MAX
DESCRIPTION MINE 1 MINE 2 MINE 3 MINE 4 MINE 5 MINE 6 MINE 7 Remarks
MARKS
1. DGMS TECH CIRCULA NO.
1 SAFE MINE WORKINGS 100 9 OF 2008:
A) BENCHES
A OVER BURDEN BENCH - HEIGHT, WIDTH, SUPERVISION, ETC 10 B) HAUL ROADS
C) BERMS
E DUMP MANAGEMENT 5
A DRILLING PRACTICE 10
M GUARDING OF MAGAZINE 5
1 BENCH FLOOR 10
A SHOVEL / EXCAVATORS 16
B DUMPERS 20
D WHEEL LOADER 8
E SERVICE VAN 7
A SUB STATIONS 40
OUTDOOR SUB STATION:
1 a. PROVISION OF METAL IN THE BAY 10
b. PROVISION OF FENCING
EARTHING:
a. CONSTRUCTION OF EARTH PITS
b. EARTH PIT RESISTANCE VALUES
c. INTER CONNECTIVITY OF EARTH PITS /
2 10
EARTH MAT FORMATION
d. EARTHING OF SWITHGEAR INDOOR
SUBSTATION
e. FENCING EARTHING
TRANSFORMERS:
a. PROVISION OF PRIMARY & SECONDARY
SWITCHGEARS
3 10
b. SILICA GEL BREATHER
c. BUCHHOLZ RELAY
d. BTI, WTI / OIL LEVEL
INDOOR SUB STATION:
a.PROVISION OF INCOMING MAIN
b. IDENTIFICATION OF SWITCHGEAR PANELS
c. PROVISION OF INSULATION MATSIN FRONT OF
SWITCHGEAR
d. PROPER TERMINATION & GLANDING OF CABLES
FOR SWITCHGEAR
4 e. EFFECTIVENESS OF PROTECTIVE RELAYS 10
[EL, OL, ETC]
f. PROVISION OF FIRE FIGHTING EQUIPMENT
g. ADEQUATE LIGHTING
h. DISPLAY OF SUB STATION ELECTRICAL LAYOUT
/ SINGLE LINE DIAGRAM
i. FIRST AID CHART / ELECTRIAL SHOCK
TREATMENT
B
OVERHEAD [OH] LINES :
a. PROVISION OF LIGHTING ARRESTORS
b. PROVISION OF EARTH WIRE
c. EARTHING OF EARTH WIRE / POLE
d. PROVISION OF CRADLE GUARDING AT ROAD
CROSSINGS 24
e. PROVISION OF DANGER BOARDS
f. PROVISION OF ANTI-CLIMBING DEVICE
g. GROUND CLEARANCE IN THE QUARRY [12M]
h. PROVISION OF SWITCHGEAR AT OH LINE
ORIGINATING POINT
38 th Mines Safety Week Observance - 2023
MAX
DESCRIPTION Mine 1 Mine 2 Mine 3 Mine 4 Mine 5 Mine 6 Mine 7 Remarks
MARKS
C LIGHTING:
a. PROVISION OF LIGHTING TRANSFORMER
[VOLTAGE BETWEEN PHASE NOT TO EXCEED 250V,
WITH NEUTRAL / MIDPOINT EARTHING
b. PROVISION OF BASE / PLINTH FOR THE
LIGHTING TRANSFORMAR
c. PROTECTIVE DEVICES ON PRIMARY SIDE OF
LIGHTING TRANSFORMER
d. PROTECTIVE DEVICES ON SECONDARY SIDE OF
LIGHTING TRANSFORMER 21
e. EARTHING OF LIGHTING TRANSFORMER
f. EARTHING OF LIGHTING TOWERS
g. EARTHING OF LIGHT FITTINGS
h. EARTHING OF LIGHTING GEAR BOX
i. PROVISION OF 3 CORE / 2 CORE ARMOURED
CABLES FOR LIGHTING
j. PROVISION OF INDIVIDUAL SWITCHGEAR FOR
LIGHTING TOWERS
D PUMPING:
a. PROVISION OF SUITABLY RATED SWITCH
b. PROVISION OF SUITABLY RATED STARTED
c. PROVISION OF SUITABLE TYPE & SIZE OF
CABLES
d. EFFECTIVENESS OF PROTECTIVE RELAYS
[EL, OL, ETC]
e. PROPER TERMINATION AND GLANDING OF
CABLES 16
f. EARTHING OF SWITCH, STARTER AND MOTOR
g. PROVISION OF PLINTH FOR PUMP MOTOR SET
h. PROVISION OF COUPLING GUARD
i. CHECK FOR ABNORMAL TEMPERATURE RISE,
VIBRATION, ETC.
38 th Mines Safety Week Observance - 2023
MAX
DESCRIPTION Mine 1 Mine 2 Mine 3 Mine 4 Mine 5 Mine 6 Mine 7 Remarks
MARKS
E
SUPERVISION:
a. APPOINTMENT OF COMPETENT ELECTRICAL
SUPERVISOR
b. VALIDITY OF ELECTRICAL SUPERVISOR
CERTIFICATE 10
c. AUTHORISATION OF ELECTRICAL SUPERVISOR
d. APPOINTMNET OF COMPETENT ELECTRICIANS
AND WIREMANS PERMIT
e. VALIDITY OF WIREMAN PERMIT
F RECORDS:
a. MAINTENANCE OF SINGLE LINE DIAGRAM OF
ELECTRICAL INSTALLATIONS
b. PLAN SHOWING THE FIXED ELECTRICAL
INSTALLATIONS ON MINE PLAN
c. ELECTRICAL SUPERVISORS LOG BOOK
d. COPIES OF APPROVAL OF HT INSTALLATIONS
e. COPIES OF NOTICES FOR LT INSTALLATIONS
15
f. RELAYS TEST RECORDS
g. COPIES OF SOP'S FOR VARIOUS ELECTRICAL
WORKS
h. SHUTDOWN PROCEDURES
i. PERMIT TO WORK [RECORD]
j. TRANSFORMER OIL BDV, ACIDITY
k. RECORD OF CABLES WITH IR VALUES
A ELECTRICAL SECTION
1 a. PROVISION OF SUITABLE RATED SWITCH
b. PROVISION OF SUITABLE RATED STARTER
c. PROVISION OF PROPER BED FOR MOTOR AND GEAR
BOX
d. EFFECTIVENESS OF PROTECTIVE RELAYS IN THE
STARTER
e. PROVISION OF SUITABLE TYPE AND SIZE OF CABLES
f. PROPER TERMINATION AND GLADING OF CABLES
48
g. EARTHING OF SWITCH, STARTER AND MOTOR
h. PROVISION OF COUPLING GUARDS
i. PROVISION OF PULL CHORD SWITCHES
j. SUPPORTING OF CABLES ON CABLE TRAYS
k. INTERLOCKING AND SEQUENCE OF BELTS INCASE OF
MULTIPLE BELTS
l. PROVISION OF BELT SWAY SWITCHES
B MECHANICAL SECTION 14
ai DRIVE UNIT:
GENERAL INSTALLATION,
SUFFICIENT SPACE AROUND THE DRIVE HEAD FOR
INSPECTION AND MAINTENANCE OF BED, FOUNDATION
BOLTS, ETC.
EFFECTIVENESS THRUSTER BREAKS,
FLUID COUPLING WITH FUSIBLE PLUG, 8
VIBRATION OF EQUIPMENT,
OIL LEAKAGES,
RUBBER LAGGING ON DRUMS,
OIL GUAGE BREATHER ON GEAR BOX,
FIRE FIGHTING EQUIPMENT
ii DISPLAY OF TECHNICAL SPECIFICATIONS,
DATE OF INSTALLATIONS,
SCHEDULE MAINTENANCE, 2
GRADES OF OILS AND GREASE RECOMMENDED
iv ADEQUATE LIGHTING
NEAR DRIVE HEAD, DISCHARGE AND TAIL END DRUM
ALONG THE CONVEYOR BELTS 2
38 th Mines Safety Week Observance - 2023
b BELTS SECTION, IDLERS, ETC 22
i STRAIGHTNESS OF SECTION 2
ii SPACING AND ADEQUACY OF IDLERS AND RETURN 2
ROLLERS, PROVIION OF CUSHION ROLLERS AND SELF
ALIGNING ROLLERS WITH THEIR FREE MOVEMENT
GENERAL CLEANLINESS ALONG THE CONVEYOR CHUTES,
iii SPOIL PLATES AND THEIR EFFECTIVENESS TO PREVENT 2
SPILLAGES
CONDITION OF BELTS AND BELT JOINTS
iv CROSS OVER BRIDGES 2
v PROVISION OF FREE SPACEOF ONE METER BETWEEN 2
vi CONVEYOR SYSTEM AND THE SIDE FOR TRAVELLING 2
PURPOSE
MAINTENANCE CODES OF PRACTICE AND KEEPING
vii MAINTENANCE DOCUMENTATION 2
TRAINING IMPARTED TO THE WORKMEN OPERATING THE
viii MACHINERY 2
LAID OUT PROCEDURES TO STOP CONVEYORS
ix DISPLAY OF WARNING BOARDS / POSTERS AT TAIL END 2
x AND DRIVE HEADS 2
MEASURES TAKEN FOR PREVENTION OF SPILLAGES OF
xi MINERAL ALONG THE CONVEYOR / GANTRIES 2
c CRUSHER 16
i PERMANENCY OF ARRANGEMENTS FOR WETTING 10
AMTERIAL DUST AT THE BUNKER CHUTE OPENING,
LOADING POINTS AND TRANSFER POINTS
ii GUARD / FENCES ON MOVING PARTS, DRIVE UNIT 2
iii DUST PROOF CABIN FOR OPERATION OF THE CRUSHER 2
MAINTENANCE CODES OF PRACTICE AND KEEPING
iv MAINTENANCE DOCUMENTATION 2
A ENVIRONMENTAL MANAGEMENT 60
B HEALTH MANAGEMENT 30
C HEALTH MANAGEMENT 20
D SKILL MANAGEMENT 40
c SAFETY ANNOUNCEMENT/SPEECHES 10
c CLENLINESS OF MACHINERIES 4
C WITH IN WORKSHOP 20
c PARKING OF VEHICLES 4
b INRECPECT OF LOADING 5
c INRESPECT OF TRANSPORTATION 5
LK
&
PR
TA
AC
K,
T
IN
IC
TH
E
SAFETY
Hyderabad.
[under the aegis of Directorate General of Mines Safety]
th
38 Mines Safety Week Observance - 2023
Mines Audit - Evaluation Sheet (Group A / B / C)