Days P_DT Reason
Over feed
Moisture
Vehicle Operator
3/5/2018 24.00
3/6/2018 1.20 9.88
3/7/2018 2.00 4.25 1.00
3/8/2018 4.84 1.00 3.00
3/9/2018 3.82 1.00 2.00 6.00 Weight Feeder
3/10/2018 3.25 2.84 1.00
3/11/2018 0.59 1.00
Total_DT 5.84 16.95 33.88 1.00 6.00 3.00 0.00 6.00 72.67
%_O_DT 8.04 23.32 46.62 1.38 8.26 4.13 0.00 91.74
Total% 3.48 10.09 20.17 0.60 3.57 1.79 0.00 39.68
Total_Production= 2052.519 Total R_Hour = 95.33
Targate_Production= 4200.000 Targate R_Hour= 168.00 Needed Output For targate = 25.00
Differance + - -2147.481 Differance + - -72.67 currently output is = 21.77
% Differance -51.13 % Differance -43.26
Mill_Performance Day_B_Day
Days R_Hour ProductionMT) OutPut Comments:-
3/5/2018 0.00 0.000 0.00
3/6/2018 11.92 275.563 23.12
3/7/2018 15.75 349.239 22.17
3/8/2018 16.16 361.922 22.40
3/9/2018 11.18 252.541 22.59
3/10/2018 17.91 360.553 20.13
3/11/2018 22.41 452.701 20.20
Total 95.33 2052.519 21.77
Cement Mill (All Time In Hours)
Material_Short Process Planed_Down Un_P_Down
Under Voltage
By Mechenical
lacking Resourcelessness
By Mechenical
Power Cut
Mill Load
By Electrical
Meterial Jam
By Electrical
Circuit Jam
Days P_DT Reason
Over feed
Moisture
Vehicle Operator
R_Mix_Powder Shortage
Jam(Discharge/Feed)
Jam(Discharge/Feed)
Jam(Discharge/Feed)
DT_Mechenical
DT_Mechenical
DT_Mechenical
Days Other
DT_Electrical
DT_Electrical
DT_Electrical
Power cut
Power cut
Power cut
3/5/2018 4.00 4.00 4.00 50.25
3/6/2018 54.00
3/7/2018 4.25 4.25 4.25 21.00
3/8/2018 2.00 2.00 2.00 14.00
3/9/2018 6.00 6.00 6.00 36.00
3/10/2018 1.62 1.00 1.62 1.00 1.62 1.00 8.00
3/11/2018 1.42 1.42 1.42 4.36
Total_DT 15.29 1.00 0.00 1.00 0.00 15.29 1.00 187.61 221.19