MIN. 2270 mm ¬ ( )
F F
NOTES:
¶ 1070´ ± 2
EQUATOR
1. FOUNDATION LOADS ARE UNFACTORED. DESIGNER MUST SELECT APPROPIATE
LOAD COMBINATIONS ACCORDING TO CODE REQUIREMENTS.
2. LOADS CALCULATED ACCORDING TO: ASCE 7-10
3. FOUNDATION DESIGN DATA
PRODUCT SPECIFIC GRAVITY = 0.613 @ -10°C BUTANE / 0.560 @ +40.1°C BUTANE
WIND = 133 km/h / ASCE 7-10
0
00
(2) ANCHOR BOLTS
20
EARTHQUAKE = ASCE 7-10
=
ER
INTERNAL DESIGN PRESSURE = 1.323 MPa (14 Kg/cm2)
ET
AM
INTERNAL TEST PRESSURE = 1.82 MPa (18.55 Kg/cm2)
DI
E E
ER
SPHERE INSULATION = N/A
NN
I
COLUMNS FIREPROOFING = 105 mm
MIN. 50
4. MAXIMUM LOAD COMBINATION ON THE FOUNDATIONS MUST BE CONSIDERED FOR ITS DESIGN
120
AS WELL AS FOR THE ANCHORS AND FOR SHEAR STRESS CHECK ON THE FOUNDATIONS
115
6. FOR ADDITIONAL DETAILS SEE DRAWINGA3-106304-02021-01
7. ALL DIMENSIONS ARE IN mm. UNLESS OTHERWISE NOTED.
SPHERE ¶ 8. FOR ADDITIONAL DETAILS OF THE COLUMNS SUPPORTS SEE DRAWING A3-106304-02025-01
900´
(*) FINAL VALUE SHOULD BE DEFINED BY THE CIVIL WORK CONTRACTOR
D D
FOUNDATION DETAIL
(NOTES 5 & 6)
FOUNDATION LOADS
C C
PROJECT TITLE:
B
JORDAN LIQUEFIED PETROLEUM GAS MANUFACTURING
& FILLING COMPANY
EPC CONTRACTOR:
MID CONTRACTING
TETCO GROUP
CONSULTANT:
A
SUBCONTRACTOR:
8 7 6 5 4 3 Printing:06.11.2023 1