You are on page 1of 1

SIMULATION RESULT FORM

PROJECT NAME: TRANSMISSION LINE FOR PUNTA ENGANO DATE: July 17, 2023

PROJECT LOCATION: LAPU LAPU, CEBU

Sizing Result Simulation Result

PROJECT BACKGROUND: The transmission line for Lapu Lapu Desalination Project.
Seawater will be the main source

Data Used in Simulation Simulation Results


Required Supply: 30 MLD Min Pre. @ Farthest Pt. 15.83 psi
Projected Billed Volume: 29.4 MLD Max Pre. @ Farthest Pt. 25.47 psi
Peak Factor: 2.31 Max Headloss 7 m/km
% NRW: 2 % Ave. Velocity 0.85 m/s
note: for the span of 10 years

Notes and Consideration: The model was subjected to 72 hr simulation diurnal pattern. Pipe size was determine using Hazen-
William formula using the data shown above. Demand was projected thru the Feasibility Study done on
July 10-15, 2023. The sizing and simulation process also accounted for the expandability of Phase 2 of the
project, which has a potential capacity of up to 30 MLD

Simulated by: Paul Daniel C. De Leon Approved by: Roldan A. Poncio


Water Supply Engineer Business Development Mngr

BD-SIMUL-FORM Summa Water Resources Inc.


Revision 0 Sales Office, 6F Ricogen Building, 112 Aguirre St. Legaspi Village, Makati City
Page 1 Contact: +632 8288 1529