COURSE
PROJECT MANAGEMENT
MIDTERM - REPORT
TITLE: RIVER FRONT GOTHIC HOUSE
LECTURER:
ĐOÀN GIA ÂU DU,
Ph.D.
1
Examiner’s comment
INSTRUCTOR’S COMMENTS
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………
2
Table of Contents
Instructor..........................................................................................................................3
CHAPTER I. PROJECT OVERVIEW.........................................................................5
1.1. Purposes, scope statements, and objectives.........................................................5
1.2. Collection of initial requirements.........................................................................5
CHAPTER II. QUALITY OBJECTIVES AND WORK BREAKOUT
STRUCTURE (WBS)................................................................................................6
2.1. Quality objectives...................................................................................................6
2.2. Work Breakout Structure (WBS)........................................................................8
CHAPTER III: PROJECT CHARTER.......................................................................10
3.1. A Practical Project Charter................................................................................10
3.2. Basic design / Construction drawings................................................................13
CHAPTER IV: PROJECT SCHEDULE PLANNING..............................................15
4.1. Identification of key activities.............................................................................15
4.2. Activity duration estimates – GANTT chart.....................................................18
4.3. Activity sequences – PERT chart.......................................................................20
CHAPTER V: BUDGET MANAGEMENT PLANNING..........................................20
5.1. Costs assigned to derivable resources................................................................20
5.2. A roll-up project baseline....................................................................................25
CHAPTER VI: RISK AND QUALITY ASSESSMENT............................................27
6.1. Risk assessment....................................................................................................27
6.1.1. Risk Identification.............................................................................................27
6.1.2. Assessment of Probability and Consequence (Qualitative)...........................28
6.1.3. Assessment of Probability and Consequence (Quantitative)........................30
6.1.4. Mitigation Strategies.........................................................................................31
6.2. Quality management report................................................................................32
CHAPTER VII: TRACKING AND STATUS UPDATES.........................................33
7.1. Tracking milestones.............................................................................................33
7.2. Control systems....................................................................................................35
CHAPTER VIII: PROJECT CLOSE-OUT................................................................37
3
REFERENCES...............................................................................................................39
CHAPTER I. PROJECT OVERVIEW
Purposes
The primary purpose of the Riverfront Gothic House project is to construct a unique
residence that combines the historical charm of Northern European Gothic architecture
with modern living comforts. Positioned along a riverfront, the house is designed as a
tranquil weekend retreat, offering relaxation and an immersive experience in nature and
architectural beauty.
Scope statements
The project's scope is extensive, encompassing the creation of a Gothic-style architectural
plan that integrates with the riverfront environment, ensuring minimal ecological impact
and compliance with environmental standards. The construction phase focuses on using
high-quality, anti-corrosive materials suited for riverfront conditions to ensure durability
and safety. Additionally, the project includes obtaining necessary permits, adhering to
local building codes, and efficiently managing resources, timelines, and budget.
Objectives
The objectives are to authentically represent Gothic architectural elements while
incorporating modern amenities, ensure environmental sustainability, and use durable
materials for longevity. Efficient resource and time management to stay within budget
and timeline constraints is critical. Ultimately, the project aims to exceed the
homeowner's expectations, creating a functional, aesthetically pleasing, and comfortable
retreat.
4
and scenic views.
Environmental Compliance: Ensure the design and construction process adhere to
environmental regulations and standards. Conduct a comprehensive environmental
impact assessment to minimize ecological disruption.
Material Selection: Use high-quality, durable, and anti-corrosive materials suitable
for riverfront conditions. Emphasize on materials that are resistant to humidity and
potential flooding risks.
Legal and Regulatory Adherence: Obtain all necessary building permits, ensuring
full compliance with local zoning laws, building codes, and riverfront construction
regulations.
Construction Quality and Safety: Focus on foundational stability and structural
integrity, especially considering the proximity to the river. Implement rigorous quality
control measures throughout the construction process.
Budget and Timeline: Establish a realistic budget and timeline, accounting for
potential challenges unique to riverfront construction, including weather-related delays
and material sourcing.
Sustainability Features: Incorporate sustainable building practices and materials,
aiming for energy efficiency and reduced environmental impact.
The quality objectives for the Riverfront Gothic House project are formulated to ensure
excellence in every aspect of the construction and design, aligning with the overarching
vision of creating a unique, durable, and aesthetically pleasing riverside residence.
Architectural Authenticity: Achieve a high degree of architectural fidelity to Northern
European Gothic styles. This includes precise replication of key Gothic features like
5
pointed arches, ribbed vaults, and intricate window designs. The design should not only
reflect historical accuracy but also adapt to modern living standards.
Material Quality and Durability: Select and use premium-grade materials that are
specifically suited to riverfront conditions. This includes anti-corrosive materials for all
metal components, high-grade timber for wooden elements, and water-resistant materials
for foundations and exteriors. Each material must pass stringent quality checks for
durability, sustainability, and aesthetic appeal.
Construction Precision and Safety: Implement rigorous construction practices ensuring
precise craftsmanship. This involves accurate adherence to architectural plans, meticulous
attention to detail in Gothic detailing, and strict compliance with safety standards.
Regular quality inspections will be conducted at each phase of construction to identify
and rectify any deviations from the plan or quality standards.
Environmental Compliance and Sustainability: The project must meet all environmental
regulations and strive for sustainable building practices. This includes efficient waste
management, use of eco-friendly materials, and implementation of energy-efficient
systems. The goal is to minimize the ecological footprint of the construction process and
the finished structure.
Functional and Aesthetic Integration: Ensure that the functional aspects of the house,
such as plumbing, electrical, and heating systems, are seamlessly integrated without
compromising the Gothic aesthetic. Interior design elements should also reflect the
Gothic theme while offering modern comfort and usability.
Customer Satisfaction and Feedback: Post-construction, a thorough evaluation will be
conducted to ensure the house meets the homeowner's expectations in terms of quality,
design, and functionality. Feedback will be actively sought and used as a measure of
success and for continuous improvement in future projects.
6
2.2. Work Breakout Structure (WBS)
The Work Breakdown Structure (WBS) for the Riverfront Gothic House project is
meticulously structured to encompass all phases of the project, from initiation to
completion, ensuring a thorough and methodical approach.
7
(i) Project Management forms the backbone of the project, involving the initiation and
planning phase where the scope, objectives, and timelines are defined. Resource
allocation follows, assigning tasks, budget, and manpower efficiently. Regular progress
monitoring and adjustments to the project plan are essential, alongside proactive risk
management and maintaining effective communication among all stakeholders.
(ii) In the Design Phase, a multi-faceted approach is adopted. This includes developing
detailed Gothic-style architectural plans, planning the interior layout with Gothic-inspired
decor, and designing the outdoor spaces to complement the riverfront setting. Structural
engineering is critical, focusing on the creation of detailed structural plans for stability
and safety. Additionally, an Environmental Impact Assessment is conducted to ensure
environmental sustainability.
(iii) Regulatory Compliance is a crucial step, involving the acquisition of necessary
building and environmental permits and ensuring that the design adheres to local zoning
and building codes.
(iv) Site Preparation starts with a comprehensive land survey, followed by site clearing
and laying a stable and durable foundation, crucial for riverfront construction.
(v) The Construction Phase progresses through several stages. It begins with erecting the
basic structural framework, followed by exterior construction that includes roofing and
incorporating Gothic elements. Interior construction implements the planned designs and
installations, along with the installation of plumbing and electrical systems. The phase
concludes with finishing work, including painting and decoration.
(vi) Quality Assurance throughout the project is vital, entailing regular inspection and
testing for construction quality and safety, and making necessary corrections and
adjustments based on these inspections.
As the project nears completion in the Project Finalization stage, landscaping as per the
design plan is implemented, and a comprehensive final inspection is conducted. This is
followed by a client walkthrough, where the homeowner is guided through the property,
leading to the official handover of the house.
8
(vii) Finally, in the Post – Construction phase, feedback is collected from the
homeowner, all relevant documentation is compiled and handed over, and a maintenance
plan and warranty coverage are established.
This structured WBS ensures that the Riverfront Gothic House project is managed in an
organized, systematic manner, covering every critical aspect from design and
construction to the final handover.
⋅ Purpose: To build a customized Riverfront Gothic House for weekend living and
⋅ Justification: The project fulfills the homeowner's passion for Gothic architectural
9
⋅ Out of Scope: Land acquisition, external infrastructure (e.g., roads, public
10
- The project must undergo inspections at various stages by local building
inspectors to ensure compliance with safety standards and regulatory
requirements.
● Budgetary Approval
11
- Recording Changes: All change requests and decisions are documented in a
change log.
- Updating Project Documents: Upon approval, project plans and related documents
are updated to reflect the changes.
- Communication: Approved changes are communicated to all relevant stakeholders
to ensure alignment and understanding.
The Basic Design and Construction Drawings phase is a critical component of the
Riverfront Gothic House project. This phase involves translating the conceptual Gothic
architectural elements into detailed, practical blueprints that will guide the construction
process. This phase focuses on creating a comprehensive set of drawings that encapsulate
the essence of Northern European Gothic architecture while ensuring practicality and
compliance with modern building standards.
Exterior Design
12
Interior Design
● Layout Planning: Interior layouts will be designed for optimal functionality, flow,
and aesthetic appeal, incorporating Gothic design principles.
● Gothic-inspired Interiors: Interior features will include vaulted ceilings,
decorative stonework, and other Gothic elements, blended seamlessly with modern
amenities for comfort and convenience.
● Custom Features: Custom design elements, tailored to the homeowner's
preferences, will be incorporated, ensuring each space reflects a balance of Gothic
style and personal taste.
Structural Drawings
● Framework Details: The structural drawings will detail the building's framework,
focusing on stability, especially considering the riverfront location.
● Material and Safety Specifications: Detailed specifications for construction
materials, ensuring they are in line with safety standards and building codes.
● Electrical Schematics: Detailed plans for electrical systems, ensuring they are
efficient, safe, and discreetly integrated into the Gothic design.
● Plumbing Layouts: Plumbing plans will be designed for functionality and
efficiency, considering the unique layout and design elements of the house.
Landscape Design
● Harmonizing with Architecture: The landscape design will complement the Gothic
architecture, with an emphasis on creating a seamless transition between the
building and its natural surroundings.
● Sustainable Practices: Plans will incorporate sustainable landscaping practices,
enhancing the riverfront environment.
13
Technical Specifications and Compliance
● Compliance with Regulations: All drawings will adhere to local building codes
and environmental regulations.
● Technical Details: They will include precise measurements, material types, and
technical specifications required for construction
● Review and Approvals: Each set of drawings will undergo a thorough review
process by the architectural team, engineers, and the project manager.
● Stakeholder Involvement: Regular consultations with the homeowner to ensure the
designs align with their vision and expectations.
● Final Review: A comprehensive final review to ensure all aspects of the design are
accurate and meet the project's standards.
● Approval Process: Sign-off by the architectural team, project manager, and
homeowner, marking the completion of this phase.
Pre-Design Stage:
14
● Initial Consultation (Duration: 1-2 weeks): Engage in in-depth discussions with
the homeowner to capture their vision, preferences for Gothic style, and specific
needs for the riverfront property.
● Site Analysis (Duration: 2-4 weeks): Conduct geological surveys, environmental
impact assessments, and topographical mapping. This stage will involve
specialists to assess soil quality, flood risks, and any ecological sensitivities of the
riverfront.
Design Stage:
● Architectural Design Development (Duration: 2-3 months): Develop detailed
architectural plans, including exterior and interior layouts, Gothic elements, and
integration with the natural surroundings. Multiple review and revision cycles with
the homeowner are anticipated.
● Engineering Design (Duration: 1-2 months): Develop structural, electrical, and
plumbing blueprints. Focus on foundation integrity, especially considering the
riverfront location, and integration of sustainable technologies.
Planning and Approvals:
● Regulatory Compliance and Permits (Duration: 1-3 months): Prepare and submit
detailed plans to local authorities for approval. This includes zoning permits,
environmental clearances, and building permits. The duration can vary
significantly based on local government processing times and the need for any
revisions.
● Risk Assessment (Duration: 2-4 weeks): Conduct a comprehensive risk analysis
focusing on the riverfront location. Key areas include foundation stability,
moisture and corrosion resistance, and long-term structural integrity. Develop
mitigation strategies for identified risks.
Construction Stage:
● Groundbreaking and Foundation Work (Duration: 2-3 months): Begin with site
preparation, including clearing, grading, and excavation. Follow with laying of the
15
foundation, which may involve specialized techniques due to the riverfront
location.
● Structural Framework (Duration: 3-4 months): Erect the core structural
framework, ensuring adherence to Gothic architectural designs and engineering
specifications. This phase requires close coordination among various construction
teams.
● Exterior and Interior Work (Duration: 4-6 months): Progress to constructing the
exterior shell (roofing, siding, windows) and then move to interior works like
drywall installation, flooring, and fixture installations. Regular quality checks are
essential.
● Finishing Touches (Duration: 2-3 months): This includes detailed interior and
exterior painting, trim work, and final aesthetic details that highlight the Gothic
style.
Post-Construction Stage:
● Inspections and Quality Assurance (Duration: 1 month): Conduct thorough
inspections to ensure all aspects of construction meet the agreed specifications,
building codes, and quality standards.
● Final Walkthrough with Homeowner (Duration: 1-2 weeks): A comprehensive
review of the completed project with the homeowner to ensure satisfaction and to
address any final adjustments.
Project Closeout:
● Documentation Handover (Duration: 1 week): Provide the homeowner with all
necessary documents, warranties, and maintenance guides.
● Project Review (Duration: 1 week): A final meeting with the project team to
evaluate the project's successes, challenges, and lessons learned for future
reference.
16
4.2. Activity duration estimates – GANTT chart
17
4.3. Activity sequences – PERT chart
In this section, we detail the specific cost allocations for the various resources required
for the Riverfront Gothic House project. These costs have been meticulously estimated
based on current market rates and the unique requirements of the project.
18
Material Costs:
Labor Costs
Additional Costs
19
Other Essential Costs
20
Plan Budget Management
Table 1. Construction Materials List
STT Material Name Quantity Đơn giá Total Price
Purchased
21
14 Welding Wire 70S- 100 190.476 đ 19.047.619 đ
12MM
15 Welding Wire NTT 35 100 20.000 đ 2.000.000 đ
Engineer 2 15 30 120
Construction 10 6 60 240
Worker
Craftsman 15 5 75 300
Project Manager 1 20 20 80
22
These additional costs are crucial for a comprehensive understanding of the financial
requirements of the project. They ensure preparedness for a wide range of expenses,
contributing to a realistic and robust budget. The estimated costs for these categories will
vary based on the project's specific needs, location, and duration, and should be carefully
considered in the overall budget planning.
24
CHAPTER VI: RISK AND QUALITY ASSESSMENT
6.1. Risk assessment
6.1.1. Risk Identification
In the Riverfront Gothic House project, identifying potential risks is crucial for
developing effective mitigation strategies. This section outlines specific risks associated
with the project, focusing on realistic scenarios and data-driven assessments.
(i) Environmental and Geographical Risks:
- Flood Risk: The site’s proximity to the river increases the risk of flooding.
Historical flood data indicates a 15% annual probability of a flood event
significant enough to impact construction or damage the property.
- Soil Instability: Geotechnical reports reveal that the soil composition has a 10%
likelihood of subsidence, which could affect the foundation's integrity. This
percentage is derived from regional soil stability studies and past construction
experiences in similar terrains.
(ii) Construction-Related Risks:
- Material Delays: Given the project's reliance on specialized Gothic-style materials,
supply chain analysis, considering recent global disruptions, suggests a 20%
probability of delays, potentially impacting the project timeline.
- Labor Shortages: Current labor market analysis, considering the specialized skills
required for Gothic architecture, points to a 25% chance of encountering shortages
in skilled labor, particularly craftsmen adept in specific architectural techniques.
(iii) Regulatory and Compliance Risks:
- Permitting Delays: Local government data shows that approximately 30% of
construction projects in the area experience delays due to the permitting process,
including environmental impact assessments and zoning approvals.
- Building Code Compliance: Based on assessments of unique architectural projects
in the region, there's a 15% risk of initial plans not fully complying with specific
local building codes, necessitating design modifications.
25
(iv)Financial Risks:
- Budget Overruns: Industry benchmarks indicate a 40% chance of exceeding initial
budget projections in custom home construction projects, due to variables like
material cost fluctuations and unforeseen structural challenges.
- Interest Rate Fluctuations: With a volatile financial market, there's a 20%
probability of interest rate increases affecting the cost of capital if the project is
financed.
(v) Project Management Risks:
- Timeline Delays: Analysis of comparable projects shows a 35% probability of
delays, attributed to factors like extended design approval processes, construction
setbacks, and potential redesigns due to regulatory compliance issues.
Technological Risks:
- Design Software Incompatibilities: Considering the advanced architectural
software used, there's a 10% risk of technical issues or incompatibilities,
potentially leading to delays in design finalization.
Market Risks:
- Changes in Market Demand: With a 5% risk based on real estate trends, there's a
possibility of changing market preferences impacting the project's resale value or
rental prospects.
26
- Probability: Low to Medium. Geotechnical reports indicate some risk, but not at a
severe level.
- Consequence: High. Any impact on the foundation could be critical and expensive
to remediate.
● Construction-Related Risks:
Material Delays:
- Probability: Medium. Supply chain disruptions are possible but not certain.
- Consequence: Medium. Delays could lead to project timeline extensions and
increased costs.
Labor Shortages:
- Probability: Medium. The current market trends show some likelihood of this
issue.
- Consequence: Medium to High. Shortage of skilled labor can delay construction
phases and impact the overall quality.
● Regulatory and Compliance Risks:
Permitting Delays:
- Probability: Medium to High. Bureaucratic processes can be unpredictable and
lengthy.
- Consequence: Medium. While not directly affecting the construction quality, it can
lead to timeline extensions.
Building Code Compliance:
- Probability: Low to Medium. Thorough initial planning can minimize this risk.
- Consequence: Medium. Non-compliance may require design alterations, leading to
delays and additional costs.
● Financial Risks:
Budget Overruns:
- Probability: High. Custom projects often face this issue due to various
unpredictable factors.
27
- Consequence: High. Overruns can strain financial resources and affect project
viability.
Interest Rate Fluctuations:
- Probability: Medium. Dependent on broader economic conditions.
- Consequence: Medium. Affects the financing cost but is manageable with proper
financial planning.
● Project Management Risks:
Timeline Delays:
- Probability: High. Delays are common in complex construction projects.
- Consequence: High. Can lead to increased costs and stakeholder dissatisfaction.
Flood Risk:
- Probability: 15% (based on historical flood data).
- Consequence: Estimated cost impact for significant flooding events, considering
construction delays and material damages.
Soil Instability:
- Probability: 10% (as indicated by geotechnical surveys).
- Consequence: Additional foundation reinforcement costs
● Construction-Related Risks:
Material Delays:
- Probability: 20% (reflecting current supply chain volatility).
- Consequence: Potential increase in project duration by 30 days, costing in
extended labor and overheads.
Labor Shortages:
- Probability: 25% (based on current labor market trends).
- Consequence: Delay in project milestones by up to 45 days.
28
● Regulatory and Compliance Risks:
Permitting Delays:
- Probability: 30% (derived from local construction project data).
- Consequence: Potential delay of 60 days, incurring additional project management
costs.
Building Code Compliance:
- Probability: 15% (based on preliminary design reviews).
- Consequence: Costs for redesign and additional approvals
● Financial Risks:
Budget Overruns:
- Probability: 40% (industry standard for custom construction projects).
- Consequence: Potential overrun of up to 20% of the total budget.
Interest Rate Fluctuations:
- Probability: 20% (based on current economic forecasts).
- Consequence: An increase in interest rates could raise the total project financing
costs by up to 5%.
● Project Management Risks:
Timeline Delays:
- Probability: 35% (analysis of similar project timelines).
- Consequence: Each month of delay could add in indirect costs and potential
penalty fees
33
- Quality Checkpoints: Set at various stages of the project, these checkpoints
involve inspections and reviews to ensure compliance with quality standards. Any
identified issues are addressed promptly to prevent escalation.
- Feedback Loops: Regular feedback from the homeowner and key contractors is
integrated into the project process, ensuring continuous improvement in quality
delivery.
Risk Management System:
- Risk Monitoring: Continuous monitoring of identified risks, with regular updates
to the risk management plan. This includes revising strategies for risk mitigation
based on ongoing assessments.
- Contingency Planning: Maintaining contingency plans for critical risks, ensuring
readiness to address potential challenges without significant project disruption.
Financial Control System:
- Budget Tracking: Monthly financial reviews are conducted to monitor
expenditures against the budget. Variances are analyzed, and corrective actions are
taken where necessary.
- Cost Management: Cost control measures are in place, including competitive
bidding for contracts, regular auditing of expenses, and proactive management of
financial risks.
Communication Control System:
- Structured Communication Plan: Regular meetings, status updates, and milestone
reviews keep all stakeholders informed and engaged. This plan outlines the
frequency, format, and content of communications.
- Issue Resolution Mechanism: A defined process for raising and addressing issues
ensures timely resolution and minimizes impacts on project progress.
These control systems are integral to the successful management of the Riverfront Gothic
House project. They provide a structured approach to overseeing various project aspects,
from progress tracking and quality assurance to financial management and stakeholder
communication. By implementing these systems, the project team can effectively
34
navigate complexities, maintain alignment with project objectives, and ensure timely and
successful completion.