MAINTENANCE OF CONDENSER Online / Offline NORMAL - ROUTINE / NON-ROUTINE
TITLE
ACTIVITIES
VER. NO : 02 REV. NO : 03 PAGE 1-1 Date:30/08/2021
Residual Risk
Hazard Identification Existing Risk Assessment
Assessment
Refer SOP/WI
Risk Score= S*P
POTENTI S/
Risk level
Risk level
Existing Existing BC Subsitution, Engg, Sign/Admin &
ALLY NS
Activity Hazard Potential Control PPE)/Opportunities
S
P
P
EXPOSE
harm Measures
D
(E/C/V/L
C)
Cut with Injury to WPS, TRG, ATC, Adeq Proper PPEs to be worn, cut ressistant gloves Adequ
3.7 E/C 3 2 4 8 NS 2 3 6
sharp object body parts PPE uate to be worn, supervision to be maintained ate
Installation of
gags for
condenser
30mA ELCB to be ensure, VRD to be used,
spring support Eye
proper PPEs to be worn, supervision to be
exposure to Irritation Adeq Adequ
3.8 E/C WPS, PPE, TRG 3 2 4 8 NS maintained, fire blanket to be ensure, fire 2 3 6
welding to eyes uate ate
extinguisher to kept on site, ensure welding
spark
checklist.
Condenser Tube 3.1 Contact with Burn WPS, PPE, AWS, Subst Ensure proper PPEs, supervision to be Adequ
E/C 3 3 4 12 S 3 3 9
plugging 2 hot surface injury TRG antial maintained, TBT to be given and followed ate
High
TBT to be given, Confined space suit to be
3.1 velocity Injury to WPS, TRG, ATC, Adeq Adequ
E/C 4 3 3 9 NS worn, ensure proper PPEs, supervison to be 3 3 9
4 water spray body parts PPE uate ate
mainatined
on body
Bullet
GI sheet to be installed at the CEP side of
hitting while
3.1 Injury to WPS, TRG, ATC, Adeq condenser water box, oulet to be barricaded by Adequ
exit from E/C 4 3 3 9 NS 3 3 9
Bullet/ Water jet 5 body parts PPE uate signage boards, supervison to be maintained at ate
the outlet
cleaning all times
side
WI-POM/MMD/TBN/03 ; WI-POM/MMD/COM/05
system 7 body parts ATC, PPE antial proper oxygen (19.5-23.5) & co level, ensure ate
space
24V DC bulb supply. Gas test to be done in
each shift renewal.
Entangleme
Esnure proper electrical islocation & LOTO,
3.2 nt with Injury to WPS, TRG, AWS, Adeq Adequ
E/C 2 3 3 9 NS proper PPEs, supervision to be maintained, 3 3 9
8 rotating body parts PPE uate ate
ensure machine guarding while running
parts
3.2 Pump Injury to WPS, TRG, AWS, Adeq TBT to be followed, ensure proper PPEs, Adequ
E/C 3 2 3 6 NS 2 3 6
9 inspection body parts PPE uate certified tools & tackles only to be used ate
Contact with
LP cylinder cut resistant gloves to be worn which are in
3.3 sharp injury to WPS, AWS, PPE, Adequ
spray nozzle E/C 3 3 4 12Adequate S good condition, tool box talk to be followed, 3 3 9
5 edges / body parts TRG ate
inspection supervision to be maintained
objects
3.3 Awkard injury to WPS, AWS, PPE, Ensure TBT, supervisior to be present at site, Adequ
E/C 2 2 4 8Adequate NS 2 3 6
6 access body parts TRG proper access to be ensured ate
Entangleme
Coupling guards to be installed.ensure LOTO
Chemical 3.3 nt with Injury to Subst Adequ
E/C WPS, AWS, TRG 4 4 3 12 S ,Area to be isolated and baricaded, supervsion 3 3 9
cleaning 8 rotating body parts antial ate
to be maintained, ensure proper PPEs
parts
Steam
leakages Welding joints must be strengthened. Isolation
3.3 Injury to WPS, AWS, TRG, Subst Adequ
from aux. E/C 4 3 4 12 S valves operation to be ensured, proper PPEs to 2 3 6
9 body parts EGC antial ate
steam pipe be worn
lines
Chemical
spillage MSDS must be ensured. Competent person to
irritaion to
from the be supervise the job.all punch points before
Chemical 3.4 body parts Subst Adequ
condenser, E/C WPS, TRG, AWS 4 4 3 12 S the trail to be complied, first aid box should be 3 3 9
cleaning 0 i.e.Chemic antial ate
mixing tank present on site, ensure proper PPEs with
al burns
and shield or goggles
pipelines.
Adequate lighting & Proper supervison, TBT
Dummy Plate Fall of man Subst to be given , life line to be installed if
3.4 Injury to WPS, AWS, TRG, Adequ
installation in and material E/C 4 4 3 12 antial S requried, safety belt to be used, proper 3 3 9
1 body parts ATC, PPE ate
Inlet outlet pipes inside Pipe Risk PPEsmust be ensured..Proper platform or
tempeorary scaffolding to be installing.
Exposure to
heat while Ensure the regulators of gas cylinders are in
Dummy Plate
3.4 cutting & Injury to WPS, AWS, TRG, Adeq working condition. Ensure proper PPEs, gas Adequ
installation in E/C 4 3 3 9 NS 3 3 9
2 contact with body parts ATC, PPE uate cylinder checklist should be ate
Inlet outlet pipes
sharp updated,calibrated done of gas cylinder guage.
objects
Contact with
3.4 hot surface Injury to WPS, AWS, TRG, Adeq Adequate lighting, proper supervison, TBT to Adequ
E/C 4 3 3 9 NS 3 3 9
3 during body parts ATC, PPE uate be followed ate
welding
Dummy Plate
installation in
Ensure confined space register, stand-by
Inlet outlet pipes
person & confined pass, confined space work
Working in
3.4 Injury to WPS, TRG, ATC, Subst permit, ensure blower/ air piepline,ensure Adequ
Confined E/C 3 4 3 12 S 3 3 9
4 body parts PPE antial proper oxygen (19.5-23.5) & co level, ensure ate
space
24V DC bulb supply.Gas test to be done in
each shift renewal.
Exposure to
heat while Ensure the regulators of gas cylinders are in
Condenser 3.4 cutting & Injury to WPS, AWS, TRG, Adeq working condition, esnure proper PPEs, Adequ
cooling water 6 contact with body parts E/C 4 3 3 9 NS 3 3 9
ATC, PPE uate oxygen & co level to be checked in every 2 ate
pipe line sharp hrs, fire extinguisher to be kept on site
inspection objects
Exposure to
heat while TBT to be followed, Blowers/ air pipelines
LPH 7 Cladding
3.5 cutting & Injury to WPS, AWS, TRG, Adeq must be installed for proper ventilation to Adequ
sheet inspection E/C 4 3 3 9 NS 3 3 9
0 contact with body parts ATC, PPE uate carryout the job, ensure proper PPEs, 30mA to ate
& Repair
sharp be used
objects
Adequate lighting & Proper supervison,
Contact with esnure VRD, 30mA ELCB to be used, ensure
3.5 hot surface Injury to WPS, AWS, TRG, Adeq proper PPEs, fire extinguisher to be kept on Adequ
E/C 4 3 3 9 NS 3 3 9
1 during body parts ATC, PPE uate site, ensure welding checklist & fire blanket to ate
welding. be kept on site, fire extinguisher to kept on
LPH 7 Cladding site
sheet inspection
& Repair Ensure confined space register, stand-by
person & confined pass, confined space work
Working in
3.5 Injury to WPS, TRG, Subst permit, ensure blower/ air piepline,ensure Adequ
Confined E/C 3 4 3 12 S 3 3 9
2 body parts ATC, PPE antial proper oxygen (19.5-23.5) & co level, ensure ate
space
24V DC bulb supply. Gas test to be done in
each shift renewal.
Contact with
TBT to be followed, ensure proper PPEs,
Inspection of air 3.5 sharp injury to WPS,AWS,PPE, Subst Adequ
ingress/ leakage 6 E/C 3 3 4 12 S supervision to be maintained, cut resistant 2 3 6
edges / body parts TRG antial ate
hand gloves to be used
in turbine objects
bearing
pedestals
glands , pipe
line flanges,
valves, welded
3.5 Contact with injury to WPS,AWS,PPE, Subst TBT to be followed, ensure proper PPEs, Adequ
joints, condenser E/C 3 3 4 12 S 3 3 9
7 hot surface body parts TRG antial supervision to be maintained ate