Elec
ctrica
al ParttInsta
allatio
onMannual
PROJE
ECT S
S202 0072 23-022CL
PREPARRED CH
HECKED APPROVED DATE
Stev
ve Billy CRRF 09
9/18/2020
0
CO
ONFIDENTIAL FOR
F POWERW
WAY CUSTOME
ERS
RE
EVISIO
ON HIISTOR
RY
09/18/20
020 A CR
RF
DATEE DESC
CRIPTION No. B
BY
1.C
Control Box
B Insttallation
n
Figu
ure 1.1 Con
ntrol Box an
nd Connec
ctors
Figure 1.2
2 Control Box
B Install on
o the Norrth Wing Figure 1.3
3 Control B
Box and Connectors
s
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 2
WARNING
G
Connectoor of Control
Box mustt face south
2 Hoop
2x
H8=192mm
m
F
Figure 1.5 Control Bo
ox Installed
d
1.2
2 Controll Box Zig
gBee Wirreless An
ntenna Placeme
P nt
WAR
RNING
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 3
1. ZigB
Bee Wirelesss Antenna is pre-assembled on th he Control Box,
2. Ensuure the cablle do not Interfere witth any mech
hanical or sstructural co
omponentss
throu
ughout the entire rang ge of movem
ment.
Figu
ure 1.6Conttrol Box ZigBee Wire
eless Anten
nna Placem
ment
1.3
3 Install Commun
C nication System
CAUUTION
1. Poweerway doess not providde the installlation base
e of the Metteorological Column.
Pleasse refer to Constructio
C on Drawing for the infoormation of the base.
2. The Communic cation Box iss Powered by Substation.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 4
Wind senso
or
The meteeorological 4x Hex bo
olt M12*45 4x Hex boltt M12*45
column A Torque 80-89[N-m] Torque
Figure 1.7 In
nstall Wea
ather Statio
on
WAR RNING
1. The wind
w speed d sensor cable shall be
e go throughh the Meteo
orological Column
C D
and go
g through from the cable hole on Meteorological Colu umn D.
2. Tigh
hten the scre
ews on Winnd Speed Sensor
S by Screw Driverr.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 5
The meteorologic
cal
column
nD
2x Com
mmunication Box
B Hoop
4x Hex
x bolt M6*20
2x M6 U-sshaped hoop
4x M6 large flat was
sher
ge flat washer
4x M6 larg
The wind
w sensor cable
c goes ou
ut 4x M6 spring washe er
4x M6 sprring washer
from this hole. Torque
e 6-10[N-m]
4x M6 nutt
An
ntenna
CommuniicationBox
The meteoro
ological
column A
Co
onnectors
muust face to
gro
ound
Fig
gure 1.8 Me
eteorologic
cal Mast and Commu
unication B
Box
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 6
2. Tracker
T r Electric
cal Systtem Wiriing and Ground
ding
The
e Powerwayy Tracker re
equire powe
er at the Sle
ewing Drive
e, Control Box and com
mmunication system.
2.2
2 Commu
unication
Box-type Substation
S and Comm munication Box
B is conn nected by RS485Wire
R ed Network k.
RS 485 Ca 2
able Speciffication: 2*11mm Shie elded Wire(Customers providee).
Communic cation Box and Contro ol Box is con
nnected by ZigBee Wireless
W Neetwork. Zig
gBee has been
b
embedde ed in Controol Box and Communica
C ation Box.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 7
Fig
gure2.1 Co
ommunicattion Box an
nd Control Box Netw
work
WAR RNING
Powerw waystronglyy recomme ends allowin ng only certtified electriicians to insstall
electric
cal compon nents.All wirring must be in accordance with sspecificatio ons
provideed in the insstallation Co onstructionn Drawing and
a inaccordance with h the
Nationaal Electric Codeand
C alll local code
es andregulations.
2.3
3 Power Line
WAR RNING
1. Conttrol Box is powered
p fro
om substatioon with high voltage. C
Certified ele
ectricians iss
required to instaall by followwing instruc
ction.
ng in Rainy or snowy day
2. Wirin d is prohib bited.
3. Hot line
l working g is prohibitted.
F
Figure 2.2 Project Po
ower Wiring
g Cable Sp
pecificatio
on
CAU
UTION
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 8
1. 2P(L
L+N) 30A Circuit
C Breakker is used for
f Control Box and Co
ommunicattion Box.
2. Electtrical Outlett is used for powering Remote Coontrol and M
Monitoring System
S
Seria
al Server
F
Figure 2.3 World
W Map
p of Electriical Plugs and
a Outletts
Fig
gure 2.4 Sa
ample of Circuit Brea
aker
2.3.2 Wiring
1. VERIFY the pow wer line fromm Substation is in off-p
position.
2. Insta
all Circuit Brreaker in the
e Substatio
on.
3. Insta
all Electrical Outlet in th
he Substation.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 9
4. Lay the powe er line fromm Substattion under each Com
mmunicatioon Box witth using T
Connnector.
5. The length of cable
c from T Connector to the Communica
C ation Box is site spec
cific. Please
e
reserrve long eno
ough cable e for connec
ction.
T Co
onnector S
Specificatiion
Lefft/Right Ca
able <=OD112.5mm
Ratted Voltagge 450VAAC
Ratted Currennt 32A
IP Class
C IP68
Woork Tempe erature -40°C~~+85°C
Caable Speciffication 0mm2
1.5~4.0
Fla
ame Retard dant UL94 V-0
V
Ap
pplication Outdoo
or
UL223
38/EN609998
Ce
ertification
/CQC 1107-2011
1
2.4
4 Self-po
owered Control
C B
Box
Wirees inside th
he Control Box
B are pre--assembly in the facto ory. There iss no need too open the Control Box to
perfform any caable connecction on site
e. All cable could be co
onnected onto
o the corrresponding
g ports on the
Conntrol Box.
WARRNING
1. ZigB
Bee Wirelesss Antenna is pre-assembled on th he Control Box.
2. Ensuure the cablle do not Interfere witth any mech
hanical or sstructural co
omponentss
throu
ughout the entire rang ge of movem
ment.
DC Geared
d Motor Co
omputer ZigBee Antenna PV Mo
odule Plugss
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 10
2.5
5 Contro
ol Box and Geared
d DC Mo
otor
Geared DC
G C Motor is powered fro
om the Conttrol Box. Le
ength of power cable ffrom Gear DC
D Motor iss
a
about 1.8m
m
WARNIN NG
E
Ensure the cables do not
n Interferre with anyy mechanica
al or structu
ural components
t
throughoutt the entire range
r of mo
ovement.
2.5
5.1 Power Requireme
R ent
Conntrol Box Poower Cable is providedd by Powerw way.
Geared DC Motor: Input: 26VDC, 0~8A;
-10 0°C~65° C.
2.5
5.2 Geared DC Motorr Wiring
Geaar DC Moto or Power Caable is proviided by Powwerway.
1. VERIFY the Conntrol Box is in
i off-positiion.
2. Plug Geared DCC Motor Cab ble into Gea
ared DC Mo otor, tighten the conneector.
3. Plug Geared DCC Motor Cable into Con ntrol Box MotorPort,
M t
tighten the connector.
4. Cable Ties mayy be necessary to fix th
he cables.
Figu
ure 2.5 Gea
ar DC Moto
or Power Cable
C
Figure
e2.6 Gear DC
D Motor Port
P and Control
C Box
x Motor 2P
Pin Port
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 11
2.6
6 Communicatio
on Box
Power Sw
witch
Com
mmunicatioon
Mod
de Switch
GPS
RS 485A
A
RS 485B
B
ZigBe
ee
Wind Sen
nsor
Powe
er Input
Figure2.7 Commun
nication Bo
ox PCB De
escription
WARNING G
1. Communication Box is powered d from Subsstation with h high voltag
ge. Certified
d
electrician
ns is requireed to install by followin
ng instructio
on.
2 Wiring in Rainy or snowy day is prohibited..
2.
3 Hot line working
3. w is prohibited.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 12
Commun nication
Box Poweer Cable T connecto or is not allo
owed to
e
embed in g
ground or below
b the
fllood level.
Live Powe
er
Neutral
Grounding
AC Powe
er AC Pow
wer
Figure
e2.8 T Con
nnector
Figure2.9 Tighten
n the Wires
s with Scre
ew Driver
Fig
gure 2.10 T Connecto
or Connec
ction with Communic
C cation Box Power Cable
2.6
6.3Commu unication Station
S Wiring
1. VERIIFY the Cab
ble is in off--position.
2. Conn
nect the Wiind Speed Sensor
S cable to Wind Speed
S Sensor, tighten
n the conne
ector.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 13
3.Plug Wind Spee ed Sensor Cable into o Geared Communica
C ation Box WWind Port, tighten the
e
conn
nector.
4. Plug Power Cabble into Com
mmunicatio on Box Pow werPort, tighten the co
onnector.
5. Cable Ties mayy be necessary to fix th
he cables.
Wireless
W Anttenna &
Wind Sensor R
RS485 Pow
wer Cable
GPS
Fiigure2.11 Wind
W Spee
ed Sensor Cable
C and Connecto
ors
2.7
7 Remote
e Contro
ol and Mo
onitoring
g System
m Serial Server
S
The
e Remote Control and Monitoring System Se
erial Server((Serial) is in
nstall in Sub
bstation.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 14
F
Figure 2.13
3 Remote Control
C and
d Monitoring System
m Serial Se
erver(Seria
al)
CAUUTION
1. RS4885 and RJ4 45 Cable arre provided by Installattion Team.
2. Insta
allation Team Shall proovide equipments whic ch is connected to Inte
ernet,
netw
work protocol TCP/IP, Interface
I Sttandard RJ4 45 or RS4885.
2.7.1 Power Requireme
R nt
L+N Electrrical Outletss for Serial Power Adapter.
Power Ada apter for Seerial Input: 90~240VA
9 AC 0.023A, Output: 5~ ~36VDC 1A A
Figure 2.14
4 Serial Pow
wer Adapte
er
WAR
RNING
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 15
Ple
ease refer to
o local speccification to
o choose Ele
ectrical Outtlets
2.7.2 Serial Server Wirin
ng
1. Connnect RS4855A port in Serial
S to RS4
485A port in Commun nication Bo
ox using RSS485 Cable
e;
Connnect RS4855B port in Serial
S to RS4485B port in Commun nication Boxx using RS4
485 Cable;
RS 485A
4
RS 485B
4
RJ45 E
Ethernet
Cable
2.Plug the
t Serial Power
P Adappter to Powe
er Outlet an
nd power th
he Serial.
3. Ensu
ure all the ca
ables are co
onnected.
2.8
8 Ground
ding
Groundding metho
od is finishe
ed or provided by insstallation te
eam. Powerrway provid des integra al
grounding method
d for modules. Ground ding Symbool is shown ini the installation step to illustrate
e
ounding po
the gro osition. Bessides, groun
nding methhod betwee en Main Raail and Posst is shown n
below, Powerway Strongly reecommend this metho od. Ground Wires
W are p
provided byy installationn
Team.
WAR RNING
1. Grouunding cables need to be secured
d so that theey cannot ccome into contact
c with
h
the Bearing
B Hou
usings and piles throughout the rotation
r of the tracker during
d
rotattion
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 16
F
Figure 2.16
6 Groundin
ng Betwee
en Main Ra
ail and Postt and Grou
und Symbo
ol
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 17
Grounding method
1. Usingg a self-tap
pping drill bit
b drill hole
e at the gro
ound cable attachmen nt position or use wire
e
connnector at the
e node as shown
s below
w.
2. Insta
all a tapping
g screw through the wire
w connec ctor into tap
pped holes of the pile and torque
e
tube.
3. Tightten screw with
w 3~5 N--m.
4. Spraay Epoxy Zinnc-rich Painnt with Zinc
c on the tap
pping screw w.
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020
Project Nu
umber: Revision: A Page 18
Figu
ur2.17 Insta
all Ground Cable usin
ng Soft Grrounding C
Cable
Pow
werway Renew
wable Energy Co
o., Ltd CONFIDENTIAL 2020