MATERIAL SPECIFICATIONS COMPARISON MATRIX

PROJECT NAME : DAVAO CITY BYPASS CONSTRUCTION PROJECT PHASE 1-1, STA12+800 TO STA23+500,
PHASE 1, FUNDED UNDER JICA LOAN AGREEMENT NO PH-261 AND SUPPLEMENT LOAN
LOCATION : DAVAO
CONSTRUCTION PACKEGF No : PH1-1
CONSTRUCTION NAME : SHIMIZU-ULTICON-TAKENAKA JV
ADDRESS : 2F YUTA@DABAW BUILDING, PUROK 38, C.P.GARCIA HI-WAY, MAA, DAVAO CITY, PHILIPPINES
DELIVERY SCHEDULE : _______________________________________
WARRANTY : NEXCO Central Philippines, Inc.

651(1) Network Communication System (1/2)


Remarks
Specification Reference
Technical
No. Item Proposed Material Specification Engineer's Remarks
Compliance Comply with contract
(specs section/numeric and alphabet designation)
specifications

Fire Hose Cabinet

1 Cabinet A and B

1.1 Dimension Not more than 1,780 x 300 x 1040 1400 x 300 x 1100 JIS, ISO Comply with contract specifications

1.2 Material SUS 304 with Thickness of not less than 1.5mm thick SUS 304, 1.5mm thick JIS, ISO Comply with contract specifications

1.3 Color Red Red JIS, ISO Comply with contract specifications

2 Hose

2.1 Working Pressure

2.2 Material

2.3 Length

2.4 Nominal Diameter


651(1) Network Communication System (2/2)
Remarks
Specification Reference
Technical
No. Item Proposed Material Specification Engineer's Remarks
Compliance Comply with contract
(specs section/numeric and alphabet designation)
specifications

Fire Hose Cabinet

1 Cabinet A and B

1.1 Dimension Not more than 1,780 x 300 x 1040 1400 x 300 x 1100 JIS, ISO Comply with contract specifications

1.2 Material SUS 304 with Thickness of not less than 1.5mm thick SUS 304, 1.5mm thick JIS, ISO Comply with contract specifications

1.3 Color Red Red JIS, ISO Comply with contract specifications

2 Hose

2.1 Working Pressure

2.2 Material

2.3 Length

2.4 Nominal Diameter