You are on page 1of 4

Raw Mill (All Time In Hours)

Material_Short Process Planed_Down Un_P_Down

Under Voltage

By Mechenical
lacking Resourcelessness

By Mechenical
Power Cut
Mill Load

By Electrical
Meterial Jam

By Electrical
Circuit Jam
Days P_DT Reason

Over feed

Moisture
Vehicle Operator

3/5/2018 24.00
3/6/2018 1.20 9.88
3/7/2018 2.00 4.25 1.00
3/8/2018 4.84 1.00 3.00
3/9/2018 3.82 1.00 2.00 6.00 Weight Feeder
3/10/2018 3.25 2.84 1.00
3/11/2018 0.59 1.00
Total_DT 5.84 16.95 33.88 1.00 6.00 3.00 0.00 6.00 72.67
%_O_DT 8.04 23.32 46.62 1.38 8.26 4.13 0.00 91.74
Total% 3.48 10.09 20.17 0.60 3.57 1.79 0.00 39.68
Total_Production= 2052.519 Total R_Hour = 95.33
Targate_Production= 4200.000 Targate R_Hour= 168.00 Needed Output For targate = 25.00
Differance + - -2147.481 Differance + - -72.67 currently output is = 21.77
% Differance -51.13 % Differance -43.26
Mill_Performance Day_B_Day
Days R_Hour ProductionMT) OutPut Comments:-
3/5/2018 0.00 0.000 0.00
3/6/2018 11.92 275.563 23.12
3/7/2018 15.75 349.239 22.17
3/8/2018 16.16 361.922 22.40
3/9/2018 11.18 252.541 22.59
3/10/2018 17.91 360.553 20.13
3/11/2018 22.41 452.701 20.20
Total 95.33 2052.519 21.77
Cement Mill (All Time In Hours)
Material_Short Process Planed_Down Un_P_Down

Under Voltage

By Mechenical
lacking Resourcelessness

By Mechenical
Power Cut
Mill Load

By Electrical
Meterial Jam

By Electrical
Circuit Jam
Days P_DT Reason

Over feed

Moisture
Vehicle Operator

3/5/2018 2.00 4.00 5.67


3/6/2018 20.00
3/7/2018 1.00 4.25 5.00 Diaphragm Choke
3/8/2018 2.00 2.00 2.00
3/9/2018 1.57 6.00 1.00
3/10/2018 1.62 9.80 Diaphragm Choke
3/11/2018 1.42 12.00
Total_DT 6.57 19.29 20.00 0.00 0.00 0.00 8.67 0.00 0.00 12.00 0.00 14.80 0.00 81.33
%_O_DT
%Total 3.91 11.48 0.00 0.00 0.00 5.16 0.00 8.81 29.36
Total_Production= 1043.177 Total R_Hour = 86.67
Targate_Production= 2625.000 Targate R_Hour= 168.00 Needed Output For targate = 15.63
Differance + - -1581.823 Differance + - -81.33 currently output is = 12.04
% Differance -60.26 % Differance -48.41
Mill_Performance Day_B_Day
Days R_Hour ProductionMT) OutPut Comments:- No Any down time by Vehicle & Operators
3/5/2018 12.33 143.902 11.67
3/6/2018 4.00 44.302 11.08 0
3/7/2018 13.75 171.205 12.45
3/8/2018 18.00 229.018 12.72
3/9/2018 15.43 188.371 12.21
3/10/2018 12.58 156.965 12.48
3/11/2018 10.58 109.414 10.34
Total 86.67 1043.177 12.04

VSK (The Main Production Point)


VSK 1 VSK 2 VSK 3

R_Mix_Powder Shortage
Jam(Discharge/Feed)

Jam(Discharge/Feed)

Jam(Discharge/Feed)
DT_Mechenical

DT_Mechenical

DT_Mechenical
Days Other

DT_Electrical

DT_Electrical

DT_Electrical
Power cut

Power cut

Power cut
3/5/2018 4.00 4.00 4.00 50.25
3/6/2018 54.00
3/7/2018 4.25 4.25 4.25 21.00
3/8/2018 2.00 2.00 2.00 14.00
3/9/2018 6.00 6.00 6.00 36.00
3/10/2018 1.62 1.00 1.62 1.00 1.62 1.00 8.00
3/11/2018 1.42 1.42 1.42 4.36

Total_DT 15.29 1.00 0.00 1.00 0.00 15.29 1.00 187.61 221.19

Tagate Production = 2310.000


VSK_Performance Day_B_Day (OutPut_Factor(5.00 MT/Hour)) Total_Production = 1204.050
VSK 1 VSK 2 VSK 3 DiFF+- % = -47.88
Days RH Production RH Productin RH Production STD_RH= 22.00
3/5/2018 5.25 26.250 5.25 26.250 4.58 22.900 Total_SD_RH= 66.00
3/6/2018 6.50 32.500 6.50 32.500 6.50 32.500 Per_Week_SDRH= 462.00
3/7/2018 13.50 67.500 9.67 48.350 11.25 56.250 VSK 1_RH= 82.50
3/8/2018 15.67 78.350 15.33 76.650 15.33 76.650 VSK 2_RH = 78.66
3/9/2018 10.08 50.400 10.08 50.400 10.08 50.400 VSK 3_RH = 79.65
3/10/2018 15.25 76.250 15.58 77.900 15.66 78.300 Total_/Week_RH= 240.81
3/11/2018 16.25 81.250 16.25 81.250 16.25 81.250 DiFF+- -221.19
Total 82.50 412.500 78.66 393.300 79.65 398.250 DiFF+- % -47.88