You are on page 1of 4

Secondary Drawing Tracking list(G2G) 10-10-2023

Letter Ref. & Date of SSD


SL.No Substation name Type of Drawing Priority
Submission Checking by

1 Panel FAT report 2nd & 3rd lot 10 nos SS 4827 - 26/09/23 1 PD office

2 132/33 kV Mirpur 33kV Incomer TR 1/2/3 4905 - 02/10/23 1 Mr.Kuratul Ain

3 230/132 kv Fenchuganj I/O 4714 - 04/09/23 1 Mr.Kuratul Ain

4 230/132 KV Bibiyana PSLD 4784 - 12/09/23 1 Mr.Kuratul Ain

ATR-3 CRP 4902 - 02/10/23 1 Mr.Rajnanain

5 230/132 KV Comilla(N) 132kV Incoming 4901 - 02/10/23 1 Mr.Rajnanain

230kV & 132kV EMP 4896 - 02/10/23 1 Mr.Kuratul Ain


6 Telecommunication System Layout 4536 - 13/08/23 1 TEL Div,Tawfiq sir
7 132/33kV Patnitola SAS Panel 1&2 FD 4415 - 26/07/23 1 Mr.Kuratul Ain
8 230/132KV Khulna (C) CRL 4984-10/10/2023 1 Kaniz MAM
9 230/132KV Barapukuria (N) PSLD 4916 - 3/09/23 1 Mr.Kuratul Ain
10 132/33kVCox bazar BBP 4833 - 27/09/23 1 Bari sir
11 400/132KV Bibiyana SPR CRL dwg 4978-10/10/2023 1 not yet mark to SSD
12 400/132 KV Shambuganj PSLD 4941-08/10/2023 1 Mr.Kuratul Ain
13 230/132KV Palashbari CRL 33KV 4960-09-10-2023 1 Mr.Kuratul Ain
14 230/132/33kV Barisal(N) Tariff Meter 4604 - 22/08/23 1 Mr.Kuratul Ain

Total Volumes: 16
Secondary Drawing Tracking list(G2G) 03-10-2023
Letter Ref. & Date of
SL.No Substation name Type of Drawing Priority
Submission
2 Cox bazar BBP 4833 - 27/09/23
3 Bibiyana CRL dwg 4978-10/10/2023
4 Khulna (C) CRL 4972-10/10/2023
5 Shambuganj PSLD 4941-08/10/2023
6 Palashbari CRL 33KV 4960-09-10-2023
Bari Sir
PD office
PD office
PD office
PD office
Secondary Drawing Tracking list(G2G) 03-10-2023
Letter Ref. & Date of
SL.No Substation name Type of Drawing Priority
Submission
1
2
3
4
5