Weather
ATTACHMENTS
TODAY’S ACTIVITIES
New Starters Complete pre-start cards - Controlled movements
PROMPT
Top 5 risks for the day Random on-site drug/alcohol - Beware hands / line of fire
SWMS specific and relevant Ensure positive comms - Look up/down/front/back
Sign onto the SWMS for activity Report incidents/near misses VMP in place – changes discussed
Sign onto Permits for activity Behavioural Safety Elements at daily Prestart meetings
Plant pre-start checks / 360° - Correct tool and PPE Community reminder
COMPANY / PERSON ACTIVITIES SEER / SAFETY
RESPONSIBLE ESSENTIAL
SEER no. ___________________
WGTP Work Force
□ Working at heights
40T Segment crane TBM 1: Stopped ready for breakthrough □ Working in & around mobile plant
40T Panel crane TBM 2: Demobing TBM/ demobing tunnel □ Working with temporary works
□ Working with live services
services.
□ Working with live traffic
Handling precast tunnel segments. □ Mobile cranes & lifting operations
□ Electrical Work
Handing precast panel segments.
Loading MSV’s.
Forklift works.
Manual handling.
General yard duties.
Telehandler works.
Driving MSV / TSP.
Housekeeping.
Dust suppression.
SEER no. ___________________
Trafiic Controllers / Ensure trucks follow VMP.
□ Working at heights
Security Ensure singed on to Damstra. □ Working in & around mobile plant
Direct traffic to right dirveways. □ Working with temporary works
□ Working with live services
All HV’s and LV’s are adhereing to the speed limit □ Working with live traffic
Ensure all trucks are have tapped on to Damstra □ Mobile cranes & lifting operations
□ Electrical Work
before proceeding through site.
SEER no. ___________________
Batch Plant Controlling batching operations both plants.
□ Working at heights
Maintaining both batch plants . □ Working in & around mobile plant
Taking bulk deliveries into batch plant silo’s. □ Working with temporary works
□ Working with live services
Controll filling of TBM product silo’s. □ Working with live traffic
Managing benonite batching. □ Mobile cranes & lifting operations
□ Electrical Work
Filling Iso cement tanks.
SEER no. ___________________
DIG 1 and DIG 2 Loading material with forklift on MSV.
□ Working at heights
Consumables delivery Delivering materials to DIG gantry. □ Working in & around mobile plant
Unloading material with gantry crane. □ Working with temporary works
□ Working with live services
Mantaining stock levels on the surface. □ Working with live traffic
Maintaing stock levels on the DIG gantries. □ Mobile cranes & lifting operations
□ Electrical Work
FEEDBACK / CONCERNS
Drivers must be out of the vehicle when unloading segments and engine is
turned off.
Ensure the gantry floodlight are turned off before power cycling with lights
on, the in rush of current when powering on trips the Control Board.
Inclement weather monitored by leading hand and filled into time sheet
folder.
Telehandler SWMS: WGT – 302 – 000 – SWM – CJH – 100 – 000 – 0004.
Tunnel Precast Handling on Surface: WGT – 302 – 000 – SWM – CJH – 100 – 000 – 0124.
Operation of MSV/VMS, TSP and Man rider: WGT – 302 – 000 – SWM – CJH – 100 – 000 – 0203.
Backend Works Gantries assembly on surface under 40t, 250t, portal crane. WGT – 302 – 000 – SWM
– CJH – 100 – 000 – 0266.
Gantry Crane Operation N.P 40t and 250t crane. WGT – 302 – 000 – SWM – CJH – 100 – 000 – 0052.
Operation of MEWP (Tunnel): WGT – 302 – 000 – SWM – CJH – 100 – 000 – 0205.