You are on page 1of 1

November 1st, 2023

To Our Respectful End user


PT Pertamina

Within this letter, we intend to confirm data regarding Cooler heat duty (AC)

BADAK -AFE222101
SKID AG23186

HEAT DUTY
CASE 1: 650 Psig to 1800 Psig
STAGE 1:
MASS: 21,426 lb/hr (10 MMSCFD)
CP: 0,623 btu/lb F
dT: 286-120 = 166
Heat duty: M x CP x dT = 2.215.834 Btu/Hr
IC Heat duty: Heat duty x 110% = 2.215.834 x 1,1 = 2.437.417 btu/hr
AXH: 2.517.224 btu/hr
Summary: AXH Cooler comply to 110% margin

CASE 2: 700 Psig to 1800 Psig


STAGE 1:
MASS: 25,619 lb/hr (10 MMSCFD)
CP: 0,5084 btu/lb F
dT: 275-120 = 155
Heat duty: M x CP x dT = 2.018.828 Btu/Hr
IC Heat duty: Heat duty x 110% = 2.018.828 x 1,1 = 2.220.710 btu/hr
AXH: 2.332.008 btu/hr
Summary: AXH Cooler comply to 110% margin

Yours Sincerely,
PT NASCENA ATHUR HALASSON

Harry Situmorang
Project Manager