SITE DAILY REPORT DCBWSP

DAVAO CITY BULK WATER SUPPLY PROJECT


08 August 2023 Davao City, Philippines
WITCO Construction & Development Corp. Working/Shift Hours: 0600H to 1500H
Prepared by: Sherkin Torres Extended Hours: 1500H to 2100H

Work Location – Area / Section: Weather Condition:


TWP- AL 4B Dry – Dayshift 600 to 2100

Site Engineer/Supervisor: Site Condition:


Sherkin Torres & Ariel Aroyo Workable – Dayshift 600 to 2100

Receipt of SOR/NCR: Issued WIR:


NONE

Site Deliveries:

Key Issues and Concerns:

Work Activities, Manpower & Equipment:

Site Supervisor Skilled Tools & Equipment &


Area Work Activity Labor Manpower
(Foreman /Leadman) Manpower Quantity

• AL 4-Sta. 7+233 • Cleaning inside pipes of S. Torres (Supervisor) 3-Painter 13-Helper 1-Genset 25KVA LKPH7045
AL4-Sta. 7+233 A. Aroyo(Supervisor) 1-Gas Tester 3/5-Ventilation& Lights
• Manual Dewatering in R. Edgar (Foreman 1-First Aider 1-Submersible Pump
AL4-Sta. 7+233 2-Watchman 1-Pressure Washer
• Dewatering in AL4-Sta. 2-Watchman 1-6Wheeler Labor Haul
7+233 (Nightshift) (1230-120440)
1-6Wheeler Boom Truck
(RME 706)

• AL4-Sta. 8+890 • Cleaning inside pipes of R. Deloso (Safety Lead) 12-Helper 1-Genset 32KVA LKPH7021
AL4-Sta. 8+890 A. Gabe (Safety Officer) 1-Gas Tester 2/10-Ventilation& Lights
R. Engco (Safety Officer) 1-First Aider 1-Pressure Washer
D. Derano (Safety Officer) 1-Watchman 1-6Wheeler Labor Haul
2-Watchman (MAE 4987)
(Nightshift)

TOTAL 7 3 36

Prepared By: Prepared By: Validated By:

SHERKIN TORRES ARIEL AROYO ROY ESPINOSA


WITCO SUPERVISOR WITCO SUPERVISOR AAII PAINTING INSPECTOR
DATE: 08/08/2023 DATE: 08/08/2023 DATE:

Rev. 9– 22 June 2021 1


SITE DAILY REPORT DCBWSP
DAVAO CITY BULK WATER SUPPLY PROJECT
08 August 2023 Davao City, Philippines
WITCO Construction & Development Corp. Working/Shift Hours: 0600H to 1500H
Prepared by: Sherkin Torres Extended Hours: 1500H to 2100H

Photo

August 8, 2023 06:04

• Set up and preparation of work area at AL4-Sta.


7+233 • Cleaning inside pipes of AL4-Sta. 7+233

Photo Photo

• Cleaning inside pipes of AL4-Sta. 7+233 • Manual Dewatering in AL4-Sta. 7+233

Photo Photo

August 8, 2023 20:43

• Manual Dewatering in AL4-Sta. 7+233 • Dewatering in AL4-Sta. 7+233

Rev. 9– 22 June 2021 2


SITE DAILY REPORT DCBWSP
DAVAO CITY BULK WATER SUPPLY PROJECT
08 August 2023 Davao City, Philippines
WITCO Construction & Development Corp. Working/Shift Hours: 0600H to 1500H
Prepared by: Sherkin Torres Extended Hours: 1500H to 2100H

Photo

• AL 4-Sta. 7+233: Genset 25KVA LKPH7045 • AL 4-Sta. 7+233: Genset 25KVA LKPH7045

Photo Photo

• AL 4-Sta. 7+233: Genset 25KVA LKPH7045 • 6Wheeler Boom Truck: RME 706

Photo Photo

August 8, 2023 21:07 August 8, 2023 05:57

• 6Wheeler Boom Truck: RME 706 • 6Wheeler Labor Haul: 1230-120440

Rev. 9– 22 June 2021 3


SITE DAILY REPORT DCBWSP
DAVAO CITY BULK WATER SUPPLY PROJECT
08 August 2023 Davao City, Philippines
WITCO Construction & Development Corp. Working/Shift Hours: 0600H to 1500H
Prepared by: Sherkin Torres Extended Hours: 1500H to 2100H

Photo

August 8, 2023 21:06

• 6Wheeler Labor Haul: 1230-120440 • Cleaning inside pipes of AL4-Sta. 8+890

Photo Photo

• Cleaning inside pipes of AL4-Sta. 8+890 • Cleaning inside pipes of AL4-Sta. 8+890

Photo Photo

Aug 8, 2023 6:35:41 AM

• Cleaning inside pipes of AL4-Sta. 8+890 • AL4-Sta. 8+890: Genset 32KVA LKPH7021

Rev. 9– 22 June 2021 4


SITE DAILY REPORT DCBWSP
DAVAO CITY BULK WATER SUPPLY PROJECT
08 August 2023 Davao City, Philippines
WITCO Construction & Development Corp. Working/Shift Hours: 0600H to 1500H
Prepared by: Sherkin Torres Extended Hours: 1500H to 2100H

Photo

• AL4-Sta. 8+890: Genset 32KVA LKPH7021 • AL4-Sta. 8+890: Genset 32KVA LKPH7021

Photo Photo

• 6Wheeler Labor Haul: MAE 4987 • 6Wheeler Labor Haul: MAE 4987

Photo Photo

Rev. 9– 22 June 2021 5