages
600 KOLOM 400 X Column Check No 1.5 DCON1
400 Messages
600 KOLOM 400 X Column Check No 3 DCON5
400 Messages
601 KOLOM 400 X Column Check No 0 DCON5
400 Messages
601 KOLOM 400 X Column Check No 2.7 DCON6
400 Messages
601 KOLOM 400 X Column Check No 5.4 DCON17
400 Messages
603 KOLOM 400 X Column Check No 0 DCON15
400 Messages
603 KOLOM 400 X Column Check No 2 DCON3
400 Messages
603 KOLOM 400 X Column Check No 4 DCON3
400 Messages
605 KOLOM 400 X Column Check No 0 DCON3
400 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 32

605 KOLOM 400 X Column Check No 2 DCON1


400 Messages
605 KOLOM 400 X Column Check No 4 DCON5
400 Messages
606 KOLOM 400 X Column Check No 0 DCON5
400 Messages
606 KOLOM 400 X Column Check No 2 DCON1
400 Messages
606 KOLOM 400 X Column Check No 4 DCON6
400 Messages
607 KOLOM 400 X Column Check No 0 DCON6
400 Messages
607 KOLOM 400 X Column Check No 1.49999 DCON1
400 Messages
607 KOLOM 400 X Column Check No 2.99998 DCON6
400 Messages
608 KOLOM 400 X Column Check No 0 DCON5
400 Messages
608 KOLOM 400 X Column Check No 2.70001 DCON5
400 Messages
608 KOLOM 400 X Column Check No 5.40002 DCON18
400 Messages
14 KILOM1050 X Column Check No 0 DCON16
500 Messages
14 KILOM1050 X Column Check No 2.7 DCON3
500 Messages
14 KILOM1050 X Column Check No 5.4 DCON4
500 Messages
15 KILOM1050 X Column Check No 0 DCON4
500 Messages
15 KILOM1050 X Column Check No 1.5 DCON3
500 Messages
15 KILOM1050 X Column Check No 3 DCON6
500 Messages

DesignSec DesignType Status Location FTopComb FTopAre FBotCombo


t o a
Text Text Text m Text m2 Text
BALOK Beam No 0 DCON10 0.00018 DCON10
250 X 450 Messages 5 (Sp)
BALOK Beam No 0.5 DCON10 0.00012 DCON10
250 X 450 Messages 7 (Sp)
BALOK Beam No 1 DCON10 0.00007 DCON17
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 33

250 X 450 Messages 7


BALOK Beam No 1.5 DCON10 0.00004 DCON9
250 X 450 Messages (Sp) 6
BALOK Beam No 2 DCON10 0.00004 DCON9
250 X 450 Messages (Sp) 6
BALOK Beam No 2.5 DCON10 0.00004 DCON9
250 X 450 Messages (Sp) 6
BALOK Beam No 3 DCON10 0.00004 DCON1
250 X 450 Messages (Sp) 6
BALOK Beam No 3.5 DCON10 0.00004 DCON10
250 X 450 Messages (Sp) 6
BALOK Beam No 4 DCON10 0.00004 DCON10
250 X 450 Messages (Sp) 6
BALOK Beam No 4.5 DCON10 0.00004 DCON10
250 X 450 Messages (Sp) 6
BALOK Beam No 5 DCON9 0.00007 DCON18
250 X 450 Messages 7
BALOK Beam No 5.5 DCON9 0.00012 DCON10
250 X 450 Messages 7 (Sp)
BALOK Beam No 6 DCON9 0.00018 DCON9 (Sp)
250 X 450 Messages 5
BALOK Beam No 0 DCON10 0.00019 DCON10
250 X 450 Messages 2 (Sp)
BALOK Beam No 0.5 DCON10 0.00013 DCON9 (Sp)
250 X 450 Messages 2
BALOK Beam No 1 DCON10 0.00008 DCON17
250 X 450 Messages
BALOK Beam No 1.5 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages
BALOK Beam No 2 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages
BALOK Beam No 2.5 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages
BALOK Beam No 3 DCON9 (Sp) 0.00005 DCON1
250 X 450 Messages
BALOK Beam No 3.5 DCON9 (Sp) 0.00005 DCON10
250 X 450 Messages
BALOK Beam No 4 DCON9 (Sp) 0.00005 DCON10
250 X 450 Messages
BALOK Beam No 4.5 DCON9 (Sp) 0.00005 DCON10
250 X 450 Messages
BALOK Beam No 5 DCON9 0.00009 DCON18
250 X 450 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 34

BALOK Beam No 5.5 DCON9 0.00014 DCON18


250 X 450 Messages 2
BALOK Beam No 6 DCON9 0.00020 DCON9 (Sp)
250 X 450 Messages 2
BALOK Beam No 0 DCON9 0.00019 DCON9 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.5 DCON9 0.00013 DCON10
250 X 450 Messages 2 (Sp)
BALOK Beam No 1 DCON9 0.00008 DCON18
250 X 450 Messages
BALOK Beam No 1.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp)
BALOK Beam No 2 DCON10 0.00005 DCON10
250 X 450 Messages (Sp)
BALOK Beam No 2.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp)
BALOK Beam No 3 DCON10 0.00005 DCON1
250 X 450 Messages (Sp)
BALOK Beam No 3.5 DCON10 0.00005 DCON9
250 X 450 Messages (Sp)
BALOK Beam No 4 DCON10 0.00005 DCON9
250 X 450 Messages (Sp)
BALOK Beam No 4.5 DCON10 0.00005 DCON9
250 X 450 Messages (Sp)
BALOK Beam No 5 DCON10 0.00008 DCON17
250 X 450 Messages 9
BALOK Beam No 5.5 DCON10 0.00014 DCON17
250 X 450 Messages 1
BALOK Beam No 6 DCON10 0.00020 DCON10
250 X 450 Messages 2 (Sp)
BALOK Beam No 0 DCON8 0.00020 DCON8 (Sp)
250 X 450 Messages 6
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 4
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 1
BALOK Beam No 1.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON1
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 35

250 X 450 Messages 1


BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 1
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 4
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 5
BALOK Beam No 0 DCON8 0.00020 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 4
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 1
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 4
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 5
BALOK Beam No 0 DCON8 0.00020 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 4
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 36

BALOK Beam No 1 DCON8 0.00009 DCON15


250 X 450 Messages
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 1
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 1
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 4
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 5
BALOK Beam No 0 DCON8 0.00021 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 7
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 3
BALOK Beam No 1.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON1
250 X 450 Messages 2
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 5 DCON7 0.00009 DCON16
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 37

250 X 450 Messages 1


BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 5
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 0 DCON8 0.00020 DCON8 (Sp)
250 X 450 Messages 7
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 5
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 2
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 2
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 3
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 7
BALOK Beam No 6 DCON7 0.00021 DCON7 (Sp)
250 X 450 Messages
BALOK Beam No 0 DCON8 0.00020 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 4
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages
BALOK Beam No 1.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 1
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 38

BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON1


250 X 450 Messages 1
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 3
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON8 0.00020 DCON8 (Sp)
250 X 450 Messages 4
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 3
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 1
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 1
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 4
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 6
BALOK Beam No 0 DCON8 0.00020 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON8 0.00014 DCON15
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 39

250 X 450 Messages 3


BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 1
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 1
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 3
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 5
BALOK Beam No 0 DCON8 0.00021 DCON8 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 8
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 3
BALOK Beam No 1.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON1
250 X 450 Messages 2
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 2
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 40

BALOK Beam No 5 DCON7 0.00009 DCON16


250 X 450 Messages
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 3
BALOK Beam No 6 DCON7 0.00020 DCON7 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON9 0.00021 DCON9 (Sp)
250 X 450 Messages 6
BALOK Beam No 0.5 DCON9 0.00015 DCON18
250 X 450 Messages 3
BALOK Beam No 1 DCON9 0.00009 DCON18
250 X 450 Messages 9
BALOK Beam No 1.5 DCON17 0.00005 DCON10
250 X 450 Messages 5
BALOK Beam No 2 DCON9 (Sp) 0.00005 DCON10
250 X 450 Messages 3
BALOK Beam No 2.5 DCON9 (Sp) 0.00005 DCON10
250 X 450 Messages 3
BALOK Beam No 3 DCON9 (Sp) 0.00005 DCON9 (Sp)
250 X 450 Messages 3
BALOK Beam No 3.5 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 3
BALOK Beam No 4 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 3
BALOK Beam No 4.5 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 3
BALOK Beam No 5 DCON10 0.00008 DCON17
250 X 450 Messages 9
BALOK Beam No 5.5 DCON10 0.00014 DCON17
250 X 450 Messages 4
BALOK Beam No 6 DCON10 0.00020 DCON10
250 X 450 Messages 6 (Sp)
BALOK Beam No 0 DCON9 0.00019 DCON9 (Sp)
250 X 450 Messages 8
BALOK Beam No 0.5 DCON9 0.00013 DCON18
250 X 450 Messages 8
BALOK Beam No 1 DCON9 0.00008 DCON18
250 X 450 Messages 6
BALOK Beam No 1.5 DCON10 0.00004 DCON10
250 X 450 Messages (Sp) 9
BALOK Beam No 2 DCON10 0.00004 DCON10
250 X 450 Messages (Sp) 9
BALOK Beam No 2.5 DCON10 0.00004 DCON10
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 41

250 X 450 Messages (Sp) 9


BALOK Beam No 3 DCON10 0.00004 DCON1
250 X 450 Messages (Sp) 9
BALOK Beam No 3.5 DCON10 0.00004 DCON9
250 X 450 Messages (Sp) 9
BALOK Beam No 4 DCON10 0.00004 DCON9
250 X 450 Messages (Sp) 9
BALOK Beam No 4.5 DCON10 0.00004 DCON9
250 X 450 Messages (Sp) 9
BALOK Beam No 5 DCON10 0.00008 DCON17
250 X 450 Messages 6
BALOK Beam No 5.5 DCON10 0.00013 DCON17
250 X 450 Messages 8
BALOK Beam No 6 DCON10 0.00019 DCON10
250 X 450 Messages 8 (Sp)
BALOK Beam No 0 DCON9 0.00020 DCON9 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON9 0.00014 DCON18
250 X 450 Messages 3
BALOK Beam No 1 DCON9 0.00008 DCON18
250 X 450 Messages 9
BALOK Beam No 1.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 4
BALOK Beam No 2 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 4
BALOK Beam No 2.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 4
BALOK Beam No 3 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 4 (Sp)
BALOK Beam No 3.5 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 4
BALOK Beam No 4 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 4
BALOK Beam No 4.5 DCON18 0.00005 DCON9
250 X 450 Messages 5
BALOK Beam No 5 DCON10 0.00009 DCON17
250 X 450 Messages 9
BALOK Beam No 5.5 DCON10 0.00015 DCON17
250 X 450 Messages 3
BALOK Beam No 6 DCON10 0.00021 DCON10
250 X 450 Messages 6 (Sp)
BALOK Beam No 0 DCON9 0.00024 DCON9 (Sp)
250 X 450 Messages 9
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 42

BALOK Beam No 0.5 DCON9 0.00018 DCON18


250 X 450 Messages 1
BALOK Beam No 1 DCON9 0.00012 DCON18
250 X 450 Messages 1
BALOK Beam No 1.5 DCON17 0.00007 DCON10
250 X 450 Messages 2
BALOK Beam No 2 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 2
BALOK Beam No 2.5 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 2
BALOK Beam No 3 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 2
BALOK Beam No 3.5 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 2
BALOK Beam No 4 DCON9 (Sp) 0.00006 DCON9
250 X 450 Messages 2
BALOK Beam No 4.5 DCON9 (Sp) 0.00006 DCON9
250 X 450 Messages 2
BALOK Beam No 5 DCON10 0.00010 DCON17
250 X 450 Messages 6
BALOK Beam No 5.5 DCON10 0.00016 DCON17
250 X 450 Messages 5
BALOK Beam No 6 DCON10 0.00023 DCON10
250 X 450 Messages 2 (Sp)
BALOK Beam No 0 DCON9 0.00022 DCON9 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON9 0.00016 DCON18
250 X 450 Messages
BALOK Beam No 1 DCON9 0.00010 DCON18
250 X 450 Messages 3
BALOK Beam No 1.5 DCON17 0.00005 DCON10
250 X 450 Messages 8
BALOK Beam No 2 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 6
BALOK Beam No 2.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 6
BALOK Beam No 3 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 6 (Sp)
BALOK Beam No 3.5 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 6
BALOK Beam No 4 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 6
BALOK Beam No 4.5 DCON18 0.00005 DCON9
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 43

250 X 450 Messages 8


BALOK Beam No 5 DCON10 0.00010 DCON17
250 X 450 Messages 4
BALOK Beam No 5.5 DCON10 0.00016 DCON17
250 X 450 Messages
BALOK Beam No 6 DCON10 0.00022 DCON10
250 X 450 Messages 5 (Sp)
BALOK Beam No 0 DCON9 0.00023 DCON9 (Sp)
250 X 450 Messages 2
BALOK Beam No 0.5 DCON9 0.00016 DCON18
250 X 450 Messages 5
BALOK Beam No 1 DCON9 0.00010 DCON18
250 X 450 Messages 6
BALOK Beam No 1.5 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 2
BALOK Beam No 2 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 2
BALOK Beam No 2.5 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 2 (Sp)
BALOK Beam No 3 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 2 (Sp)
BALOK Beam No 3.5 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 2
BALOK Beam No 4 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 2
BALOK Beam No 4.5 DCON18 0.00007 DCON9
250 X 450 Messages 2
BALOK Beam No 5 DCON10 0.00012 DCON17
250 X 450 Messages 1
BALOK Beam No 5.5 DCON10 0.00018 DCON17
250 X 450 Messages 1
BALOK Beam No 6 DCON10 0.00024 DCON10
250 X 450 Messages 9 (Sp)
BALOK Beam No 0 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 2
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 6
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 8
BALOK Beam No 1.5 DCON16 0.00006 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 8
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 44

BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7


250 X 450 Messages 8
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 8
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4.5 DCON15 0.00006 DCON8
250 X 450 Messages
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 8
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 6
BALOK Beam No 6 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 0 DCON8 0.00022 DCON8 (Sp)
250 X 450 Messages 9
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 3
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 6
BALOK Beam No 1.5 DCON16 0.00005 DCON7
250 X 450 Messages 9
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 4.5 DCON15 0.00005 DCON8
250 X 450 Messages 9
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 6
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 3
BALOK Beam No 6 DCON7 0.00022 DCON7 (Sp)
250 X 450 Messages 9
BALOK Beam No 0 DCON8 0.00022 DCON8 (Sp)
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 45

250 X 450 Messages 8


BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 3
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 6
BALOK Beam No 1.5 DCON16 0.00005 DCON7
250 X 450 Messages 9
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 4.5 DCON15 0.00005 DCON8
250 X 450 Messages 9
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 6
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 3
BALOK Beam No 6 DCON7 0.00022 DCON7 (Sp)
250 X 450 Messages 9
BALOK Beam No 0 DCON8 0.00022 DCON8 (Sp)
250 X 450 Messages 9
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 3
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 6
BALOK Beam No 1.5 DCON16 0.00005 DCON7
250 X 450 Messages 9
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 46

BALOK Beam No 4.5 DCON15 0.00005 DCON8


250 X 450 Messages 9
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 6
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 3
BALOK Beam No 6 DCON7 0.00022 DCON7 (Sp)
250 X 450 Messages 9
BALOK Beam No 0 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 4
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 7
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 8
BALOK Beam No 1.5 DCON16 0.00006 DCON7
250 X 450 Messages
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON8 (Sp)
250 X 450 Messages 8
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4.5 DCON15 0.00006 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 8
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 5
BALOK Beam No 6 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0 DCON9 0.00026 DCON9 (Sp)
250 X 450 Messages 7
BALOK Beam No 0.5 DCON9 0.00019 DCON18
250 X 450 Messages 6
BALOK Beam No 1 DCON9 0.00013 DCON18
250 X 450 Messages 3
BALOK Beam No 1.5 DCON17 0.00008 DCON10
250 X 450 Messages 1
BALOK Beam No 2 DCON9 (Sp) 0.00006 DCON10
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 47

250 X 450 Messages 6


BALOK Beam No 2.5 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 6
BALOK Beam No 3 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 6
BALOK Beam No 3.5 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 6
BALOK Beam No 4 DCON9 (Sp) 0.00006 DCON9
250 X 450 Messages 6
BALOK Beam No 4.5 DCON18 0.00006 DCON9
250 X 450 Messages 8
BALOK Beam No 5 DCON10 0.00011 DCON17
250 X 450 Messages 9
BALOK Beam No 5.5 DCON10 0.00018 DCON17
250 X 450 Messages 2
BALOK Beam No 6 DCON10 0.00025 DCON10
250 X 450 Messages 3 (Sp)
BALOK Beam No 0 DCON10 0.00026 DCON10
250 X 450 Messages 8 (Sp)
BALOK Beam No 0.5 DCON10 0.00019 DCON17
250 X 450 Messages 7
BALOK Beam No 1 DCON10 0.00013 DCON17
250 X 450 Messages 4
BALOK Beam No 1.5 DCON18 0.00008 DCON9
250 X 450 Messages 2
BALOK Beam No 2 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 6
BALOK Beam No 2.5 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 6
BALOK Beam No 3 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 6 (Sp)
BALOK Beam No 3.5 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 6 (Sp)
BALOK Beam No 4 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 6
BALOK Beam No 4.5 DCON17 0.00006 DCON10
250 X 450 Messages 7
BALOK Beam No 5 DCON9 0.00011 DCON18
250 X 450 Messages 9
BALOK Beam No 5.5 DCON9 0.00018 DCON18
250 X 450 Messages 1
BALOK Beam No 6 DCON9 0.00025 DCON9 (Sp)
250 X 450 Messages 2
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 48

BALOK Beam No 0 DCON10 0.00024 DCON10


250 X 450 Messages 2 (Sp)
BALOK Beam No 0.5 DCON10 0.00017 DCON17
250 X 450 Messages 4
BALOK Beam No 1 DCON10 0.00011 DCON17
250 X 450 Messages 5
BALOK Beam No 1.5 DCON18 0.00006 DCON9
250 X 450 Messages 6
BALOK Beam No 2 DCON10 0.00006 DCON9
250 X 450 Messages (Sp)
BALOK Beam No 2.5 DCON10 0.00006 DCON9
250 X 450 Messages (Sp)
BALOK Beam No 3 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) (Sp)
BALOK Beam No 3.5 DCON10 0.00006 DCON10
250 X 450 Messages (Sp)
BALOK Beam No 4 DCON10 0.00006 DCON10
250 X 450 Messages (Sp)
BALOK Beam No 4.5 DCON17 0.00006 DCON10
250 X 450 Messages 6
BALOK Beam No 5 DCON9 0.00011 DCON18
250 X 450 Messages 5
BALOK Beam No 5.5 DCON9 0.00017 DCON18
250 X 450 Messages 4
BALOK Beam No 6 DCON9 0.00024 DCON9 (Sp)
250 X 450 Messages 2
BALOK Beam No 0 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 9
BALOK Beam No 0.5 DCON8 0.00017 DCON15
250 X 450 Messages 2
BALOK Beam No 1 DCON8 0.00011 DCON15
250 X 450 Messages 3
BALOK Beam No 1.5 DCON16 0.00006 DCON7
250 X 450 Messages 5
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 9
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 9
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON8 (Sp)
250 X 450 Messages 9
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 9
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 49

250 X 450 Messages 9


BALOK Beam No 4.5 DCON15 0.00006 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 9
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 7
BALOK Beam No 6 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 8
BALOK Beam No 1 DCON8 0.00011 DCON15
250 X 450 Messages
BALOK Beam No 1.5 DCON16 0.00006 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON8 (Sp)
250 X 450 Messages 8
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4.5 DCON15 0.00006 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 7
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 5
BALOK Beam No 6 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 4
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 7
BALOK Beam No 1.5 DCON16 0.00006 DCON7
250 X 450 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 50

BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7


250 X 450 Messages 8
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 8
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4.5 DCON15 0.00006 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 8
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 7
BALOK Beam No 6 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 0 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 5
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 7
BALOK Beam No 1.5 DCON16 0.00006 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 4.5 DCON15 0.00006 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 8
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 6
BALOK Beam No 6 DCON7 0.00023 DCON7 (Sp)
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 51

250 X 450 Messages 2


BALOK Beam No 0 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON8 0.00016 DCON15
250 X 450 Messages 8
BALOK Beam No 1 DCON8 0.00010 DCON15
250 X 450 Messages 9
BALOK Beam No 1.5 DCON16 0.00006 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON8 (Sp)
250 X 450 Messages 8
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 4.5 DCON15 0.00006 DCON8
250 X 450 Messages 2
BALOK Beam No 5 DCON7 0.00010 DCON16
250 X 450 Messages 9
BALOK Beam No 5.5 DCON7 0.00016 DCON16
250 X 450 Messages 6
BALOK Beam No 6 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 0 DCON9 0.00025 DCON9 (Sp)
250 X 450 Messages 6
BALOK Beam No 0.5 DCON9 0.00018 DCON18
250 X 450 Messages 7
BALOK Beam No 1 DCON9 0.00012 DCON18
250 X 450 Messages 6
BALOK Beam No 1.5 DCON17 0.00007 DCON10
250 X 450 Messages 5
BALOK Beam No 2 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 3
BALOK Beam No 2.5 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 3
BALOK Beam No 3 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 3
BALOK Beam No 3.5 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 3
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 52

BALOK Beam No 4 DCON9 (Sp) 0.00006 DCON9


250 X 450 Messages 3
BALOK Beam No 4.5 DCON9 (Sp) 0.00006 DCON9
250 X 450 Messages 3
BALOK Beam No 5 DCON10 0.00011 DCON17
250 X 450 Messages 1
BALOK Beam No 5.5 DCON10 0.00017 DCON17
250 X 450 Messages 1
BALOK Beam No 6 DCON10 0.00023 DCON10
250 X 450 Messages 9 (Sp)
BALOK Beam No 0 DCON9 0.00023 DCON9 (Sp)
250 X 450 Messages 4
BALOK Beam No 0.5 DCON9 0.00016 DCON18
250 X 450 Messages 8
BALOK Beam No 1 DCON9 0.00010 DCON18
250 X 450 Messages 9
BALOK Beam No 1.5 DCON17 0.00006 DCON10
250 X 450 Messages 2
BALOK Beam No 2 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 8
BALOK Beam No 2.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 8
BALOK Beam No 3 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 8 (Sp)
BALOK Beam No 3.5 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 8
BALOK Beam No 4 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 8
BALOK Beam No 4.5 DCON18 0.00006 DCON9
250 X 450 Messages 2
BALOK Beam No 5 DCON10 0.00011 DCON17
250 X 450 Messages
BALOK Beam No 5.5 DCON10 0.00016 DCON17
250 X 450 Messages 8
BALOK Beam No 6 DCON10 0.00023 DCON10
250 X 450 Messages 4 (Sp)
BALOK Beam No 0 DCON9 0.00023 DCON9 (Sp)
250 X 450 Messages 9
BALOK Beam No 0.5 DCON9 0.00017 DCON18
250 X 450 Messages 1
BALOK Beam No 1 DCON9 0.00011 DCON18
250 X 450 Messages 1
BALOK Beam No 1.5 DCON10 0.00006 DCON10
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 53

250 X 450 Messages (Sp) 3


BALOK Beam No 2 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 3
BALOK Beam No 2.5 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 3 (Sp)
BALOK Beam No 3 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 3 (Sp)
BALOK Beam No 3.5 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 3
BALOK Beam No 4 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 3
BALOK Beam No 4.5 DCON18 0.00007 DCON9
250 X 450 Messages 5
BALOK Beam No 5 DCON10 0.00012 DCON17
250 X 450 Messages 6
BALOK Beam No 5.5 DCON10 0.00018 DCON17
250 X 450 Messages 7
BALOK Beam No 6 DCON10 0.00025 DCON10
250 X 450 Messages 6 (Sp)
BALOK Beam No 0 DCON8 0.00021 DCON8 (Sp)
250 X 450 Messages 2
BALOK Beam No 0.5 DCON8 0.00015 DCON15
250 X 450 Messages
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 5
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 3
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 3
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 3
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 3
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 3
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 3
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 3
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 5
BALOK Beam No 5.5 DCON7 0.00015 DCON16
250 X 450 Messages 1
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 54

BALOK Beam No 6 DCON7 0.00021 DCON7 (Sp)


250 X 450 Messages 4
BALOK Beam No 0 DCON8 0.00021 DCON8 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 8
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 4
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 2
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 4
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 9
BALOK Beam No 6 DCON7 0.00021 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0 DCON8 0.00021 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 8
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 4
BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 2
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 55

250 X 450 Messages 2


BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 4
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 8
BALOK Beam No 6 DCON7 0.00021 DCON7 (Sp)
250 X 450 Messages
BALOK Beam No 0 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages
BALOK Beam No 0.5 DCON7 0.00016 DCON16
250 X 450 Messages 5
BALOK Beam No 1 DCON7 0.00010 DCON16
250 X 450 Messages 8
BALOK Beam No 1.5 DCON15 0.00006 DCON8
250 X 450 Messages 1
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 4.5 DCON16 0.00005 DCON7
250 X 450 Messages 9
BALOK Beam No 5 DCON8 0.00010 DCON15
250 X 450 Messages 6
BALOK Beam No 5.5 DCON8 0.00016 DCON15
250 X 450 Messages 4
BALOK Beam No 6 DCON8 0.00022 DCON8 (Sp)
250 X 450 Messages 9
BALOK Beam No 0 DCON7 0.00022 DCON7 (Sp)
250 X 450 Messages 4
BALOK Beam No 0.5 DCON7 0.00015 DCON16
250 X 450 Messages 9
BALOK Beam No 1 DCON7 0.00010 DCON16
250 X 450 Messages 3
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 56

BALOK Beam No 1.5 DCON15 0.00005 DCON8


250 X 450 Messages 7
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 6
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 6
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON8 (Sp)
250 X 450 Messages 6
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 6
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 6
BALOK Beam No 4.5 DCON16 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 5 DCON8 0.00010 DCON15
250 X 450 Messages 4
BALOK Beam No 5.5 DCON8 0.00016 DCON15
250 X 450 Messages 1
BALOK Beam No 6 DCON8 0.00022 DCON8 (Sp)
250 X 450 Messages 6
BALOK Beam No 0 DCON7 0.00022 DCON7 (Sp)
250 X 450 Messages 2
BALOK Beam No 0.5 DCON7 0.00015 DCON16
250 X 450 Messages 8
BALOK Beam No 1 DCON7 0.00010 DCON16
250 X 450 Messages 2
BALOK Beam No 1.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 8
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON8 (Sp)
250 X 450 Messages 8
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 8
BALOK Beam No 4.5 DCON16 0.00006 DCON7
250 X 450 Messages 2
BALOK Beam No 5 DCON8 0.00011 DCON15
250 X 450 Messages
BALOK Beam No 5.5 DCON8 0.00016 DCON15
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 57

250 X 450 Messages 8


BALOK Beam No 6 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON7 0.00021 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 0.5 DCON7 0.00014 DCON16
250 X 450 Messages 9
BALOK Beam No 1 DCON7 0.00009 DCON16
250 X 450 Messages 4
BALOK Beam No 1.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON8 (Sp)
250 X 450 Messages 7
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 4.5 DCON16 0.00005 DCON7
250 X 450 Messages 9
BALOK Beam No 5 DCON8 0.00010 DCON15
250 X 450 Messages 7
BALOK Beam No 5.5 DCON8 0.00016 DCON15
250 X 450 Messages 5
BALOK Beam No 6 DCON8 0.00023 DCON8 (Sp)
250 X 450 Messages 1
BALOK Beam No 0 DCON7 0.00023 DCON7 (Sp)
250 X 450 Messages
BALOK Beam No 0.5 DCON7 0.00016 DCON16
250 X 450 Messages 4
BALOK Beam No 1 DCON7 0.00010 DCON16
250 X 450 Messages 6
BALOK Beam No 1.5 DCON15 0.00005 DCON8
250 X 450 Messages 9
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 7
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON7 (Sp)
250 X 450 Messages 7
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 58

BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON7


250 X 450 Messages 7
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 7
BALOK Beam No 4.5 DCON16 0.00006 DCON7
250 X 450 Messages
BALOK Beam No 5 DCON8 0.00010 DCON15
250 X 450 Messages 5
BALOK Beam No 5.5 DCON8 0.00016 DCON15
250 X 450 Messages 2
BALOK Beam No 6 DCON8 0.00022 DCON8 (Sp)
250 X 450 Messages 8
BALOK Beam No 0 DCON9 0.00027 DCON9 (Sp)
250 X 450 Messages 6
BALOK Beam No 0.5 DCON9 0.00020 DCON18
250 X 450 Messages 3
BALOK Beam No 1 DCON9 0.00013 DCON18
250 X 450 Messages 9
BALOK Beam No 1.5 DCON17 0.00008 DCON10
250 X 450 Messages 5
BALOK Beam No 2 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 8
BALOK Beam No 2.5 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 8
BALOK Beam No 3 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 8
BALOK Beam No 3.5 DCON9 (Sp) 0.00006 DCON9 (Sp)
250 X 450 Messages 8
BALOK Beam No 4 DCON9 (Sp) 0.00006 DCON9
250 X 450 Messages 8
BALOK Beam No 4.5 DCON18 0.00007 DCON9
250 X 450 Messages 1
BALOK Beam No 5 DCON10 0.00012 DCON17
250 X 450 Messages 3
BALOK Beam No 5.5 DCON10 0.00018 DCON17
250 X 450 Messages 7
BALOK Beam No 6 DCON10 0.00025 DCON10
250 X 450 Messages 8 (Sp)
BALOK Beam No 0 DCON8 0.00021 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 0.5 DCON8 0.00014 DCON15
250 X 450 Messages 8
BALOK Beam No 1 DCON8 0.00009 DCON15
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 59

250 X 450 Messages 4


BALOK Beam No 1.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 2.5 DCON7 (Sp) 0.00005 DCON7
250 X 450 Messages 2
BALOK Beam No 3 DCON7 (Sp) 0.00005 DCON1
250 X 450 Messages 2
BALOK Beam No 3.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 4.5 DCON7 (Sp) 0.00005 DCON8
250 X 450 Messages 2
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 4
BALOK Beam No 5.5 DCON7 0.00014 DCON16
250 X 450 Messages 8
BALOK Beam No 6 DCON7 0.00021 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0 DCON8 0.00021 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0.5 DCON8 0.00015 DCON15
250 X 450 Messages 1
BALOK Beam No 1 DCON8 0.00009 DCON15
250 X 450 Messages 6
BALOK Beam No 1.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 3
BALOK Beam No 2 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 3
BALOK Beam No 2.5 DCON8 (Sp) 0.00005 DCON7
250 X 450 Messages 3
BALOK Beam No 3 DCON8 (Sp) 0.00005 DCON1
250 X 450 Messages 3
BALOK Beam No 3.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 3
BALOK Beam No 4 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 3
BALOK Beam No 4.5 DCON8 (Sp) 0.00005 DCON8
250 X 450 Messages 3
BALOK Beam No 5 DCON7 0.00009 DCON16
250 X 450 Messages 4
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 60

BALOK Beam No 5.5 DCON7 0.00014 DCON16


250 X 450 Messages 9
BALOK Beam No 6 DCON7 0.00021 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0 DCON10 0.00027 DCON10
250 X 450 Messages 7 (Sp)
BALOK Beam No 0.5 DCON10 0.00020 DCON17
250 X 450 Messages 4
BALOK Beam No 1 DCON10 0.00013 DCON17
250 X 450 Messages 9
BALOK Beam No 1.5 DCON18 0.00008 DCON9
250 X 450 Messages 5
BALOK Beam No 2 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 8
BALOK Beam No 2.5 DCON10 0.00006 DCON9
250 X 450 Messages (Sp) 8
BALOK Beam No 3 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 8 (Sp)
BALOK Beam No 3.5 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 8 (Sp)
BALOK Beam No 4 DCON10 0.00006 DCON10
250 X 450 Messages (Sp) 8
BALOK Beam No 4.5 DCON17 0.00007 DCON10
250 X 450 Messages 1
BALOK Beam No 5 DCON9 0.00012 DCON18
250 X 450 Messages 2
BALOK Beam No 5.5 DCON9 0.00018 DCON18
250 X 450 Messages 5
BALOK Beam No 6 DCON9 0.00025 DCON9 (Sp)
250 X 450 Messages 7
BALOK Beam No 0 DCON10 0.00025 DCON10
250 X 450 Messages 2 (Sp)
BALOK Beam No 0.5 DCON10 0.00018 DCON17
250 X 450 Messages 3
BALOK Beam No 1 DCON10 0.00012 DCON17
250 X 450 Messages 1
BALOK Beam No 1.5 DCON18 0.00007 DCON9
250 X 450 Messages 1
BALOK Beam No 2 DCON9 (Sp) 0.00006 DCON9
250 X 450 Messages 2
BALOK Beam No 2.5 DCON9 (Sp) 0.00006 DCON9
250 X 450 Messages 2
BALOK Beam No 3 DCON9 (Sp) 0.00006 DCON9 (Sp)
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 61

250 X 450 Messages 2


BALOK Beam No 3.5 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 2
BALOK Beam No 4 DCON9 (Sp) 0.00006 DCON10
250 X 450 Messages 2
BALOK Beam No 4.5 DCON17 0.00007 DCON10
250 X 450 Messages 1
BALOK Beam No 5 DCON9 0.00012 DCON18
250 X 450 Messages 1
BALOK Beam No 5.5 DCON9 0.00018 DCON18
250 X 450 Messages 3
BALOK Beam No 6 DCON9 0.00025 DCON9 (Sp)
250 X 450 Messages 2
BALOK Beam No 0 DCON8 0.00015 DCON8 (Sp)
250 X 450 Messages 6
BALOK Beam No 0.5 DCON8 0.00010 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 1 DCON8 0.00005 DCON15
250 X 450 Messages 8
BALOK Beam No 1.5 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 2 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 2.5 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 3 DCON7 (Sp) 0.00004 DCON1
250 X 450 Messages 1
BALOK Beam No 3.5 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 1
BALOK Beam No 4 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 1
BALOK Beam No 4.5 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 1
BALOK Beam No 5 DCON7 0.00006 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 5.5 DCON7 0.00011 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 6 DCON7 0.00016 DCON7 (Sp)
250 X 450 Messages 6
BALOK Beam No 0 DCON8 0.00015 DCON8 (Sp)
250 X 450 Messages 4
BALOK Beam No 0.5 DCON8 0.00010 DCON7 (Sp)
250 X 450 Messages 2
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 62

BALOK Beam No 1 DCON8 0.00005 DCON7 (Sp)


250 X 450 Messages 7
BALOK Beam No 1.5 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 9
BALOK Beam No 2 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 9
BALOK Beam No 2.5 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 9
BALOK Beam No 3 DCON7 (Sp) 0.00003 DCON1
250 X 450 Messages 9
BALOK Beam No 3.5 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 9
BALOK Beam No 4 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 9
BALOK Beam No 4.5 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 9
BALOK Beam No 5 DCON7 0.00005 DCON7 (Sp)
250 X 450 Messages 8
BALOK Beam No 5.5 DCON7 0.00010 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 6 DCON7 0.00015 DCON7 (Sp)
250 X 450 Messages 5
BALOK Beam No 0 DCON8 0.00015 DCON8 (Sp)
250 X 450 Messages 3
BALOK Beam No 0.5 DCON8 0.00010 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 1 DCON8 0.00005 DCON7 (Sp)
250 X 450 Messages 6
BALOK Beam No 1.5 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 8
BALOK Beam No 2 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 8
BALOK Beam No 2.5 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 8
BALOK Beam No 3 DCON7 (Sp) 0.00003 DCON1
250 X 450 Messages 8
BALOK Beam No 3.5 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 8
BALOK Beam No 4 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 8
BALOK Beam No 4.5 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 8
BALOK Beam No 5 DCON7 0.00005 DCON7 (Sp)
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 63

250 X 450 Messages 6


BALOK Beam No 5.5 DCON7 0.00010 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 6 DCON7 0.00015 DCON7 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON8 0.00015 DCON8 (Sp)
250 X 450 Messages 4
BALOK Beam No 0.5 DCON8 0.00010 DCON7 (Sp)
250 X 450 Messages 2
BALOK Beam No 1 DCON8 0.00005 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 1.5 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 8
BALOK Beam No 2 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 8
BALOK Beam No 2.5 DCON7 (Sp) 0.00003 DCON7
250 X 450 Messages 8
BALOK Beam No 3 DCON7 (Sp) 0.00003 DCON1
250 X 450 Messages 8
BALOK Beam No 3.5 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 8
BALOK Beam No 4 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 8
BALOK Beam No 4.5 DCON7 (Sp) 0.00003 DCON8
250 X 450 Messages 8
BALOK Beam No 5 DCON7 0.00005 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 5.5 DCON7 0.00010 DCON7 (Sp)
250 X 450 Messages 2
BALOK Beam No 6 DCON7 0.00015 DCON7 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON8 0.00016 DCON8 (Sp)
250 X 450 Messages 7
BALOK Beam No 0.4995 DCON8 0.00011 DCON8 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.999 DCON8 0.00006 DCON8 (Sp)
250 X 450 Messages 3
BALOK Beam No 1.4985 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 1.998 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 2.4975 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 1
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 64

BALOK Beam No 2.997 DCON8 (Sp) 0.00004 DCON1


250 X 450 Messages 1
BALOK Beam No 3.4965 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 1
BALOK Beam No 3.996 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 1
BALOK Beam No 4.4955 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 1
BALOK Beam No 4.995 DCON7 0.00005 DCON16
250 X 450 Messages 6
BALOK Beam No 5.4945 DCON7 0.0001 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 5.994 DCON7 0.00015 DCON8 (Sp)
250 X 450 Messages 2
BALOK Beam See 5.994 DCON7 0.00015 DCON8 (Sp)
250 X 450 ErrMsg 2
BALOK Beam See 6 DCON7 0.00015 DCON7 (Sp)
250 X 450 ErrMsg 4
BALOK Beam No 0 DCON10 0.00018 DCON10
250 X 450 Messages 1 (Sp)
BALOK Beam No 0.5 DCON10 0.00012 DCON9 (Sp)
250 X 450 Messages 5
BALOK Beam No 1 DCON10 0.00007 DCON9 (Sp)
250 X 450 Messages 6
BALOK Beam No 1.5 DCON9 (Sp) 0.00004 DCON9
250 X 450 Messages 9
BALOK Beam No 2 DCON9 (Sp) 0.00004 DCON9
250 X 450 Messages 9
BALOK Beam No 2.5 DCON9 (Sp) 0.00004 DCON9
250 X 450 Messages 9
BALOK Beam No 3 DCON9 (Sp) 0.00004 DCON7
250 X 450 Messages 9
BALOK Beam No 3 DCON9 (Sp) 0.00004 DCON7
250 X 450 Messages 9
BALOK Beam No 3.5 DCON9 (Sp) 0.00004 DCON7
250 X 450 Messages 9
BALOK Beam No 4 DCON9 (Sp) 0.00004 DCON10
250 X 450 Messages 9
BALOK Beam No 4.5 DCON9 (Sp) 0.00004 DCON10
250 X 450 Messages 9
BALOK Beam No 5 DCON9 0.00008 DCON9 (Sp)
250 X 450 Messages
BALOK Beam No 5.5 DCON9 0.00013 DCON9 (Sp)
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 65

250 X 450 Messages 5


BALOK Beam No 6 DCON9 0.00019 DCON9 (Sp)
250 X 450 Messages 8
BALOK Beam See 0 DCON7 0.00018 DCON7 (Sp)
250 X 450 ErrMsg 2
BALOK Beam See 0.006 DCON7 0.00018 DCON7 (Sp)
250 X 450 ErrMsg 1
BALOK Beam No 0.006 DCON7 0.00018 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.5055 DCON7 0.00012 DCON7 (Sp)
250 X 450 Messages 5
BALOK Beam No 1.005 DCON7 0.00007 DCON7 (Sp)
250 X 450 Messages 6
BALOK Beam No 1.5045 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 5
BALOK Beam No 2.004 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 5
BALOK Beam No 2.5035 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 5
BALOK Beam No 3.003 DCON7 (Sp) 0.00004 DCON1
250 X 450 Messages 5
BALOK Beam No 3.5025 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 5
BALOK Beam No 4.002 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 5
BALOK Beam No 4.5015 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 5
BALOK Beam No 5.001 DCON8 0.00006 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 5.5005 DCON8 0.00011 DCON7 (Sp)
250 X 450 Messages 4
BALOK Beam No 6 DCON8 0.00016 DCON8 (Sp)
250 X 450 Messages 9
BALOK Beam No 0 DCON7 0.00016 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.5 DCON7 0.00010 DCON8 (Sp)
250 X 450 Messages 7
BALOK Beam No 1 DCON7 0.00006 DCON8 (Sp)
250 X 450 Messages 1
BALOK Beam No 1.5 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 1
BALOK Beam No 2 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 1
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 66

BALOK Beam No 2.5 DCON8 (Sp) 0.00004 DCON8


250 X 450 Messages 1
BALOK Beam No 3 DCON8 (Sp) 0.00004 DCON1
250 X 450 Messages 1
BALOK Beam No 3.5 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 4 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 4.5 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 1
BALOK Beam No 5 DCON8 0.00006 DCON8 (Sp)
250 X 450 Messages 4
BALOK Beam No 5.5 DCON8 0.00011 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 6 DCON8 0.00016 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 0 DCON7 0.00015 DCON7 (Sp)
250 X 450 Messages 7
BALOK Beam No 0.5 DCON7 0.00010 DCON8 (Sp)
250 X 450 Messages 5
BALOK Beam No 1 DCON7 0.00006 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 1.5 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 4
BALOK Beam No 2 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 4
BALOK Beam No 2.5 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 4
BALOK Beam No 3 DCON8 (Sp) 0.00004 DCON1
250 X 450 Messages 4
BALOK Beam No 3.5 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 4
BALOK Beam No 4 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 4
BALOK Beam No 4.5 DCON8 (Sp) 0.00004 DCON8 (Sp)
250 X 450 Messages 4
BALOK Beam No 5 DCON8 0.00007 DCON8 (Sp)
250 X 450 Messages 3
BALOK Beam No 5.5 DCON8 0.00012 DCON8 (Sp)
250 X 450 Messages 1
BALOK Beam No 6 DCON8 0.00017 DCON8 (Sp)
250 X 450 Messages 7
BALOK Beam No 0 DCON7 0.00014 DCON7 (Sp)
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 67

250 X 450 Messages 8


BALOK Beam No 0.5 DCON7 0.00009 DCON8 (Sp)
250 X 450 Messages 6
BALOK Beam No 1 DCON7 0.00005 DCON16
250 X 450 Messages 1
BALOK Beam No 1.5 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 4
BALOK Beam No 2 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 4
BALOK Beam No 2.5 DCON8 (Sp) 0.00004 DCON8
250 X 450 Messages 4
BALOK Beam No 3 DCON8 (Sp) 0.00004 DCON1
250 X 450 Messages 4
BALOK Beam No 3.5 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 4
BALOK Beam No 4 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 4
BALOK Beam No 4.5 DCON8 (Sp) 0.00004 DCON7
250 X 450 Messages 4
BALOK Beam No 5 DCON8 0.00007 DCON8 (Sp)
250 X 450 Messages
BALOK Beam No 5.5 DCON8 0.00011 DCON8 (Sp)
250 X 450 Messages 9
BALOK Beam No 6 DCON8 0.00017 DCON8 (Sp)
250 X 450 Messages 6
BALOK Beam No 0 DCON7 0.00018 DCON7 (Sp)
250 X 450 Messages 1
BALOK Beam No 0.5 DCON7 0.00012 DCON7 (Sp)
250 X 450 Messages 3
BALOK Beam No 1 DCON7 0.00007 DCON7 (Sp)
250 X 450 Messages 2
BALOK Beam No 1.5 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 5
BALOK Beam No 2 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 5
BALOK Beam No 2.5 DCON7 (Sp) 0.00004 DCON8
250 X 450 Messages 5
BALOK Beam No 3 DCON7 (Sp) 0.00004 DCON1
250 X 450 Messages 5
BALOK Beam No 3.5 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 5
BALOK Beam No 4 DCON7 (Sp) 0.00004 DCON7
250 X 450 Messages 5
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 68

BALOK Beam No 4.5 DCON7 (Sp) 0.00004 DCON7


250 X 450 Messages 5
BALOK Beam No 5 DCON8 0.00006 DCON15
250 X 450 Messages 9
BALOK Beam No 5.5 DCON8 0.00011 DCON15
250 X 450 Messages 6
BALOK Beam No 6 DCON8 0.00017 DCON8 (Sp)
250 X 450 Messages 2
BALOK Beam No 0 DCON10 0.00022 DCON10
250 X 450 Messages (Sp)
BALOK Beam No 0.5 DCON10 0.00015 DCON10
250 X 450 Messages 2 (Sp)
BALOK Beam No 1 DCON10 0.00009 DCON10
250 X 450 Messages 1 (Sp)
BALOK Beam No 1.5 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 5
BALOK Beam No 2 DCON10 0.00005 DCON9
250 X 450 Messages (Sp) 5
BALOK Beam No 2.5 DCON10 0.00005 DCON1
250 X 450 Messages (Sp) 5
BALOK Beam No 3 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 5
BALOK Beam No 3 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 5
BALOK Beam No 3.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 5
BALOK Beam No 4 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 5
BALOK Beam No 4.5 DCON10 0.00005 DCON10
250 X 450 Messages (Sp) 5
BALOK Beam No 5 DCON17 0.00009 DCON10
250 X 450 Messages 3
BALOK Beam No 5.5 DCON9 0.00014 DCON18
250 X 450 Messages 6
BALOK Beam No 6 DCON9 0.00020 DCON9 (Sp)
250 X 450 Messages 8
BALOK Beam No 0 DCON9 0.00022 DCON9 (Sp)
250 X 450 Messages 4
BALOK Beam No 0.5 DCON9 0.00015 DCON9 (Sp)
250 X 450 Messages 5
BALOK Beam No 1 DCON9 0.00009 DCON18
250 X 450 Messages 4
BALOK Beam No 1.5 DCON9 (Sp) 0.00005 DCON10
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 69

250 X 450 Messages 5


BALOK Beam No 2 DCON9 (Sp) 0.00005 DCON10
250 X 450 Messages 5
BALOK Beam No 2.5 DCON9 (Sp) 0.00005 DCON10
250 X 450 Messages 5
BALOK Beam No 3 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 5
BALOK Beam No 3 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 5
BALOK Beam No 3.5 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 5
BALOK Beam No 4 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 5
BALOK Beam No 4.5 DCON9 (Sp) 0.00005 DCON9
250 X 450 Messages 5
BALOK Beam No 5 DCON18 0.00009 DCON9
250 X 450 Messages 5
BALOK Beam No 5.5 DCON10 0.00014 DCON17
250 X 450 Messages 8
BALOK Beam No 6 DCON10 0.00021 DCON10
250 X 450 Messages 1 (Sp)
BALOK Beam No 0 DCON22 0 DCON1
250 X 450 Messages
BALOK Beam No 0.5 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 1 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 1.5 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 2 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 2.5 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 3 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 3.5 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 4 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 4.5 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
BALOK Beam No 5 DCON1 (Sp) 0.00027 DCON1
250 X 450 Messages 1
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 70

BALOK Beam No 5.5 DCON1 (Sp) 0.00027 DCON1


250 X 450 Messages 1
BALOK Beam No 6 DCON22 0 DCON20
250 X 450 Messages
BALOK Beam No 0 DCON1 0.00186 DCON1 (Sp)
250 X 450 Messages 9
BALOK Beam No 0.5 DCON1 0.00173 DCON1 (Sp)
250 X 450 Messages 6
BALOK Beam No 1 DCON1 0.00161 DCON1 (Sp)
250 X 450 Messages 4
BALOK Beam No 1.5 DCON1 0.00150 DCON1 (Sp)
250 X 450 Messages 5
BALOK Beam No 2 DCON1 0.00140 DCON1 (Sp)
250 X 450 Messages 5
BALOK Beam No 2.5 DCON1 0.00131 DCON1 (Sp)
250 X 450 Messages 7
BALOK Beam No 3 DCON1 0.00123 DCON1 (Sp)
250 X 450 Messages 7
BALOK Beam No 3.5 DCON1 0.00116 DCON1 (Sp)
250 X 450 Messages 7
BALOK Beam No 4 DCON1 0.00110 DCON1 (Sp)
250 X 450 Messages 6
BALOK Beam No 4.5 DCON1 0.00105 DCON1 (Sp)
250 X 450 Messages 3
BALOK Beam No 5 DCON1 0.00100 DCON1 (Sp)
250 X 450 Messages 9
BALOK Beam No 5.5 DCON1 0.00097 DCON1 (Sp)
250 X 450 Messages 2
BALOK Beam No 6 DCON1 0.00094 DCON1 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON1 0.00085 DCON1 (Sp)
250 X 450 Messages 7
BALOK Beam No 0.5 DCON1 0.00063 DCON20
250 X 450 Messages 5 (Sp)
BALOK Beam No 1 DCON1 0.00042 DCON20
250 X 450 Messages 8 (Sp)
BALOK Beam No 1.5 DCON20 0.00035 DCON20
250 X 450 Messages (Sp) 4 (Sp)
BALOK Beam No 2 DCON20 0.00035 DCON20
250 X 450 Messages (Sp) 4 (Sp)
BALOK Beam No 2.5 DCON20 0.00035 DCON20
250 X 450 Messages (Sp) 4 (Sp)
BALOK Beam No 3 DCON20 0.00035 DCON20
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 71

250 X 450 Messages (Sp) 4


BALOK Beam No 3.5 DCON20 0.00035 DCON1
250 X 450 Messages (Sp) 4
BALOK Beam No 4 DCON20 0.00035 DCON1
250 X 450 Messages (Sp) 4
BALOK Beam No 4.5 DCON20 0.00035 DCON1
250 X 450 Messages (Sp) 4
BALOK Beam No 5 DCON20 0.00035 DCON1
250 X 450 Messages (Sp) 4
BALOK Beam No 5.5 DCON20 0.00035 DCON1
250 X 450 Messages (Sp) 4
BALOK Beam No 6 DCON22 0 DCON1
250 X 450 Messages
BALOK Beam No 0 DCON22 0 DCON22
250 X 450 Messages
BALOK Beam No 0.5 DCON1 (Sp) 0.00016 DCON1 (Sp)
250 X 450 Messages
BALOK Beam No 1 DCON1 (Sp) 0.00016 DCON1 (Sp)
250 X 450 Messages
BALOK Beam No 1.5 DCON1 (Sp) 0.00016 DCON1 (Sp)
250 X 450 Messages
BALOK Beam No 2 DCON1 (Sp) 0.00016 DCON1 (Sp)
250 X 450 Messages
BALOK Beam No 2.5 DCON1 (Sp) 0.00016 DCON1 (Sp)
250 X 450 Messages
BALOK Beam No 3 DCON1 0.00016 DCON1 (Sp)
250 X 450 Messages
BALOK Beam No 3.5 DCON1 0.00021 DCON1 (Sp)
250 X 450 Messages 8
BALOK Beam No 4 DCON1 0.00028 DCON1 (Sp)
250 X 450 Messages 6
BALOK Beam No 4.5 DCON1 0.00035 DCON1 (Sp)
250 X 450 Messages 4
BALOK Beam No 5 DCON20 0.00035 DCON1 (Sp)
250 X 450 Messages 4
BALOK Beam No 5.5 DCON1 0.00041 DCON1 (Sp)
250 X 450 Messages 2
BALOK Beam No 6 DCON1 0.00049 DCON1 (Sp)
250 X 450 Messages 4
BALOK Beam No 0 DCON22 0 DCON22
250 X 450 Messages
BALOK Beam No 0.5 DCON1 (Sp) 0.00016 DCON1 (Sp)
250 X 450 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 72

BALOK Beam No 1 DCON1 (Sp) 0.00016 DCON1 (Sp)


250 X 450 Messages
BALOK Beam No 1.5 DCON1 (Sp) 0.00016 DCON1 (Sp)
250 X 450 Messages