Within this letter, we intend to confirm data regarding Cooler heat duty (AC)
BADAK -AFE222101
SKID AG23186
HEAT DUTY
CASE 1: 650 Psig to 1800 Psig
STAGE 1:
MASS: 21,426 lb/hr (10 MMSCFD)
CP: 0,623 btu/lb F
dT: 286-120 = 166
Heat duty: M x CP x dT = 2.215.834 Btu/Hr
IC Heat duty: Heat duty x 110% = 2.215.834 x 1,1 = 2.437.417 btu/hr
AXH: 2.517.224 btu/hr
Summary: AXH Cooler comply to 110% margin
Yours Sincerely,
PT NASCENA ATHUR HALASSON
Harry Situmorang
Project Manager