1 Scope............................................................. 2
2 Conflicts and Deviations................................. 2
3 References..................................................... 2
4 Definitions....................................................... 3
5 General........................................................... 3
6 Service Conditions......................................... 4
7 Construction Features.................................... 4
8 Shipping......................................................... 7
Previous Issue: 2 May 2012 Next Planned Update: 05 May 2020 Page 1 of 7
Contact: Cox, Robert Lee
©Saudi Aramco 2017. All rights reserved.
Document Responsibility: Electric Submersible Pump Standards Committee 55-SAMSS-001
Issue Date: 05 May 2017
Next Planned Update: 05 May 2020 ESP Controller Skid - Outdoors
1 Scope
This specification defines the mandatory requirements for a non-site fabricated skid
assembly containing all necessary equipment to power and control a single electrical
submersible pump (ESP) in crude oil service. The skid shall be installed outdoors in an
offshore or onshore environment.
If there are any conflicts between this specification and associated purchasing, project
or engineering documents, this specification shall take precedence.
Direct all requests to deviate from this specification in writing to the company or buyer
representative, who shall follow internal company waiver procedure SAEP-302.
3 References
The following is a summary of all the documents which have been mentioned within
this specification. Full compliance to these documents is not necessarily required.
Whether the entire document or specific part(s) of these documents are applicable, have
been identified throughout this specification.
Page 2 of 7
Document Responsibility: Electric Submersible Pump Standards Committee 55-SAMSS-001
Issue Date: 05 May 2017
Next Planned Update: 05 May 2020 ESP Controller Skid - Outdoors
4 Definitions
Crude Oil Service: Directly producing crude oil or producing water in support of
crude oil production.
Specification: The main body of this document. Does not include the information
contained within the appendices.
Stainless steel: Either 316 series or 317 series stainless steel material.
5 General
Page 3 of 7
Document Responsibility: Electric Submersible Pump Standards Committee 55-SAMSS-001
Issue Date: 05 May 2017
Next Planned Update: 05 May 2020 ESP Controller Skid - Outdoors
The specific location(s) and environment in which the skids will be installed
shall be specified within the purchasing documents.
6 Service Conditions
The skids shall be designed for the same service conditions as the controllers mounted
on the skids.
7 Construction Features
7.1 Skid
7.1.1 Steel design shall be in accordance with the AISC, “Manual of Steel
Construction” requirements.
Page 4 of 7
Document Responsibility: Electric Submersible Pump Standards Committee 55-SAMSS-001
Issue Date: 05 May 2017
Next Planned Update: 05 May 2020 ESP Controller Skid - Outdoors
7.1.7 Provision for grounding the skid structure shall be made at diagonally
opposite corners. The skid structure shall be designed to accommodate
two-hole compression connector at each corner. Exposed grounding
conductors shall be insulated. Insulation shall be green, or green with
yellow stripes. Exposed connections and terminations shall be
thoroughly covered with a suitable weather resistant compound for
protection from corrosion.
7.1.8 For onshore installations as well as offshore installations where the skid
is exposed to direct sunlight, a gable canopy shall be provided over the
skid. The canopy shall have the following characteristics:
7.1.9 For onshore installations, shall include integral drip tray(s) with a
capacity of 1.5 times the volume of the transformer oil contained in the
transformer(s) mounted on the skid. If a severe corrosive environment,
drip tray material shall be stainless steel.
7.2 Controller
7.3 Transformer
7.4 Electrical
Page 5 of 7
Document Responsibility: Electric Submersible Pump Standards Committee 55-SAMSS-001
Issue Date: 05 May 2017
Next Planned Update: 05 May 2020 ESP Controller Skid - Outdoors
7.4.3 All cables shall have a liquid tight non-metallic overall sheath.
7.4.4 All wiring outside of the enclosures on the skid shall be minimum 600 V
rated, 2.5 sq mm (14 AWG) stranded copper, installed in raceways or
cable trays.
7.4.5 All control and accessory wiring shall be identified with a slip-on
thermoplastic wire marker with permanently printed characters. Snap-on
and adhesive type markers are prohibited.
Page 6 of 7
Document Responsibility: Electric Submersible Pump Standards Committee 55-SAMSS-001
Issue Date: 05 May 2017
Next Planned Update: 05 May 2020 ESP Controller Skid - Outdoors
7.4.7.5 Shall be sized for termination of 5kV rated armored cable and
stress cone terminations.
7.5.3 Where dissimilar metals are in contact, the contact points shall be
suitably protected to prevent corrosion due to galvanic action.
7.6 Painting/Coating
8 Shipping
Skid shall be designed to be transported to, and installed at the site as one complete unit
without requiring field assembly. Lifting points shall be clearly labeled.
Exception:
Revision Summary
26 April 2011 New
02 May 2012 Editorial: changed the primary contact
05 May 2017 Minor revision to clarify onshore and offshore requirements
Page 7 of 7