You are on page 1of 2

Contingency Plan

Name of Production: Positive Vibration Producers Name: Elias Acellam Contact Number: +44 7849 860423

Location / Potential problem Effect on production Control Measure Existing measures


scene
Bournemouth Might be raining/weather Delay with advert Look at the weather forecast to Weather may already be sunny by
Beach may not be up to production/may have to plan beach shooting date the time the shooting starts.
(preferably standard (it may not be shoot first scene at a later accordingly so there will,
along the sunny to fit the mood date, which may end up hopefully, be no issues.
coast/shore). and happiness of the being too late.
advert).
The College. Room might be already Delay on the advert. Book the room in advance unless Room may already be empty and
in use for a meeting or nobody is using it on the day of can be prepared to shoot the first
lecture and we may not shooting. scene.
be able to use said room
for the first scene.
College Staff Staff meeting may be Delay on advert shooting. Ask whenever the staff aren't doing Staff room could already be free
Room. occurring or staff may be anything important in the room or with no meetings and not many staff
busy with calls and when there aren't many staff in the room.
paperwork during the members present in the room.
time for shooting.
Parkstone Road. May be too much May have to choose a new Go at a time where there are less The noise and people passing by the
traffic/noise pollution if location for the shot. cars passing by and when there is location could help make the shot
the shot was to have any clear weather to shoot outside. look more realistic with when the
volume for the character is going to put the
advert/rainy weather. headphones on them.

You might also like