This document outlines a contingency plan for the production of a positive vibration advert with potential issues and solutions at four filming locations:
1) Bournemouth Beach - Weather may delay outdoor shooting, so book date based on forecast. Weather could already be suitable.
2) The College room - Book room in advance or use empty room to avoid delays from other activities.
3) College staff room - Ask about availability to avoid meetings/busy staff or use empty room.
4) Parkstone Road - Film at quiet times or incorporate traffic/people into shot to overcome noise issues from rain. Existing conditions could help the shot.
This document outlines a contingency plan for the production of a positive vibration advert with potential issues and solutions at four filming locations:
1) Bournemouth Beach - Weather may delay outdoor shooting, so book date based on forecast. Weather could already be suitable.
2) The College room - Book room in advance or use empty room to avoid delays from other activities.
3) College staff room - Ask about availability to avoid meetings/busy staff or use empty room.
4) Parkstone Road - Film at quiet times or incorporate traffic/people into shot to overcome noise issues from rain. Existing conditions could help the shot.
This document outlines a contingency plan for the production of a positive vibration advert with potential issues and solutions at four filming locations:
1) Bournemouth Beach - Weather may delay outdoor shooting, so book date based on forecast. Weather could already be suitable.
2) The College room - Book room in advance or use empty room to avoid delays from other activities.
3) College staff room - Ask about availability to avoid meetings/busy staff or use empty room.
4) Parkstone Road - Film at quiet times or incorporate traffic/people into shot to overcome noise issues from rain. Existing conditions could help the shot.
Name of Production: Positive Vibration Producers Name: Elias Acellam Contact Number: +44 7849 860423
Location / Potential problem Effect on production Control Measure Existing measures
scene Bournemouth Might be raining/weather Delay with advert Look at the weather forecast to Weather may already be sunny by Beach may not be up to production/may have to plan beach shooting date the time the shooting starts. (preferably standard (it may not be shoot first scene at a later accordingly so there will, along the sunny to fit the mood date, which may end up hopefully, be no issues. coast/shore). and happiness of the being too late. advert). The College. Room might be already Delay on the advert. Book the room in advance unless Room may already be empty and in use for a meeting or nobody is using it on the day of can be prepared to shoot the first lecture and we may not shooting. scene. be able to use said room for the first scene. College Staff Staff meeting may be Delay on advert shooting. Ask whenever the staff aren't doing Staff room could already be free Room. occurring or staff may be anything important in the room or with no meetings and not many staff busy with calls and when there aren't many staff in the room. paperwork during the members present in the room. time for shooting. Parkstone Road. May be too much May have to choose a new Go at a time where there are less The noise and people passing by the traffic/noise pollution if location for the shot. cars passing by and when there is location could help make the shot the shot was to have any clear weather to shoot outside. look more realistic with when the volume for the character is going to put the advert/rainy weather. headphones on them.