You are on page 1of 17

1|Page

YARD MANAGEMENT

Build a connection between the Warehouse door & Yard

SIBANANDA PATTANAYAK
2|Page

Step-1-: Activate the shipping & receiving for Warehouse

Step-2-: Will activate the Yard BC sets by SCPR20 T-code

Will activate all.

Step-: 2.1 BC set- ACTIVE YARD MANAGEMENT

 Activate the BC set


 Enter your WH number & Copy the value

SIBANANDA PATTANAYAK
3|Page

 Activation successfully completed

Then go to the Log

Check the same cross processing setting

Cross Process setting-> Shipping & Receiving-> Yard Management-> Activate Yard Management for
Warehouse

SIBANANDA PATTANAYAK
4|Page

Step-2.2-: Activate this BC set /SCWM/YARD_STOR_TYPE YARD Storage Type - General

 Enter your WH number & Copy the value


 Activation successfully completed
 Then go to the Log
 Check the same in YARD Storage type was created

Step-2.3 Active BC Set

/SCWM/YARD_STOR_SECTION Yard Management - Storage Section

 Enter your WH number & Copy the value


 Activation successfully completed
 Then go to the Log
 Check the same in YARD Storage sections were copied from WHN_0001

SIBANANDA PATTANAYAK
5|Page

Step-2.4 Activate BC Set /SCWM/YARD_STRUCTURE Yard Management - Structure Yard

Step-2.5 Activate BC Set /SCWM/YARD_CHECKPOINTS Checkpoints

Step-3-: Will create bins LS01 for all Sections

Step-4-: Will create Doors in master data

Step-5-: Set the Door Business attributes to the SCU

Step-6-: Will connect the doors & Door Bins.

/SCWM/DOOR_SCU - Assign Door Storage Bin and Supply Chain Unit

Easy Access-> Master data-> Shipping and Receiving->

SIBANANDA PATTANAYAK
6|Page

Step-7-: /SCWM/YM_DOOR_BIN - Assign Warehouse Door to Yard Bin

Easy Access-> Master data-> Shipping and Receiving->

Step-8-: /SCWM/YM_CHKPT_BIN - Assign Checkpoint to Yard Bin and SCU

9999 WPT is the standard

SIBANANDA PATTANAYAK
7|Page

Step-9-: Define packaging Materials

ECC-> SPRO-> Logistics General-> HU Management-> Basics-> Define packaging Material Type.

Define packaging group

Assign each other.

MTR- Means of transport

Same needs to repeat in EWM

Step-10-: Maintain Means of Transport

Std Code – 031

Transportation Mode-: Road

SIBANANDA PATTANAYAK
8|Page

Step-11-: Will create a packaging material by MM01 with packaging material & Group for TU. And Core
Interface to EWM Server.

Packaging Material name V-Truck

Step-12-: Define Control Parameters for Forming Vehicles/Transportation Units

Step-13-: We need to assign the packaging material with Means of Transport

/SCWM/PM_MTR - Link between Packaging Material (TU) and Means of Transport

SIBANANDA PATTANAYAK
9|Page

Step-14-: /SCWM/TU - Process Transportation Unit

Don’t save

Step-15 Will create one inbound delivery

Step-16-: /SCWM/CICO for check in check out

SIBANANDA PATTANAYAK
10 | P a g e

Then go to /SCWM/TU - Process Transportation Unit

To check the status

SIBANANDA PATTANAYAK
11 | P a g e

Step-16-: Now we need to move the TU to Parking Area (Yard Internal Movement)

/SCWM/YMOVE

WO will create.

Go to Monitor & confirm the task

Step-17-: Now need to move Parking area to Door /SCWM/YMOVE

SIBANANDA PATTANAYAK
12 | P a g e

Same WO will create

Go to Monitor & confirm the task

Step-18-: Now need to assign the Inbound Delivery to the TU. /SCWM/TU

Save it

SIBANANDA PATTANAYAK
13 | P a g e

Door has been automatically assigned

Save & Create Unloading WT & Save

Step-19-: Will go the Monitor check the WT by Inbound delivery document

Door to GR Area

Confirm the WT it will finish the unloading

Check the status

SIBANANDA PATTANAYAK
14 | P a g e

Step-20-: Now moving the TU to Check out point. You can move to parking also. /SCWM/YMOVE

Same WO will create

Go to Monitor & confirm the task

Step-21-: My Truck moved to the Check Out point. Now will mark OUT from System.

/SCWM/CICO for check in/check out

SIBANANDA PATTANAYAK
15 | P a g e

 For finding the TU in Monitor. Use this node.

How to create Vehicle


Step-1-: Cross-Process Settings-> Shipping and Receiving-> General Settings->

Define Control Parameters for Forming Vehicles/Transportation Units

SIBANANDA PATTANAYAK
16 | P a g e

Step-2-: Easy Access-> Master data->Shipping and Receiving -> /SCWM/VEH - Process Vehicle

Save it

Creating One TU and assign to the vehicle.

Step-3-: /SCWM/TU

2 TU Created

SIBANANDA PATTANAYAK
17 | P a g e

Step-4-: One TU and assign to the vehicle. /SCWM/VEH - Process Vehicle

SIBANANDA PATTANAYAK

You might also like