Maintenance program
General maintenance items:
b- Growing season: start from 1st April to 31st October for most of landscape plants,
for winter plants growing season to be from 1st November until 31st March.
c- Out of growth season: start from November to March and vice versa for winter
plants. Still modification for seasons could happen according weather.
d- Contactor must complete all missing plants which missed by lack of maintenance
with the same specs for plants in planter’s area or changing the whole planter
with new matched plants to ensure uniformity.
e- The Contractor admits that he inspected the site with full knowledge of all items
that on his own responsibility on his mobilization period.
Moreover, that damage done by his work force or subcontractors is to be his
responsibility for fixing. The contractor is responsible to apply all tools and extra
required equipment that are necessary to all maintenance needs.
f- The contractor equipment should work properly, good looking, efficient, suitable
to site profile with clear company logo. Moreover, any equipment that leaks fuel,
engine liquids, grace…etc. shall be excluded out of site. Cleaning and removing
consequent to be deducted out of contractor’s monthly invoice.
h- The contractor will replace dry plants and severely infected plants due to mistreat
or non-efficient use of irrigation system or as a result of any defects due to
maintenance failures in the performance at his own expense.
i- Engineer approval is necessary before replacing plants and irrigation parts & and
any other site assets or items and those will be matching previous plants or item
on size and quality. Also, Irrigation parts and fittings should be approved before
using.
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 1
Emaar Misr – Marassi FM
j- Contractor accepts that upon any delay in implementing of assigned tasks/
damages repairing and instructions, Emaar shall proceed by own/other contractor
to do task deducting cost from his monthly dues.
k- The contractor admits to clean landscape areas and dispose the residues. On his
own responsibility or to be deducted of monthly invoice.
l- Contractor is requested to submit soil analysis (including physical and chemical)
every three months and improve any deficiency of soil elements.
m- The contractor has to assign professional qualified Manpower (not less than75 %
should have previous experience in similar 5 stars Hotels& resorts) to accomplish
required tasks 24 hrs. /daily in Special Areas. That to be approved by Emaar
representative during mobilization period.
The contractor must present Engineers & supervisors CV to approve by Emaar.
n- All Manpower Must be available only for this contract scope and they shall not
work in another contract Scope.
o- Contractor is responsible to provide all required workers on daily basis and also
responsible about transportation. Providing all required workers & technicians
uniforms and shoes. Uniform samples should be approved by the Emaar Rep.
q- Emaar Rep. has all authority to instruct Contractor to increase Labors and
Equipment in case of failure to perform maintenance obligations.
r- Contractor must send annual action plane for landscape maintenance within 2
weeks from handing over scope and within the last 5 days of each month for the
next month.
s- Contractor must send monthly report for landscape works during month.
t- Contractor must send annual report for landscape works & landscape
development during year.
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 2
Emaar Misr – Marassi FM
u- For any excavation works, Contractor must use plastic sheet to isolate between
Agricultural soil and excavation dispose.
v- Emaar Rep. must approve all equipment which will be use in the contract SOW.
w- The contractor is responsible for his crew safety and providing safety tools and
equipment to his crew including offices and stores.
x- The contractor will supply samples for fertilizers, pesticides, fungicides and
compost for approval and will be applied under Emaar Rep. supervision.
y- Not allowed to the contractor to have any contact with clients and tenants for
implementing or maintain private areas or private modifications without a signed
permission by Emaar, such action cancel contract immediately.
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 3
Emaar Misr – Marassi FM
1.2. Irrigation Network operation and maintenance:
Irrigation controller to be-adjusted upon formula calculation to plant water
requirements, irrigation schedule to be sub-mitted by contractor approved by
Emaar rep.
Irrigation controller should be checked Daily and to be cleaned out of dust, dirt
and debris.
Spray heads to be leveled with the lawns and make the necessary edging for
each head – adjusting nozzle away of any building or wood fence and must on
weekly regular bases.
Spare parts should be available in onsite storage to cover required work for 3
months at least.
Avoiding any use of hose or uncontrolled use of water, if there is a needed to
be used, it must be with hose nozzle, or water adjustable spray gun.
Valve boxes must be clean and free of water, soil surface covered by gravel in
a level beneath valves weekly.
GR, PE irrigation tubes, drip emitters must be cleaned & fixed probably with
sticks weekly.
Emaar Rep. must approve all items/spare parts before replacement.
Maintain both manual and automatic valves and keep clean, functional and free
of leakage on weekly regular bases.
Cover metal parts by grace to prevent rusting.
Clean sprayers, bubblers, filters, valves, etc.…. internal filter on weekly regular
bases.
Clean all lines ends weekly.
2. Plants Maintenances:
2.1 Maintaining Trees:
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 4
Emaar Misr – Marassi FM
2.1.1 Fertilization: -
Starting from 15th October & 15th April, apply 3 kg of compost mixed with
fertilizers from two opposite sides on the root border.
On growth season, apply 50 Gm. EUR origin slow release approved fertilizer +
approved Humic acid with the manufacture rate every 60 days
Out of growth season, apply 50 Gm. EUR origin slow release approved
fertilizer every 90 days with addition of EUR or USA origin chelated
micronutrients according to plant requirements with manufacture rate one time
during out of growth season and to be repeated according to plant status.
2.1.3 Preventive: -
Use a monthly application of preventive pesticides to keep trees free of insects
according to pest habits and climate.
Use monthly application of fungicide preventive and after sand storms to keep
plants out of disease, use systematic fungicide only for controlling infections,
with recommended rates or as instructed.
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 5
Emaar Misr – Marassi FM
2.2.1 Regular maintenance tasks:
Flipping and aeration for plants beds:
Combined with weed control process, to do task not more than 15 days time
interval in summer time and every 30 days in winter for ground cover or as
required to keep weeds from forming flowers/seeds and size not exceeding 10
cm.
For shrubs cactus and succulent area every 30 days with previous remark. Fine
grading is important post this process.
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 6
Emaar Misr – Marassi FM
A- Compost 1.25 KG / M2
B- Granule super phosphate 0.1 kG.
C- Potassium sulfate 0.5 KG.
D- Sulphur /agriculture gypsum 0 .1 KG.
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 7
Emaar Misr – Marassi FM
A- Apply 25 kg. Of EUR origin approved balanced slow release fertilizer 2
time during period.
2.3 Lawn:
1. Mow, edge and trim lawn weekly or as required to maintain an even, well-
groomed appearance.
2. Remove visible lawn clippings and dispose them off-site.
3. Control weeds in lawn areas as noted under the weed-control section.
4. Replace any lawn found to be dead or severely yellowed with plant material
of identical species.
2.3.2 Mowing:
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 8
Emaar Misr – Marassi FM
2. Use a sharp mower can keep a lawn looking neat and well clipped. Dull
mowers cause ragged and chewed off grass blades that die back and give the
lawn an off-color appearance.
5. Flower beds and edges trimming. Cut the grass beside curbs, walkways, trees,
poles or internal islands regularly after mowing process.
6. In 15th October & 15th March Must starting maintenance for Lawn as the
following Process:
Mowing the lawn in the lowest mower Level.
Starting fertilizing directly as per period program.
o Apply humic acid according to manufacture rate. Three times during season.
o Apply chelated Fe & Mg monthly with the rate of 20 gm/100 m2 for each
element.
o Addition of microelements must include Fe & Mgso4 according to manufacture
rate monthly if required and repeat according to plant status.
o Apply 0.5 kg. /100 m2 of Ammonium nitrate monthly.
Autumn fertilizing:
Spring Fertilizing:
A. Mix of Sand and compost layer with the thickness of 2 cm according to degree
of level difference and with the ratio of 2:1. Process could be split into two
halves to be completed in spring according to site requirements.
B. Slow release approved EUR fertilizer with rate of 25 Kg/1000 m2 or according
to manufacture rate (one time during the period).
C. Nitrate 50 % 10KG/1000 m2. (One time during the period).
D. Urea 46% 10 KG /1000 m2 (one time during the period).
Winter fertilizing:
o The following chemicals to be applied to every 100-meter square of destined
area:
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 10
Emaar Misr – Marassi FM
Note: -Alternate brands of Pesticides and fungicide shall be applied After
Emaar rep. approval.
Maintain palm trees and ornamental palms (fertilizing, pest control, disease
control) to keep free of pests, fungus and deficiency of elements in a good
healthy shape including all necessary procedures of pruning, spraying, adding
chemical and organic materials and Replacing.
2.4.1 Pruning:
Pruning shall start in winter December – January to minimize red weevil attacks.
1 Wounds and cuts dust with elemental sulfur powder as a deterrent for red
weevil.
3 Remove any emerging shoots at the base to maintain cleanliness and reduced
humidity levels around it.
4 Prune and sulfur-dust again during flowering season, removing male and
female flowers.
5 Do not climb palm trees using spikes but using ropes to avoid scratches that
attract insects.
Since the Red Palm Weevil is the most lethal pest, it is very important to implement
the following steps:
1. Inspection:
A. The contractor is responsible for Monthly checking of all palm trees within the
contract’s scope of work area.
B. Weevil presence Status follow-up: Use pheromone traps to count and detect
Red Palm Weevil numbers on a weekly basis and generate bi-weekly reports
for palm trees status.
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 11
Emaar Misr – Marassi FM
2. Preventive pest management:
B. Safely disposing of completely damaged palms, spray with rate of 15 cm3. /L.
before removing with touch effecting pesticide. (Pestibane, Chlorozan).
C. Apply pesticides every 4 weeks during high active RPW season from the mid.
Of Feb to the end of November, and every 6 weeks out of season. Using
pesticide. Upon infection use appropriate pesticide injected with recommended
concentration according to standard of practice.
b- Washing:
Washing palm trees after each sand/dust storm using fungicide solution
with the rate 3 gm /L, or according to site instructions after sandy storms.
3. Controlling infection:
1- RPW Severely infected palm trees: Spray thoroughly before removing with
the rate of 15 gm. / L. or more, Shred and bury with active lime/burn
immediately away from site. A pesticide application shall also be applied to
the soil around the palm tree and apply active lime after removing in pet. The
treat uninfected palm trees within the scope of work by spraying of the stem
and crown immediately and after 2 weeks.
Use any approved brand of pesticide according to recommended
concentrations.
2- RPW Infected palm trees: Treat with fumigation tablets, or adding
of suitable pesticide with enough rate to kill inside infection. After
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 12
Emaar Misr – Marassi FM
removing infected palm and sealed using clay soil or with other
approved methodology.
4- Palm tree cuts: Avoid pruning, removing fronds or causing any open
cuts to the trunk during weevil’s active season. It is preferred to
perform this kind of maintenance during the wintertime. All wounds
shall be immediately treated with sulfur. Cuts shall be sprayed
immediately with. Pesticide to be re-applied twice afterwards at 3 to
4 weeks’ interval.
2.4.3 Fertilizing: -
Autumn treatment:
Spring treatment:
Starting of 31st March apply to the other two opposite sides of palm pit. A
mix of:
1. 1kg. Ammonium nitrate
2. 0.5 kg EUR origin slow release approved fertilizer
Emaar Misr‐ECM .
FM#129 ‐ Landscape Scope of work. Page 13
Emaar Misr – Marassi FM
2. Add EUR origin slow release approved fertilizer +TE in rate 500 Gm. /
palm / two times during growth season.
1. Add EUR origin slow release approved fertilizer +TE in rate 500 Gm. /
palm.
2. Granule super phosphate 1 kg divided by 4 equal amounts.