You are on page 1of 37

Client:

SERENTICA RENEWABLES
Serentica INDIA 3 PVT. LTD.
Project:
290MWP/200MW SOLAR PV PLANT AT
GADAG, KARNATAKA

Owner’s Engineer:

L & T - SARGENT & LUNDY LTD.

EPC CONTRACTOR:

M/S. AMARA RAJA INFRA PRIVATE LIMITED

DOCUMENT TITLE:
OIL SUMP PIT DETAILS & NIFPS FOUNDATION DETAILS

Total No. of
Doc./Dwg. No.: SG02KS-AIPL-PVP-CIV-FND-038 Rev No.: 01
Pages: 13
Stamp:

REVISION STATUS
Prepared Reviewed Approved
Rev
Name Date Name Date
No. Name Date
Mech Elec Civil C&I
00 PVN 09-10-2023 PKA 09-10-2023 VRV 09-10-2023
01 PVN 09-10-2023 PKA 08-11-2023 VRV 08-11-2023
M/s. AMARA RAJA INFRA PVT. LTD

290MWp/200MW SOLAR PV
PLANT AT GADAG,
KARNATAKA
Serentica Doc. No.: SG02KS-AIPL-PVP-CIV-
FND-038
OIL SUMP PIT DETAILS &
NIFPS FOUNDATION Rev. No.: R1 Date: 08.11.2023
DETAILS
REVISION SUMMARY SHEET

Rev
Details / Description Date
No.
00 FOR APPROVAL 09-10-2023

01 FOR APPROVAL 08-11-2023

Page 2 of 2
OIL SUMP PIT DETAILS & NIFPS
FOUNDATION DETAILS
M/S AMARA RAJA POWER SYSTEMS LTD

V Trafo oil soak pit design


3.55 3.55

Jack Pad supports

1.80 1.24

3500 Rail wall 3.75


7.50

LV SIDE
HV SIDE
1.5 4.00

Radiator support
3.75

2800

7.10

a Calculation for Depth of soak pit required :


Area of soak pit Length x width
Area 1 sqm = 7.10 x 7.50 = 53.25
Deductions: =
Rail wall - 1 sqm = 3.67 x 0.60 x 1 = 2.202
Rail wall - 2 sqm = 3.67 x 0.84 x 1 = 3.0828
Radiator support pedestal
` sqm = 0.25 x 0.25 x 18 = 1.13
Jacking pad column sqm = 0.35 x 0.25 x 0 = 0
Cable box support sqm = 0.25 x 0.25 x 12 = 0.75
Header support sqm = 0.00 x 0.00 x 0 = 0
Control cubicle sqm = 0.00 x 0.00 x 0 = 0
Control cubicle sqm = 0.00 x 0.00 x 0 = 0
LV side ( Cable gap ) 4.00 x 1.24 x 1 4.97
HV side ( Cable gap ) 1.50 x 1.80 x 1 2.7
Total = 14.84

Total deduction in area sqm = 14.84


Net area sqm = 53.25 - 14.84
= 38.41
Total volume of Oil litres = 7500
cum = 7.5
150% Of Oil Capacity cum = 11.25
Capacity of soak pit below each Trafo have been considered as of 150% of total oil volume of respective Trafo.
" 150% volume of Total oil" (As per CEA PS
Soak pit capacity req'd cum =
14/169/2/2019- PSETD DIVISION)
(for the soak pit directly below the Trafo) cum = 11.25
cum = 11.25
Average depth below FGL m = 0.250
Depth of soak pit above FGL m = 0.35
Thickness of Gravel m = 0.30
30% Gravel considered as void to accommodate oil m = 0.09
Depth available for Oil m = 0.39 = 0.390
Net volume available for oil cum = 38.41 x 0.390
= 14.98
Consisdered 10% of oil volume as free board litres = 750
Area required for free board cum = 0.75
M/S AMARA RAJA POWER SYSTEMS LTD

Total area available for Oil = 14.23


= 14.23 > 11.25 (Reqd.) Hence safe
The ht. of side wall shall be 0.35m above FGL & Gravel to be filled in the soak pit upto a height of 0.3M
Max. soak pit depth = 0.250 m below FGL (for design)
b Design of side wall of soak pit: (As per CEA PS 14/169/2/2019- PSETD DIVISION)
The soakpit sidewall is designed for maximum depth of 250mm from FGL
Thickness of side wall = 100 mm
Height of side wall (below FGL) = 250 mm
Dia. of reinforcement bar = 8 mm
Effective depth = 100 - 40 - 4
= 56 mm
Grade of concrete = M 25
Reinforcement bar yield stress N/mm² = 500
Length of wall considered = 1 m (Assumed)
Case 1 : Considering earth pressure & surcharge from outside of wall :
Moment due to surcharge pressure at FGL
Angle of friction ø = 32 deg.
Weight of soil ϒ kg/m3 = 2100
Surcharge pressure q kg/m² = 2700
Coeff. of active earth pr. = 1 - sin ( 32 )
1 + sin ( 32 )
= 0.307
Surcharge pressure = 2700 kg/m²

Horizontal pressure on wall due to surcharge = 2700 x 0.307


= 829 kg/m²

Moment on side wall / 1.00 m length = 829 x 1 x 0.25 ² /2


= 25.9 kgm

Pressure at base due to earth pressure = 0.307 x 2100 x 0.25


( ka x density x ht.) = 161 kg/m²

2
Moment due to earth pressure = 161 x 0.25 /6x 1
= 1.7 kgm

Total moment at base of wall = 25.9 + 1.7


= 27.6 kgm
Case 2 : Considering full oil inside wall :
Pressure at base due to oil = 900 x 0.30
= 270 kg/m²

2
Hence design moment at base of wall = 270 x 0.3 /6x 1
= 4.05

Hence, design moment at base of wall = 27.6 kgm (Max of above)

i) Main reinforcement :
Mu / bd² = 1.5 x 27.6 x 9.81 x 1000
2
1000 x 56
= 0.13 N/mm²
From Table 3, SP 16 Pt = 0.070
Percentage of steel required = 0.12 (pt min.)
M/S AMARA RAJA POWER SYSTEMS LTD

Area of steel required = 0.12 x 10


= 1.2 cm²
Therefore provide 8 dia bars at 250 mm C/C as main reinforcement.
Area of steel provided (for both face) = 4.02 cm² > 1.20 cm² Hence Safe
Max. allowable Spacing of reinforcement bar = 3 x 100 = 300 mm
> 250 mm Hence Safe
ii) Distribution steel : - Horizontal reinforcement
Min. area of steel required = 0.2 x 10
(total of both sides) = 2 cm²
Therefore provide 8 dia bars at 250 mm C/C as distribution reinforcement.
Area of steel provided = 4.02 cm² > 2 cm² Hence Safe

Max. allowable Spacing of = 5 x 100 = 500 mm


reinforcement bar as per Cl.26.3.3(b) of or = 450 mm
IS 456-2000 -lesser of
= 450 > 250 Hence Safe

c Design of wall footing :


Width of wall footing = 1 m (Assumed)

Thickness of pad for side wall footing = 0.15 m

Depth of footing = 0.25 + 0.15 = 0.4 m

Total height of side wall = 0.25 + 0.35


( 0.350m above FGL ) = 0.6 m

Weight of side wall per m run = 0.6 x 0.1 x 2500


= 150 kg

Weight of base slab per m run = 1 x 0.15 x 2500


= 375 kg
Weight of earthfill over slab
On earth side = 0.25 x( 1 - 0.1 ) x 2100
2
= 236 kg
Weight of Gravel = 1520 kg
Total vertical load = 2281 kg
Check for overturning :
Total overturning moment = 27.6 kgm
Resisting moment = 150 x 1 / 2
+ 375 x 1 / 2
+ 1520 x 1 / 2
+ 236 x( 1 - 0.1 )/ 2
+ 2700 x( 1 - 0.1 )/ 2
= 2343.7 kgm
FOS against overturning = 2343.7 / 27.6
= 84.92 > 2.2 Hence safe
M/S AMARA RAJA POWER SYSTEMS LTD

Check for bearing pressure :


Actuating moment = 27.6 kgm
( b/6) = 1 / 6
= 0.167 m
Eccentricity e = 27.6 / 2281.00
= 0.012 m
Max bearing pressure = 2281.0 + 6x27.6
1x 1 1 x 1x1
= 2354.60 kg/m² < 3000 kg/m²
Hence safe
Downward pressure = 0.25 x 2100 + 0.15 x 2500
= 900 kg/m²
Net upward pressure = 2354.6 - 900
= 1454.6
Assume uniform pressure of = 1454.6 kg/m² throughout for design of pad.

moment at base of
wall = 1454.6 x( 1 - 0.1 )²/ 2
= 589 kgm
Effective depth provided = 150 - 40 - 4
= 106 mm
Mu/bd² = 1.5 x 589 x 9.81 x 1000
1000 x 106 ^2
0.771 N/mm²
From Table 3, SP 16 Pt = 0.184
Pt min = 0.12
Area of steel required = 0.184 x 10.6 = 1.95 cm²
Therefore provide 8 dia bars at 200 mm c/c bothways at top & bottom
Area of steel provided 2.51 cm² > 1.95 Hence Safe
Max. allowable Spacing of reinforcement bar= 3x 106 = 318 mm
> 200 Hence Safe

As per CEA Guideline We are providing Soak pit Oil capacity of 150% we donot required Burnt oil pit for the Soak pit.
How ever we are providing Burnt oil pit for NIFPS - System As per the NIFPS Specification ( Doc - SG02KS-AIPL-PVP-ELE-DTS-006 )
, shown in the table below:

The design calculation of Burnt Oil pit for NIFPS is illustrated below:
Inputs
1 Size of the Tank, (1.5x1.5x1.000M)
2 Length of the Tank (Clear), Clt = 1.500 m
3 Height of tank, Tw (Including free board) = 1.200 m
4 Free board depth considered = 0.200 m
5 Width of Tank, Wt = 1.500 m
2
6 Net Safe Bearing Capacity of the Soil = 11.000 T / m
3
7 Unit Weight of Soil = 1.800 T / m
8 Angle of repose = 15 (Assumed)
9 Grade of Concrete = M 25
3
10 Density of oil gw = 0.87 T / m

3
11 Density of Concrete = 2.50 T / m
Allowable Stresses in Concrete
(as per table -1 part 2 of IS 3370)
2
(i) Direct Tension = 13 Kg / cm
2
(ii) Tension Due to Bending = 18 Kg / cm

12 Grade of Steel Fe 500

Allowable Stresses in Steel (as per IS 3370)


(as per part 2 of IS 3370 -table-4)
2
(i) Tensile stress in members under Direct Tension = 1300 Kg / cm
(ii) Tensile stress in members in Bending
2
tension and shear = 1300 Kg / cm

13 Type of Design = Uncracked

14 Minimum Cover for Main Reinforcement = 30 mm for top slab


= 30 mm (water face)
= 50 mm (earth face)
= 50 mm for bottom slab

15 Codes of practice (i) IS 3370


(ii) IS 456: 2000

16 Min. Reinf: = Minimum steel for HYSD bars @ 0.12% per face
(0.24% overall), for length of the member less
(as per cl.8.1.part-2 of IS 3370)
than 15m

Calculation of Design constants:


Grade of Concrete = M 25
Allowable Stress in Concrete in Bending Compression, = 8.5 N / mm2
2
Allowable Stress in Steel in Bending Tension, sst = 130 N / mm
2
= 1300 kg / cm
Modular Ratio, m is given by = 280
3 x scb
Substituting the various values, we get, m = 10.98
The Balanced neutral axis depth, nb is given by
1
nb =
1+ sst
mscb
Substituting the various values, we get, nb = 0.418
Now, the Lever arm factor 'j' is given by
j= 1- (nb/3)
For this case, j = 0.861

Design of Vertical Wall:(Longer span & Shorter span) 1.000 M


Case I : Full oil Pressure from inside and no earth pressure, ground water pressure, surcharge pressure from outside
Height of oil, Hwl (also 'a') = 1.000 m
Assume Wall Thickness at bottom = 0.200 m
Center to Center Distance between the long walls, Wwl, (also 'b') 1.700 m
Maximum oil pressure, pb = gw x Hwl = 0.874 T / m2

b/2 b/2 Y

Fixed 1.000

wa X
1.700
Allowable stress in concrete from tension Due to Bending, scb = 18 Kg / cm2

Design Of Wall

CALCULATION OF VERTICAL REINFORCEMENT

Case I : When the tank is Full & outside empty


Base is Fixed & Top free
b= 1.50 m a= 1.20 m b/a = 1.250

Max Vertical Moment @ base on water face :

K value from Table 3 K - BY INTERPOLATION


IS-3370 Part IV 1967 1 1.25 1.250
k =0.0470 0.035 0.047 0.0470
Y=0 , X/a=1

At a depth of 1.0 m Maximum BM, Mb = K x 0.874x H^3 = 0.04 Tm / m


41.1 kgm / m

K value from Table 3 K - BY INTERPOLATION


IS-3370 Part IV 1967 1 1.25 1.250
k =0.0140 0.009 0.014 0.0140
Y=0 , X/a=1/2

At a depth of 1.5 m Maximum BM, Mb = K x 0.874x H^3 = 0.04 Tm / m


41.3 kgm / m

Case II : When the tank is empty - Soil & surcharge pressure from outside

Calculation of moment due to surcharge pressure:


2
Surcharge (Assumed) = 1000 Kg / m
Coefficient of active earth pressure Ka = 1- sin( f )
1+ sin( f )
Ka = 0.59

Pressure due to surcharge = 0.59 x 1000


= 590 kg/m2

At a Depth of 1.200 m

b= 1.50 m a= 1.20 m b/a = 1.250


Max Vertical Moment @ base on earth face :

K value from Table 4 K - BY INTERPOLATION


IS-3370 Part IV 1967 1 1.25 1.250
k =0.0630 0.044 0.063 0.0630
Y=0 , X/a=1

At a depth of 1.0 m Maximum BM, Mb = K x 590x H^2 = 37.17 kgm / m

Calculation of moment due to earth pressure:

Max Vertical Moment @ base on Earth face :


b= 1.50 m a= 1.20 m b/a = 1.250

K value from Table 3 K - BY INTERPOLATION


IS-3370 Part IV 1967 1 1.25 1.250
k =0.0470 0.035 0.047 0.0470
Y=0 , X/a=1

At a depth of 1.0 m Maximum BM, Mb = K x 1.8x H^3 = 0.08 Tm / m


84.60 kgm / m

Total BM at base of wall = 37.17+84.6 = 122 kg-m/m

Thickness of Wall required, twl =  Mb x 6 = 6.37 cm


scb
Required 70 mm thick Wall Hence Provide 150 mm

Assuming 10 mm dia bars,

Effective cover = Clear cover + half the dia of the Bar = 55 mm


Effective Depth of the Wall at the Bottom, deff = 95 mm

Calculation of reinforcement in Earth face:


Mx
Ast (-) required = = 101.1 mm2 / m
sst x j x deff

Min Reinforcement = 0.12x150x1000 = 180.0 mm2 / m


( as per 3370 (part-2) - 2009 ) 100

Provide 10 mm @ 250 mm c/c on the Vertical Face wall on outer face


Ast provided = 314 mm
2

Calculation of reinforcement in water face:


Mx
Ast (-) required = = 37.9 mm2 / m
sst x j x deff

Provide 10 mm @ 250 mm c/c on the Vertical Face wall on Water/inner face


Ast provided = 314 mm
2
CALCULATION OF HORIZONTAL REINFORCEMENT

Height of wall = 1.200 m


Calculation of moment due to surcharge pressure:

b= 1.50 m a= 1.20 m b/a = 1.250

Max Vertical Moment @ base on earth face :

K value from Table 4 K - BY INTERPOLATION


IS-3370 Part IV 1967 1 1.25 1.250
k =0.0440 0.044 0.044 0.0440
Y=0 , X/a=1

At a depth of 1.20 m Maximum BM, Mb = K x 590x H^3 = 44.86 kgm / m

Maximum BM at mid span


surcharge pressure 1000x1.2x1.2 / 12 = 120.00 kg/m

Max horizontal Moment :


b= 1.50 m a= 1.20 m b/a = 1.250

K value from Table 3 K - BY INTERPOLATION


IS-3370 Part IV 1967 1 1.25 1.250
k =0.0150 0.013 0.015 0.0150
Y=0 , X/a=1

At a depth of 1.20 m Maximum BM, Mb = K x 1.8x H^3 = 0.05 Tm / m


46.66 kgm / m

Total horizontal BM = 91.52 kg-m/m


Thickness of Wall required, twl =  Mb x 6 = 5.5 cm
scb
Required 60 mm thick Wall. Hence Provide 200 mm @ mid span

Effective cover = Clear cover + half the dia of the Bar = 55 mm


Effective Depth of the Wall at the Bottom, deff = 145 mm
Mx =
Ast (-) required = 55.3 mm2 / m
sst x j x deff

Min Reinforcement = 0.12x60x1000 = 72.0 mm2 / m


( as per 3370 (part-2) - 2009 ) 100

Required 10 mm @ 250 mm c/c on the horizontal Face wall on both face


Ast provided = 314 mm
2

Design of Bottom Slab


Case I : Full water pressure from inside and no earth pressure & ground water pressure
& surcharge pressure from outside.
Assume Thickness of Slab = 200 mm
Self Weight of Slab = 0.50 T / m
2

Self Weight of oil = 1.05 T / m


2

2
Total = 1.55 T / m
Span along shorter side lx = 1.50 m
Span along longer side ly = 1.50 m
ly / lx = 1.00 < 2
= Two way slab

(Four Edges DisContinuous)


Max BM as per IS456:2000
Maximum BM, Mb = 0.056 = 0.20 Tm / m
= 195 kg cm/ cm
Allowable stress in concrete from tension Due to Bending,
2
scb = 18 Kg / cm

Mb x 6
\ Thickness of Slab required, ts = = 8.07 cm
scb

Required 90 mm thick Slab Hence Provide 200 mm

Assuming 10 mm dia bars,


Effective cover = Clear cover + half the dia of the Bar = 55 mm

\ Effective Depth of the Wall at the Bottom, deff = = 145 mm


Mx
Ast (-) required = = 118.0 mm2 / m
sst x j x deff
Min Reinforcement = 0.12x90x1000 = 108.0 mm2 / m
( as per 3370 (part-2) - 2009 ) 100

Provide 10 mm @ 250 mm c/c


Ast provided = 314 mm
2

Base pressure check


Consider 1m run of the slab.
Thickness of base slab = 200 mm
Overhang on each side = 300 mm
Thickness of top slab = 100 mm
Total length of base slab
( incl. overhang & wall thickness ) = 2400 mm
= 2.4 m
Weight of roof slab = 375 kg/m
Weight of side walls = 420 kg/m
Weight of base slab = 1200 kg/m
Total weight = 1995 kg/m
2 2
Base pressure = 831.25 kg/m < 11000 kg/m
Hence safe
Net pressure 831.25-(200/1000X2500) = 331.25 kg/m2
Cantilever BM = 14.906 kgm
Moment transferred from side walls = 121.77 kgm
BM due to base pressure (331.25x1.5^2)/12 = 62.00 kgm
Resultant BM 14.90625+121.77-62 = 74.68 kgm
Central hogging moment (331.25*1.7^2)/8 = 120 kgm
Hence design moment = 120.00 kgm/m
= 120.00 kg cm/cm
Mb x 6
\ Thickness of Slab required, ts = = 6.32 cm
scb
say = 200 mm
Assuming 10 mm dia bars,

Effective cover = Clear cover + half the dia of the Bar = 55 mm

\ Effective Depth of the Wall at the Bottom, deff = = 145 mm


Mx
Ast (-) required = = 72.5 mm2 / m
sst x j x deff

Min Reinforcement = 0.12x200x1000 = 240.0 mm2 / m


( as per 3370 (part-2) - 2009 ) 100

Required 10 mm @ 250 mm c/c on the Shorter side at top & bottom


2
Ast provided = 314 mm
Check for Tension
Force on the Wall due to soil pressure 1.5x1.8x1.2 = 3.24 T / m
Force on the Wall due to surcharge 1.5x0.59x1.2 = 1.062 T / m
Total tension force on wall = 4.302 T / m
Tension on Each Wall = 2.151 T / m

Tensile Stress in Concrete (2.151*1000)/(100*150/10) = 1.43 Kg / cm


2

< 17 kg /cm2 SAFE

Ast for Tension requirement,T/Sst 2.151*1000/1300 = 1.655 cm


2

Ast required per Phase = 0.83 cm


2

2
= 82.73 mm
Required 10 mm @ 250 mm c/c on the Longer side at top & bottom
Ast provided = 314 mm
2

Check for uplift L B H Projection of base slab 0.2 m


2.2 2.2 1.2
Uplift force = 58.08 kN

Weight of top slab = 36.125 kN


Weight of base slab = 18.15 kN
Weight of walls = 343.2 kN
Soil weight with 15Degree wedge = 448.554 kN
Total resistance = 846.029 kN Factor of safety against uplift = 14.57 >1.2 Hence OK
Check for Combined Stress
Thickness of Wall = 150 mm
Permissible Bending compression stress in concrete,
σcbc = 8.5 N/mm
2

Permissible tensile stress in Steel, σst = 130 N/mm2


Modular Ratio, m = 280 / 3 σcbc = 10.98
K = (1/(1+(σst/m σcbc))) = 0.418
j = 1-(k/3) = 0.861

Designed for per meter length, hence b = 1500 mm


Tension on Each Wall 2.151x9.81 = 21.10 kN

IS 3370 (P-II) Permissible Bending tensile stress in concrete = 1.8 N/mm( σcbt )

Reinforcement provided in earth face = 314.16 mm2


Reinforcement provided in water face = 314.16 mm2

Permissible direct tensile stress in concrete σct = 1.30 N/mm2


Actual direct tensile stress in concrete σct' = T / (Ac + mAst)
σct' = 0.091 N/mm2
σct' / σct = 0.07 N/mm2
Maximum Horizontal moment M = 0.90 kN-m (Absolute)
Section Modulus Z = 6E+06 mm3 (Z=bD2/6)
Actual bending stress in concrete σcbt' = 0.16 N/mm2
σcbt' / σcbt = 0.09 N/mm2
(σct' / σct) + (σcbt' / σcbt) = 0.16 < 1.0 Safe
Design of Top slab :

Design of Two Slab (1.5m x 1.5m Panel)- Tank Top Slab

Span along shorter side = 1.500 m


lx = 1500 + 65 lx
= 1.565 m

Span along longer side = 1.500 m ly


ly = 1500 + 55
= 1.555 m

ly / lx = 1.555 / 1.565
= 1.0 < 2 Hence, Two Way Slab
Depth of Slab
Assume Depth of Slab = 100 mm Thinkness of finish = 50 mm

Clear cover = 30 mm

Dia of Main Reinforcement = 10 mm

Effective Depth of slab


dx = 100 - 30 - 10 / 2 = 100 - 30 - 10 - 10 / 2
= 65 mm in x- direction = 55 mm in y- direction

Load on Slab
Density of concrete (RCC) = 25 kN/m3
Steel grade = Fe 500
Concrete Grade =M 30

Self Weight of Slab = 0.1 x 25


= 2.500 kN/m2

Weight of the finishes over roof slab for = 0.050 x 25


= 1.250 kN/m2

Live load = 3.00 kN/m2 (From Design Base Report)

Total load , w = 2.500 + 1.250 + 3.00


= 6.75 kN/m2
Edge Condition: Four Edges Discontinuous
2
Mx = αx w lx
2
Mx = αy w lx

From Table 26 of IS:456-2000


αx(-ve) = - αy(-ve) = -
αx(+ve) = 0.056 αy(+ve) = 0.056

w lx2 = 6.750 x 1.565 2

= 16.532 kN
Shorter Span Longer Span
At midspan At Midspan
Mx(+ve) = 0.056 x 16.5322688 Mx(+ve) = 0.056 x 16.532
= 0.93 kNm = 0.93 kNm

Mu/bd
(+ve) = ( 0.9 x 10 6
x 1.5 ) Mu/bd2 (+ve) = ( 0.93 x 10 6
x 1.5 )
2 2
( 1000 x 65 ) ( 1000 x 55 )
= 0.329 = 0.459
From Table 3 of SP-16 From Table 3 of SP-16
Pt(+ve) = 0.077 Pt(+ve) = 0.108

Ast(+ve) = ( 0.120 ) x 1000 x 65 Ast(+ve) = ( 0.120 ) x 1000 x 55


100 100
= 78 mm2 = 66 mm2

Ast Min = 78 mm2 Ast Min = 66 mm2

Hence Provide 8 dia bars @ 250 c/c Hence Provide 8 dia bars @ 250 c/c

2 78.00 2 66.00
= 201.1 mm
Ast provided > mm2 Ast provided = 201.1 mm > mm2
Hence safe Hence safe

Check for Deflection:


Actual lx / d = 1.565 / 0.065
= 24.08

Pt Provided = ( 201.1 x 100 ) / ( 1000 x 65 )


= 0.31 %

Steel Stress of service loads = 0.58 x fy xAst req


Ast prov
= 112.5 N/mm2

Clause 23.2.1 (a):IS 456, = 25


( For simply supported edges lx/d )

Modification factor from fig 4 :IS:456 = 2.00


lx/d = 2.00 x 25
= 50.00
Actual lx/d = 24.08 < 50.00
Hence safe
NIFPS FOUNDATION DETAILS
" M/S AMARA RAJA INFRA PVT LTD

Wind pressure calculations


Input Details :
(Height of NIFPS =1.7m+0.3m = 2m Above FGL)
a. Wind Pressure :
Location : Serentica
Basic wind speed ( Vb ) = 33 m/sec
b. Wind Load Calculations
Basic wind speed ( Vb ) as per Figure.1 of IS : 875 ( part - 3 ) = 33 m/sec

Design wind speed : As per Cl.6.3 of IS : 875 ( part - 3 )

Vz = Vb* k1* k2* k3*k4

Vb = Basic wind speed

k1 = Probability factor ( Risk coefficient ). = 0.94


( From Table - 1, for Importartant buildings )

k2 = Terrain, height and structure size factor. = 1.05


( From Table 2, forTerrain category -1, height - 10 m )

k3 = Topography factor. = 1

k4 = Importance factor for cyclonic Region = 1


(This value has been
( From cl 6.3.4) taken considering the
location to be non

Design wind speed , Vz = 33 x 0.94 x 1.05


x 1x 1

= 32.571 m/s

i. Wind pressure : ( as per cl. 7.2 of IS : 875 )


Pz = 0.6 x Vz²

= 0.6 x 32.571 ^ 2
2
= 636.5 N/m
2
= 0.6365 Kn/m
2
= 64.91 Kg/m
Design Wind pressure : ( as per cl. 7.2 of IS : 875 )
Pd = Pz ka kd kc
Wind Directionality factor (IS 875-Part III, Sec 7.2.1), Kd = 0.9
Area Averaging factor (IS 875-Part III, Sec 7.2.2, Table-4), Ka = 0.95
Combination factor ( IS875-Part III ,Clause 7.3.3.13) Kc = 0.9
Pd = 49.95 kg/m²
= 50 kg/m² (Say)
ii. Wind on Solid members - flat sided : (NIFPS)

Force co - efficient cf = 2
(From Table - 31, IS 875 , part 3 for flat sided individual members )

Hence wind pressure on exposed area = 2x 50


= 100 kg/m²
c. Wind pressure oncomponent as follows:

iii. Wind on solid members - NIFPS = 100 kg/m²


M/S AMARA RAJA INFRA PVT LTD

BASE RAFT STRESSES:

X Y
MX+MXY MY+MXY
0.4 0.3 Top
0.3 0.4 Bottom

SQX SQY
0.03 0.039 Top
0.04 0.022 Bottom
M/S AMARA RAJA INFRA PVT LTD

DESING OF BASE RAFT


Check for Base pressure :

Horizontal Vertical Horizontal


2 2 2
Node Load Combinations Fx kN/m Fy kN/m Fz kN/m
Max Px 245 1 DEAD LOAD 0.00 0.013 0.00
Min Px 245 1 DEAD LOAD 0.00 0.013 0.00
Max Py 256 103 COMBINATION LOAD CASE 3 0.00 0.024 0.00
Min Py 256 4 LOAD CASE 3 0.00 -0.015 0.00
Max Pz 245 1 DEAD LOAD 0.00 0.013 0.00
Min Pz 245 1 DEAD LOAD 0.00 0.013 0.00

2
Maximum base pressure from STAAD = 0.02 kN/m
2
Net bearing pressure of soil = 148.00 kN/m
Safe (from soil test report)

DATA
2
Grade of concrete fck = 25 N/mm
2
Grade of steel fy = 500 N/mm
Thickness of wall @ base level Dc = 350 mm
Assume Thickness of base slab D = 150 mm
Clear cover Dc = 30 mm
Effective depth d1 = D-Dc-dm/2 = 115.00 mm
DESIGN OF BASE SLAB
Factored Bending moment about XX @ Bottom Mux = 0.39 kN.m b= 1000
Effective depth Required dreq = √ (Muz/0.133*fck*b) = 10.83 < d
Effective depth Provided dpro = 115.00 mm
Hence Depth Provided Ok
AST CALCULATION ABOUT X-X DIRECTION @ BOTTOM : consider
2
Mux/bd = 0.0295 singly
Percentage of Steel Required From SP-16, P = 0.007 % ( As per clause
Minimum area of steel = 0.0012*b*D 26.5.2.1 of IS 456)
= 138 sqmm.
Minimum percentage of steel = 0.120 %
2
Area of steel required Ast req = (P/100)*B*d = 138.00 mm
Dia.of bar dm = 10 mm
2
Spacing Required (π*d /4)*B/Ast req = 569.20 mm
Provided spacing Sp = 200 mm
Percentage of steel provided = 0.34 %
2
Hence Area of Steel Provided Ast pro = 392.70 mm Hence Ok
Provide 10mm Dia bars 200mm C/C Along Bottom in X-X
AST CALCULATION ABOUT Y-Y DIRECTION@ BOTTOM (Main bars) :
Factored Bending moment about YY @ Bottom = 0.58 KN.m b= 1000
= kN-m mm
Effective depth Required dreq = √ (Muz/0.133*fck*b) = 13.23 < d
Effective depth Provided dpro = 115.00 mmconsider
2
Muz/bd = 0.04 singly
Percentage of Steel Required From SP-16, P = 0.011 %
( As per clause
Minimum percentage of steel = 0.0012*b*D 26.5.2.1 of IS 456)

= 138

Minimum percentage of steel = 0.120 %


2
Area of steel required Ast req = (P/100)*B*d = 138.00 mm
Dia.of bar dm = 10
2
Spacing Required (π*d /4)*B/Ast req = 569.20 mm
Provided spacing Sp = 200 mm

Percentage of steel provided = 0.34 %


2
Hence Area of Steel Provided Ast pro = 392.70 mm Hence Ok

Provide 10+mm Dia bars 200mm C/C Along Bottom in Y-Y


M/S AMARA RAJA INFRA PVT LTD

AST CALCULATION ABOUT X-X DIRECTION @ TOP :


Factored Bending moment about XX @ Top Mux = 0.63 kN.m b= 1000

Effective depth Required dreq = √ (Muz/0.133*fck*b) = 13.81 < d


Effective depth Provided dpro = 115.00 mm

Hence Ok
AST CALCULATION ABOUT X-X DIRECTION @ TOP :
consider
singly
2
Mux/bd = 0.04798 Reinforced
Percentage of Steel Required From SP-16, P = 0.012 %
( As per clause
Minimum area of steel = 0.0012*b*D 26.5.2.1 of IS 456)
= 230 sqmm.
Minimum percentage of steel = 0.200 %
2
Area of steel required Ast req = (P/100)*B*d = 230.00 mm
Dia.of bar dm = 10 mm
2
Spacing Required (π*d /4)*B/Ast req = 341.50 mm
Provided spacing Sp = 200 mm

Percentage of steel provided = 0.34 %


2
Hence Area of Steel Provided Ast pro = 392.70 mm Hence Ok

Provide 10mm Dia bars 200mm C/C Along Bottom in X-X


AST CALCULATION ABOUT Y-Y DIRECTION@ TOP :
Factored Bending moment about ZZ @ Top = 0.45 KN.m b= 1000
= mm
Effective depth Required dreq = √ (Muz/0.133*fck*b) = 11.63 < d
Effective depth Provided dpro = 115.00 mm
consider
singly
2
Muz/bd = 0.03 Reinforced
Percentage of Steel Required From SP-16, P = 0.008 %
( As per clause
Minimum percentage of steel = 0.0012*b*D 26.5.2.1 of IS 456)
= 138.000

Minimum percentage of steel = 0.120 %


2
Area of steel required Ast req = (P/100)*B*d = 138.00 mm
Dia.of bar dm = 10
2
Spacing Required (π*d /4)*B/Ast req = 569.20 mm
Provided spacing Sp = 200 mm

Percentage of steel provided = . %


2
Hence Area of Steel Provided Ast pro = 392.70 mm Hence Ok

Provide 10mm Dia bars 200mm C/C Along Bottom in Z-Z

Shear check
2
Shear stress from the STAAD Model = 0.039 N/mm
Factored shear force Vu = 7 kN
2
Nominal Shear stress ζv = 0.04 N/mm

Percentage of steel Pt = 0.400 %


2
Design shear stress From IS 456, ζc = 0.45 N/mm
ζv < ζ'c

(As per IS 456 cluse B-5.5.1. ) HENCE OK


M/S AMARA RAJA INFRA PVT LTD

Check for Sliding

Factor of safety for Sliding = 1.5

Sliding = Resisting weight ⁄ Resultant Force


= µ * R⁄F
= 0.4* (Self Weight of pedestal&Raft+Soil overburden+Fy) /Resultant Force
= 0.4*(((0.35*0.8*1.1)*25)+(1.1*0.9*0.15)*25)+2.2+(1.1*0.8*0.8)*18)
= 0.4*((7.7+3.71+2.2)+12.67))
= 10.512 kN
Resultant Force = (Fx2+(Fz/2)2)1/2
= 2.383
Factor of safety againast = 10.512 ⁄ 2.383
Sliding
= 4.41 > 1.5 Safe

Check for Overturning

Factor of safety againast


Overturning = 1.5
Overturning = Resisting Moment ⁄ Overturning Moment
Resisting Moment = (P*E) P=Vertical Load(Fy)
= (7.7+3.71+2.2+12.67)(1.8/2) E=Effective distance
= (26.28*(1.8/2))
= 23.652 Kn-m

Overturning Moment = Max (Mx,Mz)


= Max (3.4,2.9)
= 3.4 Kn-m
Factor of safety = (23.652/3.4)
= 6.956470588
= 7.0 > 1.5 Safe
M/S AMARA RAJA INFRA PVT LTD

WALL STRESSES:

X Y
MX+MXY MY+MXY
1.3 1.5 OUTER
1.8 1.1 INNER

SQX SQY
0.006 0.007 OUTER
0.009 0.006 INNER
M/S AMARA RAJA INFRA PVT LTD

DESIGN OF WALL
DATA
2
Grade of concrete fck = 25 N/mm
2
Grade of steel fy = 500 N/mm
Thickness of wall @ base level Dc = 350 mm

Assume Thickness of base slab D = 350 mm


Clear cover Dc = 40 mm
Effective depth d1 = D-Dc-dm /2 = 304.00 mm

DESIGN OF WALL
Factored Bending moment about XX @ Bottom Mux = 2.72 kN.m b= 1000
Effective depth Required dreq = √ (Muz/0.133*fck*b) = 28.60 < d
Effective depth Provided dpro = 304.00 mm
Hence Depth Provided Ok
AST CALCULATION ABOUT X-X DIRECTION @ INNER :
consider
singly
2
Mux/bd = 0.03 Reinforced
Percentage of Steel Required From SP-16, P = 0.007 %
( As per clause
Minimum area of steel = 0.002*b*D 26.5.1.1 of IS 456)

= 608 sqmm.
Minimum percentage of steel = 0.200 %
2
Area of steel required Ast req = (P/100)*B*d = 608.00 mm
Dia.of bar dm = 8 mm
2
Spacing Required (π*d /4)*B/Ast req = 82.70 mm
Provided spacing Sp = 150 mm

Percentage of steel provided = 0.11 %


2
Hence Area of Steel Provided Ast pro = 335.10 mm Revise spacing

Provide 8mm Dia bars 150mm C/C Along Bottom in X-X


AST CALCULATION ABOUT Y-Y DIRECTION@ INNER (Main bars) :
Factored Bending moment about YY @ Bottom = (Inner wall moment *1.5)
1.67 KN.m b= 1000
= 1.67 kN-m mm
Effective depth Required dreq = √ (Muz/0.133*fck*b) = 22.41 < d
Effective depth Provided dpro = 304.00 mm
consider
2
Muz/bd = 0.02 singly
Reinforced

Percentage of Steel Required From SP-16, P = 0.005 %


( As per clause
Minimum percentage of steel = 0.002*b*D 26.5.1.1 of IS 456)

= 608
Minimum percentage of steel = 0.200 %
2
Area of steel required Ast req = (P/100)*B*d = 608.00 mm
Dia.of bar dm = 12
2
Spacing Required (π*d /4)*B/Ast req = 186.10 mm
M/S AMARA RAJA INFRA PVT LTD

Provided spacing Sp = 180 mm

Percentage of steel provided = 0.21 %


2
Hence Area of Steel Provided Ast pro = 628.32 mm Hence Ok

Provide 12mm Dia bars 180mm C/C Along Bottom in Y-Y

AST CALCULATION ABOUT X-X DIRECTION @ OUTER :


Factored Bending moment about XX @ Top Mux = 1.90 kN.m b= 1000

Effective depth Required dreq = √ (Muz/0.133*fck*b) = 23.88 < d


Effective depth Provided dpro = 304.00 mm

Hence Ok
AST CALCULATION ABOUT X-X DIRECTION @ OUTER :
consider
singly
2
Mux/bd = 0.02 Reinforced
Percentage of Steel Required From SP-16, P = 0.005 %
( As per clause
Minimum area of steel = 0.002*b*D 26.5.1.1 of IS 456)
= 608 sqmm.
Minimum percentage of steel = 0.200 %
2
Area of steel required Ast req = (P/100)*B*d = 608.00 mm
Dia.of bar dm = 8 mm
2
Spacing Required (π*d /4)*B/Ast req = 82.70 mm
Provided spacing Sp = 150 mm

Percentage of steel provided = 0.11 %


2
Hence Area of Steel Provided Ast pro = 335.10 mm Revise spacing

Provide 8mm Dia bars 150mm C/C Along Bottom in X-X


AST CALCULATION ABOUT Y-Y DIRECTION@ OUTER :
Factored Bending moment about ZZ @ Top = 2.26 KN.m b= 1000
= kN-m mm
Effective depth Required dreq = √ (Muz/0.133*fck*b) = 26.07 < d
Effective depth Provided dpro = 304.00 mm
consider
singly
2
Muz/bd = 0.02 Reinforced
Percentage of Steel Required From SP-16, P = 0.006 %
( As per clause
Minimum percentage of steel = 0.002*b*D 26.5.1.1 of IS 456)
= 608.000
Minimum percentage of steel = 0.200 %
2
Area of steel required Ast req = (P/100)*B*d = 608.00 mm
Dia.of bar dm = 12
2
Spacing Required (π*d /4)*B/Ast req = 186.10 mm
Provided spacing Sp = 180 mm

Percentage of steel provided = 0.21 %


2
Hence Area of Steel Provided Ast pro = 628.32 mm Hence Ok
Provide 12+mm Dia bars 180mm C/C Along Bottom in Z-Z
M/S AMARA RAJA INFRA PVT LTD

Shear check
2
Factored Shear stress from the STAAD Model about ZZ = 0.007 N/mm
Factored shear force Vu = 3 kN
2
Nominal Shear stress ζv = 0.01 N/mm

Percentage of steel Pt = 0.300 %


2
Design shear stress From IS 456, ζc = 0.39 N/mm
ζv < ζ'c

(As per IS 456 cluse B-5.5.1. ) HENCE OK


Job Title: ANALYSIS

Client: Serentica

Engineer:
STAAD SPACE IDT FOUNDATION
START JOB INFORMATION
ENGINEER DATE 06/11/2023
JOB NAME ANALYSIS
JOB CLIENT Serentica
JOB REV 01
CHECKER DATE 06/11/2023
APPROVED DATE 06/11/2023
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
88 1.69262 -1.22575 1.54275; 89 1.69262 -1.22575 1.34113;
90 1.69263 -1.22575 1.1415; 91 1.69262 -1.22575 0.941875;
92 1.69262 -1.22575 0.74225; 97 1.69262 -0.9505 1.54275;
98 1.69263 -0.9505 1.34113; 99 1.69262 -0.9505 1.1415;
100 1.69262 -0.9505 0.941875; 101 1.69263 -0.9505 0.74225;
106 1.69263 -0.67525 1.54275; 107 1.69262 -0.67525 1.34113;
108 1.69262 -0.67525 1.1415; 109 1.69263 -0.67525 0.941875;
110 1.69263 -0.67525 0.74225; 115 1.69262 -0.4 1.54275;
116 1.69262 -0.4 1.34113; 117 1.69263 -0.4 1.1415; 118 1.69262 -0.4 0.941875;
119 1.69262 -0.4 0.74225; 160 0.542376 -1.22575 0.74225;
161 0.542376 -1.22575 0.941875; 162 0.542376 -1.22575 1.1415;
163 0.542376 -1.22575 1.34113; 164 0.542376 -1.22575 1.54275;
169 0.542376 -0.9505 0.74225; 170 0.542376 -0.9505 0.941875;
171 0.542376 -0.9505 1.1415; 172 0.542376 -0.9505 1.34113;
173 0.542376 -0.9505 1.54275; 178 0.542376 -0.67525 0.74225;
179 0.542376 -0.67525 0.941875; 180 0.542376 -0.67525 1.1415;
181 0.542376 -0.67525 1.34113; 182 0.542376 -0.67525 1.54275;
187 0.542376 -0.4 0.74225; 188 0.542376 -0.4 0.941875;
189 0.542376 -0.4 1.1415; 190 0.542376 -0.4 1.34113; 191 0.542376 -0.4 1.54275;
245 2.01738 -1.5 1.71413; 247 2.01738 -1.5 0.570874; 254 0.217631 -1.5 1.71413;
256 0.217631 -1.5 0.571474; 335 1.36762 -1.5 1.71375; 336 1.368 -1.5 1.42813;
337 1.36762 -1.5 1.1425; 338 1.368 -1.5 0.856875; 339 1.36763 -1.5 0.57125;
354 1.11762 -1.5 1.71375; 355 1.11763 -1.5 1.42813; 356 1.11762 -1.5 1.1425;
357 1.11763 -1.5 0.856875; 358 1.11763 -1.5 0.57125; 367 0.867618 -1.5 1.71375;
368 0.867629 -1.5 1.42813; 369 0.867618 -1.5 1.1425;
370 0.867629 -1.5 0.856875; 371 0.867629 -1.5 0.57125;
387 0.217628 -1.5 1.42813; 388 0.217617 -1.5 1.1425;
389 0.218001 -1.5 0.856875; 465 2.01763 -1.5 1.42813; 466 2.01762 -1.5 1.1425;
467 2.01763 -1.5 0.856875; 527 1.69238 -1.5 1.71413; 528 1.69238 -1.5 0.570874;
530 1.69263 -1.5 1.42813; 531 1.69262 -1.5 1.1425; 532 1.69263 -1.5 0.856875;
534 0.542631 -1.5 1.71413; 535 0.542631 -1.5 0.571474;
537 0.542628 -1.5 1.42813; 538 0.542617 -1.5 1.1425;
539 0.543001 -1.5 0.856875; 541 0.542376 -1.5 1.54275;
E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.STD
Job Title: ANALYSIS

Client: Serentica

Engineer:
542 0.542376 -1.5 1.34113; 544 0.542376 -1.5 0.941875;
545 0.542376 -1.5 0.74225; 546 1.69262 -1.5 1.54275; 547 1.69263 -1.5 1.34113;
549 1.69263 -1.5 0.941875; 550 1.69263 -1.5 0.74225;
ELEMENT INCIDENCES SHELL
78 88 89 98 97; 79 89 90 99 98; 80 90 91 100 99; 81 91 92 101 100;
86 97 98 107 106; 87 98 99 108 107; 88 99 100 109 108; 89 100 101 110 109;
94 106 107 116 115; 95 107 108 117 116; 96 108 109 118 117; 97 109 110 119 118;
123 357 356 369 370; 124 356 355 368 369; 131 355 354 367 368;
132 358 357 370 371; 143 160 161 170 169; 144 161 162 171 170;
145 162 163 172 171; 146 163 164 173 172; 151 169 170 179 178;
152 170 171 180 179; 153 171 172 181 180; 154 172 173 182 181;
159 178 179 188 187; 160 179 180 189 188; 161 180 181 190 189;
162 181 182 191 190; 165 338 337 356 357; 172 337 336 355 356;
173 336 335 354 355; 180 339 338 357 358; 181 256 535 545; 182 256 545 539 389;
183 389 539 544; 184 389 544 538 388; 185 388 538 542; 186 388 542 537 387;
187 387 537 541; 188 387 541 534 254; 189 535 371 370 545; 190 545 370 539;
191 539 370 369 544; 192 544 369 538; 193 538 369 368 542; 194 542 368 537;
195 537 368 367 541; 196 541 367 534; 197 339 528 550; 198 339 550 532 338;
199 338 532 549; 200 338 549 531 337; 201 337 531 547 336; 202 336 547 530;
203 336 530 546 335; 204 335 546 527; 205 528 247 467 550; 206 550 467 532;
207 532 467 466 549; 208 549 466 465 531; 209 531 465 547; 210 547 465 530;
211 530 465 546; 212 546 465 245 527; 215 162 544 538; 216 163 162 538 542;
220 92 91 532 550; 221 91 90 549 532; 225 88 546 530; 226 89 547 531;
227 89 88 530 547; 228 549 90 531; 229 531 90 89; 230 537 541 164;
231 542 537 163; 232 163 537 164; 233 161 539 544 162; 234 160 545 539 161;
START GROUP DEFINITION
GEOMETRY
_WALLR.F 78 TO 81 86 TO 89 94 TO 97 143 TO 146 151 TO 154 159 TO 162 215 216 -
220 221 225 TO 234
JOINT
_SUPPORT 245 247 254 256 335 TO 339 354 TO 358 367 TO 371 387 TO 389 -
465 TO 467 527 528 530 TO 532 534 535 537 TO 539
ELEMENT
_RAFT 123 124 131 132 165 172 173 180 TO 212
END GROUP DEFINITION
ELEMENT PROPERTY
78 TO 81 86 TO 89 94 TO 97 143 TO 146 151 TO 154 159 TO 162 215 216 220 221 -
225 TO 234 THICKNESS 0.35
123 124 131 132 165 172 173 180 TO 212 THICKNESS 0.15
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+07
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-05
E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.STD
Job Title: ANALYSIS

Client: Serentica

Engineer:
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 27579
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
245 247 254 256 335 TO 339 354 TO 358 367 TO 371 387 TO 389 465 TO 467 527 -
528 530 TO 532 534 535 537 TO 539 ELASTIC MAT DIRECT Y SUBGRADE 6708 PRINT
LOAD 1 LOADTYPE Dead TITLE DEAD LOAD
SELFWEIGHT Y -1
ELEMENT LOAD
123 124 131 132 165 172 173 180 TO 212 PR GY -4.41
94 TO 97 TRAP Y -0.9 -0.45
86 TO 89 TRAP Y -1.35 -0.9
78 TO 81 TRAP Y -1.8 -1.35
220 221 225 TO 229 TRAP Y -2.25 -1.8
159 TO 162 TRAP Y -0.9 -0.45
151 TO 154 TRAP Y -1.35 -0.9
143 TO 146 TRAP Y -1.8 -1.35
215 216 230 TO 234 TRAP Y -2.25 -1.8
LOAD 2 LOADTYPE None TITLE LOAD CASE 1
JOINT LOAD
115 119 187 191 FY -1.1
187 FY 1
191 FY 1
119 FY -1
115 FY -1
115 119 187 191 FZ 0.5
LOAD 3 LOADTYPE None TITLE LOAD CASE 2
JOINT LOAD
115 119 187 191 FY -1.1
187 FY 0.9
191 FY 0.9
119 FY -0.9
115 FY -0.9
115 119 187 191 FZ 0.2
LOAD 4 LOADTYPE None TITLE LOAD CASE 3
JOINT LOAD
115 119 187 191 FY -1.1
187 FY 1.1
191 FY 1.1
119 FY -1.1
115 FY -1.1
115 119 187 191 FZ 0.4
E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.STD
Job Title: ANALYSIS

Client: Serentica

Engineer:
187 FY 0.7
191 FY -0.7
119 FY 0.7
115 FY -0.7
115 119 187 191 FX 0.1
LOAD 5 LOADTYPE None TITLE LOAD CASE 4
JOINT LOAD
115 119 187 191 FY -1.1
187 FY 0.3
191 FY 0.3
119 FY -0.3
115 FY -0.3
115 119 187 191 FZ 0.1
LOAD 6 LOADTYPE None TITLE LOAD CASE 5
JOINT LOAD
115 119 187 191 FY -1.1
187 FY 0.6
191 FY 0.6
119 FY -0.6
115 FY -0.6
115 119 187 191 FX 0.1
LOAD COMB 101 COMBINATION LOAD CASE 1
1 1.0 2 1.0
LOAD COMB 102 COMBINATION LOAD CASE 2
1 1.0 3 1.0
LOAD COMB 103 COMBINATION LOAD CASE 3
1 1.0 4 1.0
LOAD COMB 104 COMBINATION LOAD CASE 4
1 1.0 5 1.0
LOAD COMB 105 COMBINATION LOAD CASE 5
1 1.0 6 1.0
PERFORM ANALYSIS
FINISH

E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.STD


31 October 2023 14:38

PAGE NO. 1

****************************************************
* *
* STAAD.Pro CONNECT Edition *
* Version 22.12.00.142 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 6, 2023 *
* Time= 16:21:16 *
* *
* Licensed to: Amara Raja Infra Pvt Ltd *
****************************************************

1. STAAD SPACE IDT FOUNDATION


INPUT FILE: E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NI.. .STD
2. START JOB INFORMATION
3. ENGINEER DATE 06/11/2023
4. JOB NAME ANALYSIS
5. JOB CLIENT SERENTICA
6. JOB REV 01
7. CHECKER DATE 06/11/2023
8. APPROVED DATE 06/11/2023
9. END JOB INFORMATION
10. INPUT WIDTH 79
11. UNIT METER KN
12. JOINT COORDINATES
13. 88 1.69262 -1.22575 1.54275; 89 1.69262 -1.22575 1.34113
14. 90 1.69263 -1.22575 1.1415; 91 1.69262 -1.22575 0.941875
15. 92 1.69262 -1.22575 0.74225; 97 1.69262 -0.9505 1.54275
16. 98 1.69263 -0.9505 1.34113; 99 1.69262 -0.9505 1.1415
17. 100 1.69262 -0.9505 0.941875; 101 1.69263 -0.9505 0.74225
18. 106 1.69263 -0.67525 1.54275; 107 1.69262 -0.67525 1.34113
19. 108 1.69262 -0.67525 1.1415; 109 1.69263 -0.67525 0.941875
20. 110 1.69263 -0.67525 0.74225; 115 1.69262 -0.4 1.54275
21. 116 1.69262 -0.4 1.34113; 117 1.69263 -0.4 1.1415; 118 1.69262 -0.4 0.941875
22. 119 1.69262 -0.4 0.74225; 160 0.542376 -1.22575 0.74225
23. 161 0.542376 -1.22575 0.941875; 162 0.542376 -1.22575 1.1415
24. 163 0.542376 -1.22575 1.34113; 164 0.542376 -1.22575 1.54275
25. 169 0.542376 -0.9505 0.74225; 170 0.542376 -0.9505 0.941875
26. 171 0.542376 -0.9505 1.1415; 172 0.542376 -0.9505 1.34113
27. 173 0.542376 -0.9505 1.54275; 178 0.542376 -0.67525 0.74225
28. 179 0.542376 -0.67525 0.941875; 180 0.542376 -0.67525 1.1415
29. 181 0.542376 -0.67525 1.34113; 182 0.542376 -0.67525 1.54275
30. 187 0.542376 -0.4 0.74225; 188 0.542376 -0.4 0.941875
31. 189 0.542376 -0.4 1.1415; 190 0.542376 -0.4 1.34113; 191 0.542376 -0.4 1.54275
32. 245 2.01738 -1.5 1.71413; 247 2.01738 -1.5 0.570874; 254 0.217631 -1.5 1.71413
33. 256 0.217631 -1.5 0.571474; 335 1.36762 -1.5 1.71375; 336 1.368 -1.5 1.42813
34. 337 1.36762 -1.5 1.1425; 338 1.368 -1.5 0.856875; 339 1.36763 -1.5 0.57125
35. 354 1.11762 -1.5 1.71375; 355 1.11763 -1.5 1.42813; 356 1.11762 -1.5 1.1425
36. 357 1.11763 -1.5 0.856875; 358 1.11763 -1.5 0.57125; 367 0.867618 -1.5 1.71375
37. 368 0.867629 -1.5 1.42813; 369 0.867618 -1.5 1.1425
38. 370 0.867629 -1.5 0.856875; 371 0.867629 -1.5 0.57125

E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.anl


31 October 2023 14:38

IDT FOUNDATION -- PAGE NO. 2

39. 387 0.217628 -1.5 1.42813; 388 0.217617 -1.5 1.1425


40. 389 0.218001 -1.5 0.856875; 465 2.01763 -1.5 1.42813; 466 2.01762 -1.5 1.1425
41. 467 2.01763 -1.5 0.856875; 527 1.69238 -1.5 1.71413; 528 1.69238 -1.5 0.570874
42. 530 1.69263 -1.5 1.42813; 531 1.69262 -1.5 1.1425; 532 1.69263 -1.5 0.856875
43. 534 0.542631 -1.5 1.71413; 535 0.542631 -1.5 0.571474
44. 537 0.542628 -1.5 1.42813; 538 0.542617 -1.5 1.1425
45. 539 0.543001 -1.5 0.856875; 541 0.542376 -1.5 1.54275
46. 542 0.542376 -1.5 1.34113; 544 0.542376 -1.5 0.941875
47. 545 0.542376 -1.5 0.74225; 546 1.69262 -1.5 1.54275; 547 1.69263 -1.5 1.34113
48. 549 1.69263 -1.5 0.941875; 550 1.69263 -1.5 0.74225
49. ELEMENT INCIDENCES SHELL
50. 78 88 89 98 97; 79 89 90 99 98; 80 90 91 100 99; 81 91 92 101 100
51. 86 97 98 107 106; 87 98 99 108 107; 88 99 100 109 108; 89 100 101 110 109
52. 94 106 107 116 115; 95 107 108 117 116; 96 108 109 118 117; 97 109 110 119 118
53. 123 357 356 369 370; 124 356 355 368 369; 131 355 354 367 368
54. 132 358 357 370 371; 143 160 161 170 169; 144 161 162 171 170
55. 145 162 163 172 171; 146 163 164 173 172; 151 169 170 179 178
56. 152 170 171 180 179; 153 171 172 181 180; 154 172 173 182 181
57. 159 178 179 188 187; 160 179 180 189 188; 161 180 181 190 189
58. 162 181 182 191 190; 165 338 337 356 357; 172 337 336 355 356
59. 173 336 335 354 355; 180 339 338 357 358; 181 256 535 545; 182 256 545 539 389
60. 183 389 539 544; 184 389 544 538 388; 185 388 538 542; 186 388 542 537 387
61. 187 387 537 541; 188 387 541 534 254; 189 535 371 370 545; 190 545 370 539
62. 191 539 370 369 544; 192 544 369 538; 193 538 369 368 542; 194 542 368 537
63. 195 537 368 367 541; 196 541 367 534; 197 339 528 550; 198 339 550 532 338
64. 199 338 532 549; 200 338 549 531 337; 201 337 531 547 336; 202 336 547 530
65. 203 336 530 546 335; 204 335 546 527; 205 528 247 467 550; 206 550 467 532
66. 207 532 467 466 549; 208 549 466 465 531; 209 531 465 547; 210 547 465 530
67. 211 530 465 546; 212 546 465 245 527; 215 162 544 538; 216 163 162 538 542
68. 220 92 91 532 550; 221 91 90 549 532; 225 88 546 530; 226 89 547 531
69. 227 89 88 530 547; 228 549 90 531; 229 531 90 89; 230 537 541 164
70. 231 542 537 163; 232 163 537 164; 233 161 539 544 162; 234 160 545 539 161
71. START GROUP DEFINITION
72. GEOMETRY
73. _WALLR.F 78 TO 81 86 TO 89 94 TO 97 143 TO 146 151 TO 154 159 TO 162 215 216 -
74. 220 221 225 TO 234
75. JOINT
76. _SUPPORT 245 247 254 256 335 TO 339 354 TO 358 367 TO 371 387 TO 389 -
77. 465 TO 467 527 528 530 TO 532 534 535 537 TO 539
78. ELEMENT
79. _RAFT 123 124 131 132 165 172 173 180 TO 212
80. END GROUP DEFINITION
81. ELEMENT PROPERTY
82. 78 TO 81 86 TO 89 94 TO 97 143 TO 146 151 TO 154 159 TO 162 215 216 220 221 -
83. 225 TO 234 THICKNESS 0.35
84. 123 124 131 132 165 172 173 180 TO 212 THICKNESS 0.15
85. DEFINE MATERIAL START
86. ISOTROPIC CONCRETE
87. E 2.17185E+07
88. POISSON 0.17
89. DENSITY 23.5616
90. ALPHA 1E-05
91. DAMP 0.05
92. TYPE CONCRETE
93. STRENGTH FCU 27579
94. END DEFINE MATERIAL

E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.anl


31 October 2023 14:38

IDT FOUNDATION -- PAGE NO. 3

95. CONSTANTS
96. MATERIAL CONCRETE ALL
97. SUPPORTS
98. 245 247 254 256 335 TO 339 354 TO 358 367 TO 371 387 TO 389 465 TO 467 527 -
99. 528 530 TO 532 534 535 537 TO 539 ELASTIC MAT DIRECT Y SUBGRADE 6708 PRINT
**WARNING-CHECK INFLUENCE AREAS FOR ZERO OR LARGE AREAS.

JOINT INFLUENCE AREA


----- --------------

245 0.023258
247 0.023258
254 0.026468
256 0.021369
335 0.000025
336 0.082131
337 0.082104
338 0.082131
339 0.000023
354 0.000001
355 0.071459
356 0.071407
357 0.071459
358 0.000000
367 0.000028
368 0.082117
369 0.082119
370 0.082064
371 0.000014
387 0.000002
388 0.045456
389 0.000108
465 0.052185
466 0.000003
467 0.046505
527 0.052873
528 0.050900
530 0.092837
531 0.092829
532 0.092836
534 0.047446
535 0.000068
537 0.092890
538 0.092829
539 0.092739
TOTAL 1.653944
100. LOAD 1 LOADTYPE DEAD TITLE DEAD LOAD
101. SELFWEIGHT Y -1
102. ELEMENT LOAD
103. 123 124 131 132 165 172 173 180 TO 212 PR GY -4.41
104. 94 TO 97 TRAP Y -0.9 -0.45
105. 86 TO 89 TRAP Y -1.35 -0.9
106. 78 TO 81 TRAP Y -1.8 -1.35
107. 220 221 225 TO 229 TRAP Y -2.25 -1.8
108. 159 TO 162 TRAP Y -0.9 -0.45
109. 151 TO 154 TRAP Y -1.35 -0.9

E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.anl


31 October 2023 14:38

IDT FOUNDATION -- PAGE NO. 4

110. 143 TO 146 TRAP Y -1.8 -1.35


111. 215 216 230 TO 234 TRAP Y -2.25 -1.8
112. LOAD 2 LOADTYPE NONE TITLE LOAD CASE 1
113. JOINT LOAD
114. 115 119 187 191 FY -1.1
115. 187 FY 1
116. 191 FY 1
117. 119 FY -1.
118. 115 FY -1.
119. 115 119 187 191 FZ 0.5
120. LOAD 3 LOADTYPE NONE TITLE LOAD CASE 2
121. JOINT LOAD
122. 115 119 187 191 FY -1.1
123. 187 FY 0.9
124. 191 FY 0.9
125. 119 FY -0.9
126. 115 FY -0.9
127. 115 119 187 191 FZ 0.2
128. LOAD 4 LOADTYPE NONE TITLE LOAD CASE 3
129. JOINT LOAD
130. 115 119 187 191 FY -1.1
131. 187 FY 1.1
132. 191 FY 1.1
133. 119 FY -1.1
134. 115 FY -1.1
135. 115 119 187 191 FZ 0.4
136. 187 FY 0.7
137. 191 FY -0.7
138. 119 FY 0.7
139. 115 FY -0.7
140. 115 119 187 191 FX 0.1
141. LOAD 5 LOADTYPE NONE TITLE LOAD CASE 4
142. JOINT LOAD
143. 115 119 187 191 FY -1.1
144. 187 FY 0.3
145. 191 FY 0.3
146. 119 FY -0.3
147. 115 FY -0.3
148. 115 119 187 191 FZ 0.1
149. LOAD 6 LOADTYPE NONE TITLE LOAD CASE 5
150. JOINT LOAD
151. 115 119 187 191 FY -1.1
152. 187 FY 0.6
153. 191 FY 0.6
154. 119 FY -0.6
155. 115 FY -0.6
156. 115 119 187 191 FX 0.1
157. LOAD COMB 101 COMBINATION LOAD CASE 1
158. 1 1.0 2 1.0
159. LOAD COMB 102 COMBINATION LOAD CASE 2
160. 1 1.0 3 1.0
161. LOAD COMB 103 COMBINATION LOAD CASE 3
162. 1 1.0 4 1.0
163. LOAD COMB 104 COMBINATION LOAD CASE 4
164. 1 1.0 5 1.0
165. LOAD COMB 105 COMBINATION LOAD CASE 5

E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.anl


31 October 2023 14:38

IDT FOUNDATION -- PAGE NO. 5

166. 1 1.0 6 1.0


167. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS 83 NUMBER OF MEMBERS 0


NUMBER OF PLATES 78 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 28

Using 64-bit analysis engine.

SOLVER USED IS THE IN-CORE ADVANCED MATH SOLVER

TOTAL PRIMARY LOAD CASES = 6, TOTAL DEGREES OF FREEDOM = 414


TOTAL LOAD COMBINATION CASES = 5 SO FAR.

168. FINISH

E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.anl


31 October 2023 14:38

IDT FOUNDATION -- PAGE NO. 6

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= NOV 6,2023 TIME= 16:21:16 ****

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://www.bentley.com/en/support/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************

E:\Viswanadh\Serentica - Sterlite\Nifps Foundation Details\NIFPS Foundation - Serentica\NIFPS - Foundation - Serentica.anl


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

M M

L L

K K

R1
F

J J

R1

R1
I I

R1

R1
H

E E
REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE
SG02KS-AIPL-PVP-CIV-DBR-035 INVERTER DUTY TRANSFORMER GA AND DATASHEET
SG02KS-AIPL-PVP-ELE-DTS-006 NIFPS - Inverter Duty Transformer - GTP, GA, Schematic Diagrams

D D
R1
R1 08-11-2023 FOR_APPROVAL NSK PKA APPD
R0 10-09-2023 FOR_APPROVAL NSK PKA APPD
REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I APPD.
STAMP:

SPACE FOR STAMPING


C

R1
10Ø HOLD LUST
B
CLIENT : serentica SERENTICA RENEWABLES INDIA 3 PVT LTD B
INSERT PLATE (IP100X100X10) 290 MWp / 200 MW SOLAR PV PLANT AT GADAG
PROJECT :
KARNATAKA
OWNER'S
ENGINEER: L & T - SARGENT & LUNDY LTD.
EPC
CONTRACTOR: M/S. AMARA RAJA INFRA PVT LTD.
DATE NAME TITLE:
DRAWN 08-NOV-23 NSK
A CHECKED 08-NOV-23 PKA/RGK
OIL SUMP PIT DETAILS & NIFPS A
R1
R1 R1 APPROVED 08-NOV-23 RVR FOUNDATION DETAILS
DEPARTMENT CIV

A0 (1189mm x 841mm)
R1 SCALE : NTS

DRG. NO.: SG02KS-AIPL-PVP-CIV-DWG-038 SHT: 01 OF 01 REV. R1


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1