60.3mm in diameter and 1.5~3.5mm in wall thickness ,square tube:15×15--50×50mm with thickness 1.5-
3.0mm and other deformed pipes of the corresponding size. Adopting roll pass design, the production line
can manufacture welded steel pipes with good quality machining and high precision assembling.
4) 车间要求:workshop require:
厂房高(从天车轨道上面到地面距离)应大于 5m,跨度 8m,长度 60m。
8m wide, 60m long, at least 5m high from Ceiling Rails to Ground.
2. 生产工艺:Product process:
带钢卷料→开卷→剪切对焊→活套储料→成型、高频焊接、水冷、焊缝抛光、定径、粗矫直→锯切
定尺→检查收集→打包→入库。
Coil Loading → Uncoiling →Cutting and Welding →cage Accumulator → Forming, HF welding,
1. This machine is used between the shearing butt welding machine of the welded pipe production line
and the mainframe (forming sizing machine). Its function is to run out of the previous strip, and the next
strip is prepared from The continuous production of the main machine (forming sizing machine) is
ensured within a time and sufficient strip steel is stored.
2. This machine is mainly composed of feeding guide roller frame, clamp feeding device, looper body
3. Clamp feeding device: It is mainly composed of a frame, a motor, a brake, a universal drive shaft of
a reducer, a pinch roller, and a guide roller pneumatic system. It can feed the steel belt into the looper.
When the feeding needs to stop, the brake It can stop the motor and the clamp feeding roller from
rotating, and the electric motor's rotation speed and feeding speed can be adjusted by the electric control
device.
4. Accumulator body assembly: It is mainly composed of motor, machine base, inner circumferential
roller, center discharge roller, outer ring roller and pressure roller, etc. It can store the strip steel sent by
the clip feeding device and can be from the center The discharge roller is withdrawn.
5. Discharging device: It consists of a bracket, a guide roller group, an upper and lower lead-out roller,
and a speed measuring device. It can horizontally introduce the steel belt stored in the looper body into
Accumulator
4 meter
diameter
水平辊调整方式,手动调整,
Horizontal roll up and down adjust way,manual adjust
特点
水平辊下轴活动的,固定端配有补偿垫
leveling roll lower shaft is active,leveling shaft fix side with compensate pad
水平辊架数量 Horizontal stand quantity 7
水平辊轴直径 Horizontal shaft diameter 65mm
水平辊轴材质 Horizontal shaft material 40Cr
技术参数
成型速度 forming speed 50-100m/min
成型电机 motor DC 90Kw
Technical
水平机架材质 leveling stand material steel plate welding 钢板焊接
parameters
立辊架数量 vertical stand quantity 7
立辊轴直径 vertical shaft diameter 40mm
立辊轴材质 vertical shaft material 40Cr
3.6 焊缝导向,挤压辊和焊接刮疤:Weld seam guide and squeeze roll stand, welding bead cutter:
挤压辊是为了挤压加热到焊接温度的管子的边缘,通过挤压辊施加一定的压力来达到焊接的
目的。焊缝刮疤刀用于焊缝刮疤,去除外毛刺。它由两种刀具组成,交替使用。如果一个被损坏了,
另一个将会替换使用。刮疤刀可以调整,并通过凸轮快速换刀。在刀架下有两个支撑辊,以承受刮
擦的透支。刮疤后有一个水平机架用来磨光。
Squeeze roller is to squeeze the edge of the tube which has been heated to welding temperature, by
squeezing rolls giving a certain pressure to achieve welding purpose. Weld bead cutter is used to scrap
weld seam and remove external burr. It is made up of two cutters for using alternately. If one is damaged,
the other one will take the place to scrap. Scrapers can be adjusted and have the quick lift function by cam.
There are two supporting roller underneath knife rest, in order to bear the overdraft of scraping. and after
the bead cutter with one horizontal stand for polish.
kinds of frame tube automatically. Concerning to using high accurate STD control system and
machinery system, this unit has the good precisely dimension advantage, and the machinery transfer best
advantage, so the quickly ability and accurate processing, without Burr is this unit advantage.
Round pipe:φ17.2-φ60.3mm
Thickness: 1.5-3.5mm
Pipe size
Square pipe:15x15-50x50mm
Thickness:1.5-3.0mm
Material Q235.
Speed Max. 100m/min
Pipe end burr No burr(less than 0.2mm)
Cutting Length 4-12m
Precision ±1.5mm
Drive motor 15kw servo motor (yaskawa)
Feeding motor 4.4kw servo motor (yaskawa)
用于输送储存锯切后的钢管,并打钢管送到打包机。辊道为“V”型轧道,翻料结构为电动翻料。
It is used to transport and store the sawed steel pipe, and to drive the steel pipe to the packing line. The
roller table is a "V" type roller table, and the turning structure is electric turning.
3.13 模具 :roller
成型辊材质 Forming roller Material Cr12
焊接辊材质 welding roller material H13
热处理硬度 Heat treatment hardness HRC58~62
4. PRICE (EX-Works Price)
No. Name Qty Unit Price (USD)
1 双锥手动开卷机 double cone uncoiler 1 set 6,000
2 自动剪切对焊机 automatic shear welder 1 set 8,500
3 盘式活套 horizontal accumulator 1 set 30,700
4 喂入导向装置 feeding guide unit 1 set
5 成型机 forming machine 1 set
焊缝导向,挤压辊和焊接刮疤:
6 Weld seam guide stand and the squeeze roll stand, 1 set
70,000
welding bead cutter:
7 冷却水槽:Water cooling unit: 1 set
8 定径机 sizing machine 1 set
9 齿轮箱 gear box 1 set
10 Cold saw 冷锯 1 set 60,000
200kw 固态高频 200kw solid high frequency welder 1 set
11 30,800
拖动系统 Drive system 2 sets
12 下料辊道 runout table 12m set 5,200
Note: The price of rollers shall be calculated by weight, Unit price is 6,250 USD/Tons
5. 售后服务和质保期 Warranty
设备到达需方后,派技术服务人员在现场进行调试、保养服务,提供设备试运行、调试、操作及
维护的指导,负责对需方的设备操作和维护人员进行技术培训。在用户遵守使用规则、正常操作设
备情况下,自设备到货之日起 12 个月内,如确因质量不良影响使用、发生零件损坏导致设备无法
正常工作,制造厂将无偿的给予修理或更换。
When the production line is delivered to the demander, our commissioning engineers will be
responsible for guiding the demander fulfill the installation, commissioning, operation and maintenance
of the line and training the demander’s workers how to operate and maintain the line.Under the premises
that the demander’s workers comply with operation principles and the line is running in correct
conditions, if the line is really unable to run normally due to product quality problem or broken
components within 12 months after the delivery of the line is finished, the producer of the line will fix
the line or change the broken components without the demander paying anything.
设备调试期一个月,买方需支付卖方调试人员每人每天 100 美金,(一般调试人员为 3 人)
负责签证,往返机票的费用,并提供调试人员在其当地的食宿,交通等费用。因为客户原因,导致
调试期延长,超过一个月的部分,买方需付调试人员每人每天 120 美金。
The buyer should pay for the engineer USD 100.00 one person one day(during one month),and supply the
visa cost, round air tickets, local cost such as the food, hotel and others.
Due to the buyer responsibility, delay the debugging time, the delay time, buyer should pay for the
engineer USD 120.00 one person one day.
6. 提供的技术文件 Technical Document Provided
1)机组使用说明书(交货前一个月提供) 1份
Instruction Manual of Pipe Mill (provided at the time of a month before delivery time)
2)出厂检验合格证(交货时提供) 1份
Inspection Certificate (provided at the delivery time)
3)装运清单(交货时提供) 1份
Loading Order (Provided at the delivery time)
4)平面布置图 (交货前一个月提供) 1份
Layout Drawing (provided at the time of a month before delivery time)
5)地基图 (交货前一个月提供) 1份
Ground Base Drawing (provided at the time of a month before delivery time)
6)电气原理图 1份
Electrical Principle Diagram
7)各单机总装配图 1份
Overall Assembly Drawing of every unit of the line
8)易损件的零件图 1份
Part Diagram of Vulnerable Parts