You are on page 1of 4

DESIGN INTEGRITY

All about Civil Engineering

Course Description

Course on: Estimation, Rate Schedule Analysis & BOQ of High-Rise RCC
Building.

Welcome to Course on Estimation, Rate Schedule Analysis & BOQ of High-Rise RCC Building using
Excel. It is focused on practical application of Estimation using M.S Excel. This course is a field-oriented
course and contains real examples and a full fledge 7-Storey real project for better understanding.
After successful completion of this course, you will be able to Estimate a complete RCC Building Project.

Software Use:
• AutoCAD
• MS Excel

Duration:
• Total duration: 1.5 Month
• Total 10 Class = 5 Weeks x 2 Class per Week x 2 Hours per Class = 20 Total Hours

Requirements for Attending the Course:

• To have Auto Cad and M.S Excel operating idea.


• To have the minimum understanding for Civil Quantity/Estimation
• To have a minimum understanding of construction processes.

For Registration: 01830438534 Facebook: Design Integrity


Course Outline
PART 01 – BASE & FOUNDATION WORK

1. Land Measurement

2. Earthwork:

• Earth cutting for foundation


• Earth filling for foundation
• Plinth earth filling e.t.c

3. Foundation work:

Pile Work:

• Boring/Drilling
• Removing of spoils
• Reinforced Calculation
• Reinforced Cement Concrete Work
• Breaking Head Calculation

Pile Cap Work:

• Earth work or Sand work


• Earth Filling or Sand Filling
• Brick Flat Soling(B.F.S)
• Cement Concrete work(C.C)
• Reinforced Calculation
• Reinforced Cement Concrete work

Shallow Foundation:

• Strip/Wall Footing
• Single Footing
• Combined Footing
• Mat Foundation

4. Under Ground Water Reservoir


• Earth work or Sand work
• Earth Filling or Sand Filling
• Brick Flat Soling (B.F.S)
• Cement Concrete work (C.C)
• Reinforced Calculation
• Water Stopper Calculation
• Reinforced Cement Concrete Wor

For Registration: 01830438534 Facebook: Design Integrity


5. Brick Flat Soling

6. Short Column (Below Plinth Level)


• Reinforced Calculation
• Formwork
• Reinforced Cement Concrete Work

7. Grade Beam
• Reinforced Calculation
• Formwork
• Reinforced Cement Concrete Work

PART 02- SUPER STRUCTURE WORK

8. Long Column
• Reinforced Calculation
• Formwork
• Reinforced Cement Concrete Work

9. Floor Beam & Lintel


• Reinforced Calculation
• Formwork
• Reinforced Cement Concrete work
• Lintels

10. Stair
• Reinforced Calculation
• Formwork
• Reinforced Cement Concrete work

11. Slab
• Reinforced Calculation
• Formwork
• Reinforced Cement Concrete work

12. Over Head Water Tank


• Reinforced Calculation
• Formwork
• Water Stopper Calculation
• Reinforced Cement Concrete work

For Registration: 01830438534 Facebook: Design Integrity


13. Masonry Work/Brick Work

14. Plastering and Pointing

15. Floor Finishing

16. Painting

PART 03-MAKING BILL OF QUANTITY

• Understanding Bill Of Quantity


• Making Bill Of Quantity

PART 04- RATE SCHEDULE ANALYSIS

In order to determine the rate of a particular item, the factors affecting the rate of that item are
studied carefully and then finally a rate is decided for that item. This process of determining the rates
of an item is termed as analysis of rates or rate analysis.

• To work out the actual cost of per unit of the items

• To work out the economical use of materials and processes in completing the particulars item.

• To work out the cost of extra items which are not provided in the contract bond, but are to be

done as per the directions of the department.

• To revise the schedule of rates due to increase in the cost of material

Find us:
📞 Call : 016339057691/01830438534 (For Registration)
Fb page: Design Integrity
Website: dil.com.bd
Blog: blog.dil.com.bd
LinkedIn: linkedin.com/company/dibd

For Registration: 01830438534 Facebook: Design Integrity

You might also like