FIG 2
FROM FINAL TEST
FIG 3
STEP 1 (FIG 1 & 2) – REMOVE ALL ITEMS LISTED
SCREW 11-004-12 8 OFF AND RECYCLE TO MAIN BUILD LINE – STAGE 9
T10 INSERT 14lbf-in
STEP 2 (FIG 3) – ASSEMBLE 8 SCREWS (RED)
TWO OFF SCREWS EACH POSITION STEP 3 (FIG 4) – REMOVE ALL ITEMS LISTED AND
TEST ADAPTOR ASSEMBLY REMOVED RECYCLE TO MAIN BUILD LINE – STAGE 1
Sequence of operation
UNCLAMPED POSITION
Position device
Leak test
FROM STAGE 1
PRESSURE TEST
FOLLOW GENERIC
INSTRUCTION 95-037
PASS TO STAGE 3
LOAD SPREADER
ATTACH BAND LABELS /PRODUCT LABELS/
96-467-04 – STAGE 3 – RD0935 FINAL BUILD CUSTOMER SCREW PACKAGE / Rx PORT ISSUE NO 04 ECN 7452
GASKET / PROTECTION CAPS
FOLD BAG AND ATTACH CABLE TIE
FIG 1 FIG 2
MAKE HOLE 49-0411-XX
INSERT 4 SCREWS
POLY BAG 30-0726-XX
11-004-08-P19
STEP 3 (FIG 3) – AFTER FITTING STEP 2 LABEL FIT THE REMAINING FIG 10
TWO LABELS (APPROX SEPARATION 6mm)
ANT 1
CONNECTOR
SERIAL LABEL 15-043-XX 1 OFF FIG 8 VINYL CAP 30-0718-XX (x4) Fit in place
FIG 3
STEP 4 (FIG 4 & 5) – PLACE 4 SCREWS IN POLY BAG AND SEAL.
STEP 5 (FIG 6 & 7) – FOLD BAG IN HALF AND MAKE HOLE THROUGH BOTH SIDES OF BAG
(YELLOW DOT) IN ORDER TO FEED THROUGH CABLE TIE AS SHOWN IN FIG 6.
STEP 6 (FIG 8) – PLACE CABLE TIE THROUGH HOLE IN LID AND SECURE IN PLACE. FEED THE
WHOLE SCREW PACKAGE DOWN INTO THE CAVITY AS SHOWN. IT IS NOT NECCESARY TO CROP
OFF THE FREE END OF THE CABLE TIE.
STEP 7 (FIG 9) – ASSEMBLE GASKET OVER EACH LID INSERT AND FIX IN PLACE –
CONCENTRICITY OF GASKET IN RELATION TO INTERNAL AND EXTERNAL DIAMETERS OF LID
INSERT IS IMPORTANT.
STEP 8 (FIG 10) – FIT VINYL PROTECTION CAPS OVER EACH LID INSERT