Weather
ATTACHMENTS
TODAY’S ACTIVITIES
New Starters Complete pre-start cards - Controlled movements
PROMPT
Top 5 risks for the day Random on-site drug/alcohol - Beware hands / line of fire
SWMS specific and relevant Ensure positive comms - Look up/down/front/back
Sign onto the SWMS for activity Report incidents/near misses VMP in place – changes discussed
Sign onto Permits for activity Behavioural Safety Elements at daily Prestart meetings
Plant pre-start checks / 360° - Correct tool and PPE Community reminder
COMPANY / PERSON ACTIVITIES SEER / SAFETY
RESPONSIBLE ESSENTIAL
SEER no. ___________________
WGTP Work force
□ Working at heights
TBM 1: Intervention □ Working in & around mobile plant
TBM 2: Cutting □ Working with temporary works
□ Working with live services
Unloading segments. □ Working with live traffic
Loading MSV’s. □ Mobile cranes & lifting operations
□ Electrical Work
Forklift works.
Manual handling.
General yard duties.
SEER no. ___________________
Trafiic Controllers / Ensure trucks follow VMP.
□ Working at heights
Security Driect traffic to right dirveways. □ Working in & around mobile plant
All HV’s and LV’s are adhereing to the speed limit □ Working with temporary works
□ Working with live services
Ensure all trucks are have tapped on to Damstra □ Working with live traffic
before proceeding through site. □ Mobile cranes & lifting operations
□ Electrical Work
SEER no. ___________________
Batch Plant Controlling batching operations both plants.
□ Working at heights
Maintaining both batch plants . □ Working in & around mobile plant
Taking bulk deliveries into batch plant silo’s. □ Working with temporary works
□ Working with live services
Controll filling of TBM cement silo’s. □ Working with live traffic
Managing benonite batching. □ Mobile cranes & lifting operations
□ Electrical Work
SEER no. ___________________
□ Working at heights
□ Working in & around mobile plant
□ Working with temporary works
□ Working with live services
□ Working with live traffic
□ Mobile cranes & lifting operations
□ Electrical Work
711688683.docx ABN 79 385 373 351 Page 2 of 6
Saturday 30th July – Monday 1st Aug 2022 - Tunnel Zone - Pre-Start
Please send to Safety Admin within 24hrs
SEER no. ___________________
□ Working at heights
□ Working in & around mobile plant
□ Working with temporary works
□ Working with live services
□ Working with live traffic
□ Mobile cranes & lifting operations
□ Electrical Work
SEER no. ___________________
□ Working at heights
□ Working in & around mobile plant
□ Working with temporary works
□ Working with live services
□ Working with live traffic
□ Mobile cranes & lifting operations
□ Electrical Work
SEER no. ___________________
□ Working at heights
□ Working in & around mobile plant
□ Working with temporary works
□ Working with live services
□ Working with live traffic
□ Mobile cranes & lifting operations
□ Electrical Work
SEER no. ___________________
□ Working at heights
□ Working in & around mobile plant
□ Working with temporary works
□ Working with live services
□ Working with live traffic
□ Mobile cranes & lifting operations
□ Electrical Work
SEER no. ___________________
□ Working at heights
□ Working in & around mobile plant
□ Working with temporary works
□ Working with live services
□ Working with live traffic
□ Mobile cranes & lifting operations
□ Electrical Work
SEER no. ___________________
□ Working at heights
□ Working in & around mobile plant
□ Working with temporary works
□ Working with live services
□ Working with live traffic
□ Mobile cranes & lifting operations
□ Electrical Work
FEEDBACK / CONCERNS
Drivers must be out of the vehicle when unloading segments and engine is
turned off.
Ensure the gantry floodlight are turned off before power cycling with lights
on, the in rush of current when powering on trips the Control Board.
250T crane all good to use. Bar is only there for 125T crane lifts and is to
be removed next service.
Inclement weather monitored by leading hand and filled into time sheet
folder.
ATTENDANCE
By signing on to this Prestart attendance you confirm that you are free from the effects of fatigue,
alcohol and other drugs:
1. I am free from Alcohol and Drugs
2. I have not worked, in combination, more than 13 consecutive days at this or any other workplace
3. I have not worked more than 12hours prior and have had a minimum of 10-hour break between
rostered shifts
You must read, understand & sign onto the SWMS for your task prior to the commencement of work.