You are on page 1of 65

GENERAL NOTES:

SEA WORLD ORLANDO


1. THE PROPOSED PROJECT LIMITS LIES WITHIN THE LEGAL
DESCRIPTION OF LOTS 1 AND 2, SEA WORLD THEME PARK AS
TABLE OF CONTENTS
RECORDED IN PLAT BOOK "E", PAGE 22 OF THE PUBLIC SHEET NO. TITLE
RECORDS OF ORANGE COUNTY, FLORIDA. PROJECT LIMITS G000 COVER SHEET
ALSO LIE WITHIN THE VALENCIA WATER CONTROL DISTRICT G001 AERIAL PLAN
EASEMENT AS ORIGINALLY RECORDED IN OFFICIAL RECORDS G002-G003 RECORDED PLAT AND C-5 CANAL WARRANTY DEED
BOOK 2593, PAGES 1260-1284 AND LATER REVISED IN OFFICIAL
G004-G005 SURVEY
RECORDS BOOK 5168, PAGE 3594 OF THE PUBLIC RECORDS OF
C100 KEY PLAN
ORANGE COUNTY, FLORIDA. SEE THIS SHEET FOR SITE

PROJECT STARBOARD
LOCATION MAP AND PARCEL ID NUMBERS. C101-C102 SITE PLAN
C201-C202 GRADING AND DRAINAGE PLAN
2. SEE THIS SHEET FOR OWNER INFORMATION. C301-C302 UTILITY PLAN

3. SEE SHEET G001 FOR AERIAL PHOTOGRAPHY.


A0.000 SITE PLAN
4. SEE SHEETS G002 AND G003 FOR ORIGINAL PLAT AND A0.001 LEVEL 1 FLOOR PLAN
VALENCIA WATER CONTROL DISTRICT EASEMENT WARRANTY A0.001.5 LEVEL 1.5 FLOOR PLAN
DEED. A0.002 LEVEL 2 FLOOR PLAN

I-DRIVE DISTRICT PLAN


A0.003 LEVEL 3 FLOOR PLAN
5. SEE SHEETS C101 AND C102 FOR LIMITS OF CONSTRUCTION.
A0.004 LEVELS 4-7 FLOOR PLANS
THERE IS NO PROPOSED PHASING FOR THIS PROJECT.
A0.005 LEVELS 8-11 FLOOR PLANS
6. SEE SHEETS G004 AND G005 FOR SURVEY OF EXISTING A0.006 LEVELS 12-15 FLOOR PLANS
CONDITIONS. A0.007 ELEVATIONS
A0.008 ELEVATIONS

PARCEL ID# 12-24-28-7874-00-010


7. SEE SHEETS G004 AND G005 FOR LAND USES.

8. THERE ARE NO DEVIATIONS OR WAIVERS PROPOSED. L1.00 OVERALL TREE REMOVAL PLAN
L1.01-L1.09 TREE REMOVAL PLAN

PARCEL ID# 12-24-28-7874-00-020


9. SEE SHEET C100 FOR OVERALL SITE PLAN AND KEY SHEET. L1.30 TREE REMOVAL SCHEDULE & CALCULATIONS
SEE SHEETS C101 AND C102 FOR PROPOSED SITE PLAN.
L2.00 OVERALL LANDSCAPE PLAN
L2.01-L2.09 LANDSCAPE PLAN
10.PRELIMINARY SUBDIVISION PLAN: NOT APPLICABLE.
L2.20-L2.22 LANDSCAPE DETAILS

PARCEL ID# 12-24-28-7874-00-021


11. STREET TYPES PLAN: NOT APPLICABLE. L2.30 TYPICAL PLANTING SCHEDULE
L3.00 MASTER SIGN PLAN
12. SEE SHEET A0.000 FOR PROPOSED BUILDING LOCATION AND L3.20 MASTER SIGN PLAN DETAILS
SQUARE FOOTAGE. SEE SHEET A0.007 AND A0.008 FOR L4.00 OPEN SPACE PLAN

PARCEL ID# 12-24-28-0000-00-004


BUILDING HEIGHT.
LD9.01 LEGEND AND NOTES
13. SEE SHEET A0.000 FOR BUILDING TABLE OF USES. LD9.50 OVERALL PHOTOMETRIC SITE
LD9.52 SITE PHOTOMETRICS AREA 02
14. SEE SHEETS A0.007 AND A0.008 FOR BUILDING ELEVATIONS.
LD9.53 SITE PHOTOMETRICS AREA 03
LD9.55 SITE PHOTOMETRICS AREA 05
15. THERE ARE NO WETLANDS ONSITE.
LD9.56 SITE PHOTOMETRICS AREA 06
LD9.57 SITE PHOTOMETRICS AREA 07
PREPARED FOR: LD9.58
LD9.59
SITE PHOTOMETRICS AREA 08
SITE PHOTOMETRICS AREA 09
LD9.60 SITE PHOTOMETRICS BRIDGE
PROJECT ARCHITECT LD9.81 LUMINAIRE CUTSHEETS
LD9.82 LUMINAIRE CUTSHEETS
LD9.83 LUMINAIRE CUTSHEETS
LD9.84 LUMINAIRE CUTSHEETS
LD9.85 LUMINAIRE CUTSHEETS

191 PEACHTREE STREET NE, SUITE 2400


ATLANTA, GA 30303-1770
TEL. 404.237.2000
www.coopercarry.com

S.R. 528 (BEE LINE EXPY)

LANDSCAPE ARCHITECT

INTERSTATE I-4
T W O O D BL V D
ES
W

AQUATICA
OR DRIVE
RB
HA
A
SE
SEAWORLD

IN
800 N. ORANGE AVENUE, SUITE 300

TE
r
u
ORLANDO, FL 32801

RN
12-24-28-7874-00-020
TEL. 407.425.3330

AT IO
www.edsaplan.com 12-24-28-0000-00-004
SITE LOCATION

N
Sea World of Florida LLC

A L DRIVE
CEN
TRAL
CIVIL ENGINEER d/b/a SeaWorld Orlando FL 12-24-28-7874-00-010
OR
7007 Sea World Drive IDA
PA
Orlando FL 32821 RK
WA
Y 12-24-28-7874-00-021
PHONE: (314) 613-6063
LOCAL OFFICE:
FAX: (314) 613-6069 DISCOVERY
482 SOUTH KELLER RD Email: Brian.Andrelczyk@SeaWorld.com COVE
ORLANDO, FL 32810
TEL. 407.647.7275
FAX. 407.806.4500
www.atkinsrealis.com PARKING DATA
USE REQUIREMENT REQUIRED SPACES PROVIDED SPACES
SURVEYOR HOSPITALITY 1 SPACE/1.5 ROOM 336 747

PARKING NOTES:
1. ALL PARKING SPACES ARE PROVIDED IN THE PARKING STRUCTURE.
2. PER SEC. 38-866 C. (3) MAXIMUM ALLOWABLE VEHICULAR SPACES, THERE IS NO CAP ON STRUCTURED
PARKING SPACES.

604 Courtland Street, Suite 101, Orlando, FL 32804


FLOOD ZONE:
PHONE: (407)960-5980 FAX: (407)960-5984
Certificate of Authorization: LB2936 By DRC Office at 9:45 am, Dec 14, 2023 THE PROJECT SITE LIES IN FLOOD ZONE "X" AREAS OF 0.2% ANNUAL CHANCE OF FLOODING WITHOUT BASE SITE LOCATION MAP
www.carnahan-proctor.com FLOOD ELEVATION AS PER FEDERAL EMERGENCY MANAGEMENT AGENCY FLOOD INSURANCE RATE MAP NO.
12095C0415F, MAP REVISED 09/25/2009. Scale: 1"=1000'
PLOT DATE: 3/30/2023 11:33 AM
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\M2\85256-xr-ID-Border.dwg
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LOCAL OFFICE:
482 SOUTH KELLER RD
ORLANDO, FL 32810
TEL. 407.647.7275
FAX. 407.806.4500
www.atkinsrealis.com
L

L
K

K
J

J
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023
H

H
G

G
PROJECT BOUNDARY

INTERNATIONAL DRIVE (120' R/W)


F

F
DISTRICT C-5 CANAL (120' WIDTH)
VALENCIA WATER CONTROL
SITE BOUNDARY
E

E
PROJECT STARBOARD
IDD PACKAGE
D

D
GATE 3

) 7007 SeaWorld Dr, Orlando, FL 32821


R/W
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\G001 AERIAL.dwg

(120' ♦
AY
C

C
K W
A PAR SEAWORLD
FLORID
AL
NTR
CE AERIAL PLAN
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 8:49 AM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
G001
A

A
0 50' 100'

SCALE: 1" = 100'

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LOCAL OFFICE:
482 SOUTH KELLER RD
ORLANDO, FL 32810
TEL. 407.647.7275
FAX. 407.806.4500
www.atkinsrealis.com
L

L
K

K
J

J
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023
H

H
G

G
F

F
E

E
PROJECT STARBOARD
IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\G002-3 PLAT.dwg

ORIGINAL PLAT PAGE ONE ORIGINAL PLAT PAGE TWO ♦


C

C
01 02
SCALE: NTS SCALE: 1" = 400'
SEAWORLD

RECORDED PLAT AND C-5


CANAL WARRANTY DEED
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 8:49 AM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
G002
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LOCAL OFFICE:
482 SOUTH KELLER RD
ORLANDO, FL 32810
TEL. 407.647.7275
FAX. 407.806.4500
www.atkinsrealis.com
L

L
K

K
J

J
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023
H

H
G

G
F

F
E

E
PROJECT STARBOARD
IDD PACKAGE
D

D
WARRANTY DEED FOR 7007 SeaWorld Dr, Orlando, FL 32821
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\G002-3 PLAT.dwg

ORIGINAL PLAT PAGE THREE RE-ALIGNMENT OF C-5 CANAL ♦


C

C
01 02
SCALE: NTS SCALE: NTS SEAWORLD

RECORDED PLAT AND C-5


CANAL WARRANTY DEED
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 8:49 AM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
G003
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LOCAL OFFICE:
482 SOUTH KELLER RD
ORLANDO, FL 32810
TEL. 407.647.7275
FAX. 407.806.4500
www.atkinsrealis.com
L

L
K

K
J

J
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023
H

H
G

G
F

F
E

E
BE

FOC

RW

SS

D
G

COMM

PROJECT STARBOARD
IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\G004-5 SURVEY.dwg

D-1 ♦
C

C
SEAWORLD
D-2

EXISTING CONDITIONS
PLAN - NORTH
B

B
SALT WATER POND

HORTICULTURE

R. A. Rivera 100085256
BUILDING

ELEC Designed By: Project No.


PANEL
C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 8:49 AM

Approved By: Date

J. P. Woods
A/C

Checked By:
TRANS

B. E. Noyes
Drawn By:
G004
A

A
D-3
0 25' 50'

MATCH LINE - SEE SHEET G005 SCALE: 1" = 50'


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCH LINE - SEE SHEET G004


LOCAL OFFICE:
482 SOUTH KELLER RD
ORLANDO, FL 32810

ELEC
BOX
OLD
ELEC GAS TEL. 407.647.7275
ELEC VAULT
VAULT
PANEL METER D-5 FAX. 407.806.4500

15" PVC
15 P
EB "R RC
15"
PV
CP
24
" www.atkinsrealis.com
C
L

L
ELEC. D-10 D-6
PANEL

18" RCP

18" RCP
TRANS
ALUM.
CAGE
BIRD
D-4
BUILD
D-14 ELEC
ING
F.F.E.
93.66 PANEL
D-11 D-7

19"X30" ERCP

18" RCP

18" RCP
F. LD LE
93 G
F. UI AB
E. IN

3
.4
B T

ELEC
CHARGER
CAR
S
K

K
19"X30"ERCPD-12 D-8
D-13

D-61

24" RC

24"
BFP
3"

R
CP
P
SH
ED
S-16 D-15 15"
D-9 PVC

METER
GAS
S-15 D-59
D-60 INVERT
EL
=84.65
J

J
ELEC
VAULT
GAS PUMPS
ZOOLOGICAL
ELEC QUARANTINE RECOVERY
D-32 AREA
PANEL
OFFICE

A/C ISSUANCES

Drainage Canal
D-31
No. Drawing Issue Description Date

4" BFP
IDD SUBMISSION 11/20/2023
H

H
MATCH LINE - SEE SHEET ?

D-25 D-58

8" PVC
D-28
G

G
D-26
D-27
F

F
RETENTION POND

WAREHOUSE
SERCURITY
E

E
BE

FOC

A W

FL ORID W
L 0' R/
RW
TRA
RETE

CEN WAY 12
NTIO
N
PON
D SS
K
PAR D

WAREHOUSE G

COMM

PROJECT STARBOARD
IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\G004-5 SURVEY.dwg


C

C
SEAWORLD
CENTRAL FLORIDA PARKWAY
120' R/W
EXISTING CONDITIONS
PLAN - SOUTH
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 8:50 AM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
G005
A

A
0 25' 50'

SCALE: 1" = 50'


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

SERVICE LOCAL OFFICE:


YARD 482 SOUTH KELLER RD
102
PEARL
FACTORY
EXTREME
ZONE
C101 ORLANDO, FL 32810
TEL. 407.647.7275

DOLPHIN
NURSERY
034 T O.033
P. OTTER
GIFT SHOP C201 FAX. 407.806.4500
www.atkinsrealis.com
SEA WORLD
C301
L

L
T
THEATER

AMAZING PHOTO 075


PACIFIC
GIFT SHOP
POINT
PRESERVE

VOYAGER'S
RESTAURANT

071 072
K

K
SEA LION & SUPPORT
OTTER AREA
STADIUM

073
FILTRATION
PLANT

PEARL
DIVE
J

J
111
SKY
TOWER SPICE MILL

191
ISSUANCES
S-194
No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023
H

H
192
196 MAKO
RADIO
CONTROL
VEHICLES T

OCEAN
TREASURES
GIFT SHOP
-18"

195 -18"

DINE WITH GULF BREEZE


G

G
SHAMU GIFT SHOP -18"

SHAMU
UNDERWATER 201
VIEWING T NAUTILUS
215 THEATER
B & R POOL

C102
F

F
-0"
-0"
-0"

-0"
C202
C302
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"

-24"
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

052
212

211
E

E
TRAINERS
SHAMU STADIUM BLDG.

E054
PRETZEL
051
T PROJECT STARBOARD
IDD PACKAGE
D

D
HOSPITALITY
239 HOUSE
Play EAGLE
Park MEWS
237
REST ROOM/
VEHICLES T FIRST AID

158
156
150
SECURITY 7007 SeaWorld Dr, Orlando, FL 32821
CHARACTER GATE 3 ♦
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\C100 SITE.dwg

151
C

C
COSTUMES
213
REHAB
RECEIVING
SEAWORLD
153 COMPOUND TRASH
COLLECTION

155
AREA OVERALL SITE PLAN AND
FILTRATION
PLANT
154
156 KEY SHEET
SAFETY
PENGUIN MERCHANDISE
OFFICE
RESEARCH WAREHOUSE
BUILDING
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 2:08 PM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
C100
A

A
0 50' 100'

SCALE: 1" = 100'


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND LOCAL OFFICE:


SERVICE LIMITS OF CONSTRUCTION. 482 SOUTH KELLER RD
ORLANDO, FL 32810
YARD ABOVE GRADE HOTEL AND TEL. 407.647.7275
PARKING GARAGE. FAX. 407.806.4500
www.atkinsrealis.com
ASPHALT ROADWAY.
L

L
CONCRETE PAVEMENT.

STABILIZED ACCESS DRIVE.

SALTWATER HOLDING POND.

STOP BAR AND STOP SIGN.


K

K
075
PACIFIC
POINT
PRESERVE
J

J
ISSUANCES
No. Drawing Issue Description Date
BEGIN RIGHT
072 TURN LANE
IDD SUBMISSION 11/20/2023

SUPPORT CONNECT TO EXISTING AND


RELOCATE 5' SIDEWALK
H

H
AREA

EXIS

50'
CON
TING
073

T R
FILTRATION

OL D AL
VAL TRICT C
CAN
PLANT

108.48
ENC
IS
G

G
12'

'
IA W -5
ATE
R
R100'
F

F
SERVICE/ EMPLOYEE ENTRANCE

R10
0'

7' SIDEWALK
E

E
C-5 CANAL CULVERT GUEST EAST ENTRANCE
S-194 HEADWALL
17'

R20
0'
SECURITY BUILDING
RELOCATED SALT WATER HOLDING POND 15'
17
PROJECT STARBOARD
MAKO '
IDD PACKAGE
D

D
32.87'

TURN AROUND AREA

R2
R2
0'

70
17
R7

'

.5'
' TYP STOP BAR
50
T R AND STOP SIGN
R1

CONNECT TO EXISTING AND


R50

0'

RELOCATE 7' SIDEWALK


76.59'
R4

SERVICE DRIVE
'

0'
24'

24'
R40

R1

17'
0'

HOTEL LOADING
7007 SeaWorld Dr, Orlando, FL 32821
'
25.5'

MECH MECH
RIGHT TURN ♦
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\C100 SITE.dwg

YARD YARD
C

C
17
24
' PARKING GARAGE ' ONLY EXIT SEAWORLD

INTERNATIONAL DRIVE
17
EMPLOYEE ENTRANCE '
0

'
R5
-18"

12' 12' 12' 12' 5.5'


LEVEL 1
PARKING GARAGE SITE PLAN - NORTH
PROPOSED
-18"

PROPOSED GUEST ENTRANCE


CONNECT TO EXISTING AND
53.43'

120' R/W
HOTEL STARBOARD HOTEL R181
R1
50
'
RELOCATE 7' SIDEWALK
'
BUILDING
-18"

AMENITY AREA
R20
B

B
& R3
BEGIN
5' RETAINING
'

PARKING GARAGE
'

R. A. Rivera 100085256
24

WALL
Designed By: Project No.

6' SIDEWALK C. M. Pardo 11/07/2023


'
R35
PLOT DATE: 11/20/2023 2:08 PM

Approved By: Date

R20' J. P. Woods
NAUTILUS Checked By:

B. E. Noyes
THEATER RETAINING WALL Drawn By:
C101
A

A
0 25' 50'

SCALE: 1" = 50'


MATCH LINE - SEE SHEET C102
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCH LINE - SEE SHEET C101


SLOPED WALKWAY R4
LEGEND LOCAL OFFICE:
67 482 SOUTH KELLER RD
TO EXISTING PARK ' LIMITS OF CONSTRUCTION.
HARDSCAPE RETAINING WALL ORLANDO, FL 32810
ABOVE GRADE HOTEL AND TEL. 407.647.7275
R4 PARKING GARAGE. FAX. 407.806.4500
98
' www.atkinsrealis.com
PROPOSED ASPHALT ROADWAY.
L

L
STARBOARD HOTEL CONCRETE PAVEMENT.
BUILDING
BUILD
ING
14 STABILIZED ACCESS DRIVE.
&
F.F.E.
93.66
-0"

' 1
-0"
7'
-0"

BURIED FACE OF BELOW SALTWATER HOLDING POND.


PARKING GARAGE
-0"
-0"

-0"

-10"
12"
12"
GRADE PARKING GARAGE
-0"

STOP BAR AND STOP SIGN.


-10"

-24"

-10"
-24"

-24"
R200
'
-24"

-24" -24"
K

K
C
-24"

A
B
-24"

PROPOSED

17'
052
HOTEL

INTERNATIONAL DRIVE
AMENITY AREA

SH

1'
ED
R5

R3
0' END RETAINING WALL

R2
0'
R50'
EXPOSED FACE OF BELOW
J

J
GRADE PARKING GARAGE
ELEVATED WALKWAY FROM
UPPER HOTEL LEVEL TO
GUEST PARK ENTRANCE

AMENITY RESTROOMS ISSUANCES


36'
17' No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023

MECHANICAL
BUILDING
H

H
R5
44'
MECHANICAL
T YARD R40'

5'

INTERNATIONAL DRIVE
R2
051 20' 0'
C-5 CANAL
BELOW GRADE PARKING R3
CULVERT
GARAGE GUEST ENTRANCE
HOSPITALITY HEADWALL
6' SIDEWALK
HOUSE
G

G
RETAINING WALL R50'

20'
EXISTING VALENCIA WATER
CONTROL DISTRICT C-5

24
'
STABILIZED FIRE /
EXPOSED FACE OF BELOW

R2
MAINTENANCE ACCESS R25
'

24
GRADE PARKING GARAGE
CANAL

'

24
'
BEGIN RETAINING WALL
F

F
R2 6' SIDEWALK
0'
20'

'
150

R20
156 SECURITY
R460

GATE 3 6' SIDEWALK


'

SERCURITY
151
RECEIVING
R7
E

E
2'

24'

O R IDA
TRASH FL
T R A L
20 ' R/W
COLLECTION CEN WAY 1
K
AREA PAR
END RETAINING WALL

6' SIDEWALK
PROJECT STARBOARD
STOP BAR
IDD PACKAGE
D

D
12' 12' 12' 156
R3 '
5' 30
RSAFETY
OFFICE
101.17'
7007 SeaWorld Dr, Orlando, FL 32821
EXISTING ♦
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\C100 SITE.dwg
C

C
SIGNALIZED CENTRAL FLORIDA PARKWAY SEAWORLD
INTERSECTION 120' R/W
SITE PLAN - SOUTH
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 2:09 PM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
C102
A

A
0 25' 50'

SCALE: 1" = 50'


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND LOCAL OFFICE:


LIMITS OF CONSTRUCTION. 482 SOUTH KELLER RD
ORLANDO, FL 32810
STORM SEWER BOX CULVERT. TEL. 407.647.7275
FAX. 407.806.4500
STORM SEWER PIPE. www.atkinsrealis.com
L

L
D
STORM SEWER STRUCTURES.

D-28 STORM SEWER STRUCTURE


NAME.

103.40 SPOT ELEVATION.

DRAINAGE SWALE.

95 5' CONTOUR LINE.


K

K
J

J
ISSUANCES
No. Drawing Issue Description Date
MATCH EXISTING
IDD SUBMISSION 11/20/2023
GRADE ELEV ±93.45
H

H
G

G
MATCH EXISTING
GRADE ELEV ±92.55
F

F
D-31
91.00

TYPICAL TWIN 7'x11' BOX CULVERTS


E

E
AND ACCESS MANHOLES

D-33
PROPOSED DRAINAGE
91.00 MATCH EXISTING
CULVERT HEADWALL
GRADE ELEV ±91.05
92.50
D-30
PROJECT STARBOARD
IDD PACKAGE
D

D
D

D
D D-34
D-52 EXFILTRATION D
94.00
D
CHAMBER D-24
D D-37 91.00 D-35
91.00 D-38
91.00 91.00
91.00
95
7007 SeaWorld Dr, Orlando, FL 32821
MATCH EXISTING
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\C200 GRADE.dwg

92.00 93.50 90.50 GRADE ELEV ±90.00 ♦


C

C
92.00 92.00 D-36
SEAWORLD

INTERNATIONAL DRIVE
POC POC D-23 D-29
BE ION

99.75
92.00
95

-18"

D-27
GRADING AND DRAINAGE
R
AM AT

PLAN - NORTH
CH LTR

-18"

99.75 D-28
100

120' R/W
FI

-18"
88.00
EX

103.40 0
103.40 10
B

B
D D D-22
D
104.50 D-21

POC
R. A. Rivera 100085256
D-26 Designed By: Project No.

90
C. M. Pardo 11/07/2023

90
10 104.00
5
PLOT DATE: 11/20/2023 2:09 PM

Approved By: Date


92.00
D-51 D J. P. Woods
Checked By:
11

B. E. Noyes
C201
0

105.00
Drawn By:
A

A
D-19 0 25' 50'
POC D-20
105.00
105 SCALE: 1" = 50'
MATCH LINE - SEE SHEET C202
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCH LINE - SEE SHEET C201


105
92.50 LEGEND LOCAL OFFICE:
482 SOUTH KELLER RD

90
LIMITS OF CONSTRUCTION.
92.00 112.00 ORLANDO, FL 32810

19
'-1
"
94.00 TEL. 407.647.7275
STORM SEWER BOX CULVERT.
92.50 11 FAX. 407.806.4500
91.50 0
STORM SEWER PIPE. www.atkinsrealis.com
112.00
L

L
112.00 D
STORM SEWER STRUCTURES.

94.00 91.50 D-28 STORM SEWER STRUCTURE


D 112.00 NAME.
-0"

D
92.50

90
-0"

-0"

92.50 -0"
-0"

103.40 SPOT ELEVATION.


-0"
12"

-10"
12"
-0"

-10"
111.00
-10"

-24"
-24"
-24"

-24" D-17 DRAINAGE SWALE.


-24" -24"

95 5' CONTOUR LINE.


K

K
C
-24"

A
92.00
D-18
B
-24"

111.00
112.00
92.50

INTERNATIONAL DRIVE
91.50

95.50

D D
POC
J

J
91.00
111.00
90.00 D-13 91.00
112.00 D-39
111.00 D-14

90
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023

90.50
H

H
111.00
POC 112.00 D-16

D-15 D-40
91.00

INTERNATIONAL DRIVE
90
111.00

91.00 D-10
G

G
D
D-49 D-45
D-50
95
D-9
PROPOSED DRAINAGE 0 112.00 POC
CUVERT HEADWALL 10

EXFILTRATION
91.00

CHAMBER
11 D-41
0
D-12

90
105.75
F

F
D-11

10
5
0
10
D-6
95

D-48 103.40
SERCURITY D
D-5
91.00 90
D-42
D-7
95.10
D-8
E

E
D-2 91.00 D-3
IDA
91.00
D-4
O R
D-1
D-43
A L FL R/W
91.00 90 T R 20 '
CEN WAY 1
90

K
D-47
D-46 PAR
PROJECT STARBOARD
IDD PACKAGE
D

D
MATCH EXISTING
GRADE ELEV ±88.05 7007 SeaWorld Dr, Orlando, FL 32821
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\C200 GRADE.dwg


C

C
CENTRAL FLORIDA PARKWAY SEAWORLD
120' R/W
GRADING AND DRAINAGE
PLAN - SOUTH
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 2:09 PM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
C202
A

A
0 25' 50'

SCALE: 1" = 50'


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND LOCAL OFFICE:


LIMITS OF CONSTRUCTION. 482 SOUTH KELLER RD
ORLANDO, FL 32810
8" WM POTABLE WATER MAIN. TEL. 407.647.7275
FAX. 407.806.4500
8" WM FIRE PROTECTION MAIN. www.atkinsrealis.com
L

L
FH FIRE HYDRANT ASSEMBLY.

290 LF-8" SAN SANITARY GRAVITY MAIN.

4" FM SANITARY FORCE MAIN.

S SANITARY MANHOLE.

SANITARY LIFT STATION.


K

K
J

J
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/20/2023
H

H
G

G
F

F
PROPOSED 10" JACK AND BORE
BELOW I-DRIVE ROADWAY .

METER AND BACKFLOW DEVICE.


E

E
10" WM

M
PROPOSED 10"

"W
TAPPING SLEEVE

10
AND VALVE.
PROJECT STARBOARD
IDD PACKAGE
D

D
EXISTING FIRE
S10 M

10"
HYDRANT. 8" W
S09

WM
294 LF-8" SAN @ 0.40% M
21 LF-8" SAN @ 0.48% S S 4" F 7007 SeaWorld Dr, Orlando, FL 32821
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\C300 UTILITY.dwg

FH 6" WM 8" WM 8" WM ♦

4" F
C

C
20 LF-8"
SEAWORLD

M
SAN @ 0.41%

INTERNATIONAL DRIVE
S11
8" SAN POC.
8" FIRE POC.
-18"

6" POTABLE POC.


8" INV=86.00 N
GREASE TRAP
SANITARY UTILITY PLAN - NORTH
LIFT STATION.

10" WM
LOCATION AND
-18"

120' R/W
CONNECTION.
M
6" W

-18"
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 2:10 PM

Approved By: Date

M J. P. Woods
4" F
WM

Checked By:

B. E. Noyes
10"

Drawn By:
C301
A

A
0 25' 50'

SCALE: 1" = 50'


MATCH LINE - SEE SHEET C302
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCH LINE - SEE SHEET C301


LEGEND LOCAL OFFICE:
482 SOUTH KELLER RD

M
LIMITS OF CONSTRUCTION.

6" W
ORLANDO, FL 32810

19
'-1
"
8" WM POTABLE WATER MAIN. TEL. 407.647.7275
FAX. 407.806.4500
8" WM FIRE PROTECTION MAIN. www.atkinsrealis.com
FH
L

L
FH FIRE HYDRANT ASSEMBLY.

WM
S01
S 6" SANITARY POC. 290 LF-8" SAN SANITARY GRAVITY MAIN.

10"
BUILD
F.F.E.
ING
93.66
EXISTING FIRE
HYDRANT. 4" FM SANITARY FORCE MAIN.
2" WM

FM
S SANITARY MANHOLE.

4"
2" POTABLE POC. SANITARY LIFT STATION.
K

K
C

340 LF-8" SAN @ 0.40%


A
B

67 LF-8" SAN @ 0.43%


8" SAN POC.
8" INV=86.05 SE

INTERNATIONAL DRIVE
SH
ED
SANITARY FORCE MAIN
CONNECTION TO
S SANITARY MANHOLE.
S04

WM
J

J
2" WM

10"
EXISTING FIRE
HYDRANT.

0%
0.4
ISSUANCES

N@
No. Drawing Issue Description Date

SA
IDD SUBMISSION 11/20/2023

8"
LF-
211
H

H
8" POTABLE POC. 33 LF-8" SAN @ 0.54%

2" WM
8" SAN POC. 8" SAN POC.
8" INV=83.30 S 8" INV=85.00 SE

INTERNATIONAL DRIVE
S

WM
S02 FH S05
S S S03

10"
6" WM
G

G
37 LF-8" SAN @ 0.81%
CONNECT TO
88 LF-8" SAN @ 0.40%
EXSITING 8" WM.
S
EXISTING FIRE
241 LF-8" SAN @ 0.45%

S06
HYDRANT.
M
0"W
1

0%
F

F
4
0.
@
AN
"S
-8
LF
M 4
CONNECT TO EXSITING 8" "W 24
WM WITH 8"x10" REDUCER. 10
SERCURITY

S
10" WM
E

E
WM
S 10"
0.40
%
S07
O R IDA
139 L SA N@
A L FL R/W
S12 F -8" S -8" T R 20 '
INSTALL DOGHOUSE
AN @ 0.
40% S
155
LF
CEN WAY 1
K
PAR
MANHOLE AND CONNECT S08
TO EXSITING 8" SANITARY.

PROJECT STARBOARD
IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821
FILE NAME: G:\PROJECTS\100085256 SWO Hotel\3. Execution\DR\IDD\C300 UTILITY.dwg


C

C
CENTRAL FLORIDA PARKWAY SEAWORLD
120' R/W
UTILITY PLAN - SOUTH
B

B
R. A. Rivera 100085256
Designed By: Project No.

C. M. Pardo 11/07/2023
PLOT DATE: 11/20/2023 2:10 PM

Approved By: Date

J. P. Woods
Checked By:

B. E. Noyes
Drawn By:
C302
A

A
0 25' 50'

SCALE: 1" = 50'


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

TOTAL BUILDING HEIGHT: 199'-6"


L

L
15 TOTAL FLOORS INCLUSIVE OF 12 GUESTROOM FLOORS
TOTAL BUILDING AREA: 564,760 GSF (DOES NOT INCLUDE PARKING)

PARKING SUMMARY:
P1: 256 PARKING SPACES
P2: 215 PARKING SPACES ©2021 COOPER CARRY

P3: 80 PARKING SPACES GUARD BUILDING


K

K
P4: 85 PARKING SPACES
P5: 91 PARKING SPACES
P6: 20 PARKING SPACES
TOTAL: 747 PARKING SPACES
SERVICE DRIVE MECH YARD

HOTEL LOADING
J

J
TABLE OF USES

PRIMARY USE HOTEL - 504 KEYS 499,608 SF ISSUANCES


No. Drawing Issue Description Date
EVENT
CONFERENCE 42,787 SF LAWN
BALLROOM ROOF
IDD SUBMISSION 11/20/2023

RESTAURANT/BAR 17,901 SF
H

H
ANCILLARY USE
FITNESS 2,734 SF
RETAIL 1,730 SF CONFERENCE CENTER ROOF

PARKING PARKING 272,000 SF


G

G
INTERNATIONAL DRIVE
TERRACE RESTAURANT
ROOF
F

F
AMENITY RESTROOMS

PORTE
COCHERE
E

E
POOL EQUIPMENT ELEVATED BOARDWALK
STORAGE ROOM TO SEAWORLD

PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD IDD PACKAGE


C

C
SEAWORLD

SITE PLAN

CENTRAL FLORIDA PKWY


B

B
Rob Uhrin 20230011
SHEET NUMBER: A0.000 - SITE PLAN

Principal-in-Charge Project No.

Jason King 09/19/23


Project Manager Date
11/17/2023 2:40:32 PM

Bing Sun
Project Architect

Carly Langsdorf
N Staff Architect
A0.000
A

A
1 SITE PLAN
A0.000 SCALE: 1" = 80'-0"

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

LEGEND Legend
Department
L

L
BOH
FLEX MTG
BOH CIRCULATION 1,055 SF

CIRCULATION
STORAGE
ELEVATORS 2,284 SF
MTG RM D
MEETING 1,718 SF
© 2021 COOPER CARRY
PUBLIC
K

K
IDF
RESTAURANT 107 SF
JR BALLROOM
STAIRS 8,014 SF

KITCHEN
MTG RM C 1,682 SF
2,218 SF
J

J
ELEC
103 SF

CHILLER PLANT
PREFUNCTION 3,196 SF ISSUANCES
9,677 SF No. Drawing Issue Description Date
IDD SUBMISSION 11/13/2023
11/20/2023

MTG RM E
H

H
3,735 SF MECH
MTG RM B
1,108 SF
1,888 SF
DOM PUMP
228 SF

M M FIRE PUMP
MTG RM A
236 SF 516 SF 244 SF
1,032 SF
M LOCKER ROOM
W 1,020 SF
288 SF
G

G
BAR/PIZZA/ICE CREAM
LANDSCAPE STORAGE 3,411 SF
3,098 SF W
EM ELEC MAIN ELEC
858 SF 759 SF
119 SF
EMPLOYEE LOUNGE
ELEC FITNESS CHILDRENS PROGRAM
ELEC 1,854 SF
210 SF 2,630 SF 2,926 SF
109 SF STORAGE DISCONNECT MDF
IDF 123 SF
KITCHEN 252 SF 501 SF
178 SF
MAINTENANCE WKSHOP 2,633 SF
642 SF W LOCKER ROOM VESTIBULE
M MECH 1,151 SF 106 SF
ACCOUNTING OFFICE MECH/ELEC 265 SF 672 SF
LOBBY PREP RCV STOR RISK SEC
764 SF
F

F
630 SF 197 SF 196 SF 117 SF 155 SF 193 SF
2,106 SF
CALL CENTER W TEENS PROGRAM REF GARB
708 SF 263 SF 1,160 SF 128 SF
TEMP
HK/LAUNDRY 129 SF
JAN 5,866 SF
AQUARIUM LSS RECYCLE
77 SF
1,906 SF 301 SF CAN
56 SF LOADING DOCK
CHEM STOR DRY
205 SF ELEC
75 SF
MECH 302 SF
776 SF
HK MGR
163 SF
E

E
PARKING LOBBY
184 SF
ELEC
165 SF

PARKING
PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

89158 SF

IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821
LEVEL 1 AREAS

C

C
PRIMARY USE HOTEL 48,839 SF SEAWORLD
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

CONFERENCE 19,660 SF LEVEL 1 FLOOR PLAN


RESTAURANT/BAR 3,411 SF
ANCILLARY USE
FITNESS 2,734 SF
SHEET NUMBER: A0.001 - LEVEL 1 FLOOR PLAN

B
RETAIL 0 SF
Rob Uhrin 20230011
Principal-in-Charge Project No.
PARKING PARKING 88,961 SF Jason King 09/19/23
Project Manager Date
11/16/2023 2:45:37 PM

Bing Sun
1 FLOOR PLAN - LEVEL 1 Project Architect

A0.001 SCALE: 1" = 30'-0" N Carly Langsdorf


Staff Architect
A0.001
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

LEGEND Legend
Department
L

L
BOH

BOH CIRCULATION

CIRCULATION

ELEVATORS

MEETING
© 2021 COOPER CARRY
PUBLIC

K
K

RESTAURANT

STAIRS

J
J

ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/13/2023
11/17/2023
11/20/2023
H

H
G

G
F

F
PARKING ENTRY

OPEN TO BELOW

PARKING LOBBY

E
E

184 SF

PARKING
89,200 SF

PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE

D
D

LEVEL 1.5 AREAS 7007 SeaWorld Dr, Orlando, FL 32821


C
C

PRIMARY USE HOTEL 0 SF SEAWORLD


PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

CONFERENCE 0 SF PARKING ENTRY


LEVEL 1.5 FLOOR PLAN
RESTAURANT/BAR 0 SF
ANCILLARY USE
FITNESS 0 SF
SHEET NUMBER: A0.001.5 - LEVEL 1.5 FLOOR PLAN

B
B

RETAIL 0 SF
Rob Uhrin 20230011
PARKING PARKING 89,200 SF
Principal-in-Charge Project No.

Jason King 09/19/23


Project Manager Date

Bing Sun
11/7/2023 2:59:28 PM

1 LEVEL1.5 PLAN Project Architect

A0.001.5 SCALE: 1" = 30'-0" N Carly Langsdorf


Staff Architect
A0.001.5

A
A

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

LEGEND Legend
Department
L

L
BOH

BOH CIRCULATION
MTG RM B
CIRCULATION 2,761 SF

ELEVATORS

MEETING
© 2021 COOPER CARRY
PUBLIC

K
K

RESTAURANT

STAIRS
IDF ELEC
149 SF 165 SF

BALLROOM
12,954 SF

J
J

KITCHEN
4,311 SF ISSUANCES
No. Drawing Issue Description Date
MTG RM A IDD SUBMISSION 11/13/2023
11/17/2023
11/20/2023
2,800 SF
H

H
ELEC
185 SF
GEN MGR
155 SF PRIVATE DINING MTG RM C
F/B DIR 710 SF 1,357 SF
105 SF
ROOMS DIR
107 SF BOARD ROOM
PR DIR
634 SF MTG RM D
108 SF REC 2,621 SF
G

G
S/M DIR 195 SF
OPEN OFFICE
117 SF RESTAURANT MECH
1,193 SF
SAFE 9,800 SF 1,820 SF
ELEC 143 SF CATERING
W
202 SF IDF MECH 100 SF
RESERV 692 SF
128 SF 594 SF
FIRE CMD 117 SF M
222 SF 478 SF

CONF LOBBY FAMILY


KITCHEN 97 SF
332 SF 8,315 SF STORAGE
5,673 SF FAMILY
5,692 SF
F

F
99 SF
STAFF RR FOM STOR
82 SF 78 SF 91 SF MECH
VALET MARKET 640 SF
108 SF REC MGR 1,674 SF PARKING
116 SF ELEC
FO WORK AREA 28793 SF
674 SF
391 SF
W
M
322 SF
CONCIERGE 309 SF JAN
473 SF 122 SF
LOUNGE
PARKING LOBBY
1,500 SF

E
E

184 SF

PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE

D
D

LEVEL 2 AREAS 7007 SeaWorld Dr, Orlando, FL 32821


C
C

PRIMARY USE HOTEL 67,550 SF SEAWORLD


PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

CONFERENCE 23,127 SF LEVEL 2 FLOOR PLAN


RESTAURANT/BAR 10,510 SF
ANCILLARY USE
FITNESS 0 SF
SHEET NUMBER: A0.002 - LEVEL 2 FLOOR PLAN

B
B

RETAIL 1,674 SF
Rob Uhrin 20230011
PARKING PARKING 28,793 SF
Principal-in-Charge Project No.

Jason King 09/19/23


Project Manager Date

Bing Sun
11/6/2023 4:11:18 PM

1 FLOOR PLAN - LEVEL 2 Project Architect

A0.002 SCALE: 1" = 30'-0" N Carly Langsdorf


Staff Architect
A0.002

A
A

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

L
COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

L
© 2021 COOPER CARRY
K

K
J

J
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/13/2023
11/20/2023
H

H
762 SF

379 SF
G

G
382 SF
382 SF
379 SF
379 SF
382 SF
431 SF 382 SF
379 SF
379 SF
382 SF 819 SF
382 SF
874 SF 382 SF 379 SF 379 SF
379 SF 379 SF 382 SF
F

F
431 SF 382 SF
390 SF 421 SF 382 SF 379 SF 379 SF
419 SF
418 SF 326 SF
418 SF
419 SF 28811 SF
419 SF
418 SF 145 SF
418 SF
419 SF 419 SF
438 SF 835 SF 119 SF
425 SF 483 SF 415 SF 419 SF 316 SF
E

E
184 SF

PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821
LEVEL 3 AREAS

C

C
PRIMARY USE HOTEL 48,839 SF SEAWORLD
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

CONFERENCE 0 SF LEVEL 3 FLOOR PLAN


RESTAURANT/BAR 0 SF
ANCILLARY USE
FITNESS 0 SF
SHEET NUMBER: A0.003 - LEVEL 3 FLOOR PLAN

B
RETAIL 0 SF
Rob Uhrin 20230011
Principal-in-Charge Project No.
PARKING PARKING 28,811 SF Jason King 09/19/23
Project Manager Date
11/16/2023 3:05:48 PM

Bing Sun
1 LEVEL 3 Project Architect

A0.003 SCALE: 1" = 30'-0" N Carly Langsdorf


Staff Architect
A0.003
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

L
COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

L
831 SF 868 SF

379 SF 379 SF
382 SF 382 SF
382 SF 382 SF © 2021 COOPER CARRY
379 SF 379 SF
379 SF 379 SF
K

K
382 SF 382 SF
382 SF 382 SF
533 SF 610 SF
379 SF 379 SF
379 SF 379 SF
873 SF 753 SF
382 SF 382 SF 382 SF 382 SF 382 SF
874 SF 382 SF 379 SF 379 SF 874 SF 379 SF 379 SF 379 SF
379 SF 379 SF
379 SF 431 SF 382 SF 382 SF
382 SF 379 SF 379 SF 382 SF 431 SF 382 SF 379 SF 379 SF 382 SF
390 SF 421 SF 390 SF 421 SF
419 SF 419 SF
418 SF
418 SF 325 SF 325 SF
418 SF 418 SF
419 SF
419 SF
J

J
419 SF
419 SF 154 SF 147 SF
418 SF 418 SF
418 SF 418 SF 419 SF
419 SF 419 SF 419 SF 438 SF
438 SF 835 SF 122 SF 835 SF 119 SF
425 SF 487 SF 419 SF 419 SF 316 SF 425 SF 487 SF 419 SF 419 SF 316 SF

ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/13/2023
11/20/2023
H

H
LEVEL 7 AREAS LEVEL 5 AREAS

PRIMARY USE HOTEL 27,808 SF PRIMARY USE HOTEL 28,415 SF


CONFERENCE 0 SF CONFERENCE 0 SF

RESTAURANT/BAR 0 SF RESTAURANT/BAR 0 SF
ANCILLARY USE ANCILLARY USE
FITNESS 0 SF FITNESS 0 SF
G

G
RETAIL 0 SF RETAIL 0 SF
PARKING PARKING 0 SF PARKING PARKING 0 SF

4 LEVEL 7 2 LEVEL 5
A0.004 SCALE: 1" = 30'-0" N A0.004 SCALE: 1" = 30'-0" N
F

F
E

E
750 SF 818 SF

379 SF 379 SF
382 SF 382 SF
382 SF 382 SF
379 SF 379 SF
379 SF
379 SF
382 SF 382 SF
382 SF 382 SF
PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

431 SF 533 SF 379 SF


379 SF
379 SF 379 SF
819 SF 869 SF
382 SF
IDD PACKAGE
D

D
382 SF 382 SF
382 SF 379 SF 379 SF 382 SF 379 SF 379 SF 382 SF
874 SF 379 SF 874 SF 379 SF
379 SF 431 SF 382 SF 379 SF 431 SF 382 SF 382 SF
390 SF 421 SF 382 SF 379 SF 379 SF 382 SF 390 SF 421 SF 382 SF 379 SF 379 SF
419 SF 419 SF
418 SF 418 SF
325 SF 325 SF
418 SF 418 SF
419 SF
419 SF
419 SF
419 SF 147 SF 154 SF
418 SF
418 SF
418 SF
418 SF
419 SF
7007 SeaWorld Dr, Orlando, FL 32821
419 SF
419 SF 438 SF 835 SF 119 SF 419 SF 438 SF 835 SF 122 SF ♦
C

C
425 SF 419 SF 419 SF 316 SF 425 SF 487 SF 419 SF 419 SF 316 SF
487 SF
SEAWORLD
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

LEVELS 4-7 FLOOR PLANS


LEVEL 6 AREAS LEVEL 4 AREAS

PRIMARY USE HOTEL 27,882 SF PRIMARY USE HOTEL 28,415 SF


SHEET NUMBER: A0.004 - LEVELS 4-7 FLOOR PLANS

CONFERENCE 0 SF CONFERENCE 0 SF
B

B
RESTAURANT/BAR 0 SF RESTAURANT/BAR 0 SF
ANCILLARY USE ANCILLARY USE Rob Uhrin 20230011
FITNESS 0 SF FITNESS 0 SF Principal-in-Charge Project No.

RETAIL 0 SF RETAIL 0 SF Jason King 09/19/23


11/16/2023 12:55:49 PM

Project Manager Date


PARKING PARKING 0 SF PARKING PARKING 0 SF
Bing Sun
Project Architect

Carly Langsdorf
3 LEVEL 6 1 LEVEL 4 Staff Architect
A0.004
A

A
A0.004 SCALE: 1" = 30'-0" N A0.004 SCALE: 1" = 30'-0" N
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

L
COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

L
870 SF 753 SF

382 SF 382 SF
379 SF 379 SF
379 SF 379 SF © 2021 COOPER CARRY
382 SF 382 SF
382 SF 382 SF
K

K
379 SF 379 SF
610 SF 379 SF 379 SF
382 SF 431 SF
382 SF
753 SF 819 SF
379 SF 791 SF 379 SF
791 SF 379 SF 382 SF 382 SF 379 SF 382 SF 382 SF
874 SF 382 SF 874 SF 382 SF
382 SF 379 SF 382 SF 431 SF 379 SF
431 SF 380 SF 382 SF 382 SF 379 SF 380 SF 382 SF 382 SF 379 SF
390 SF 418 SF 390 SF 418 SF
419 SF 419 SF
418 SF 325 SF 418 SF 325 SF
418 SF 418 SF
419 SF 419 SF
J

J
419 SF 418 SF 147 SF 419 SF 147 SF
418 SF
418 SF 419 SF 418 SF
419 SF 835 SF 119 SF 419 SF 419 SF
438 SF 438 SF 835 SF 119 SF
425 SF 487 SF 419 SF 419 SF 316 SF 425 SF 487 SF 419 SF 419 SF 316 SF

ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/13/2023
11/20/2023
H

H
LEVEL 11 AREAS LEVEL 9 AREAS

PRIMARY USE HOTEL 28,415 SF PRIMARY USE HOTEL 27,881 SF


CONFERENCE 0 SF CONFERENCE 0 SF

RESTAURANT/BAR 0 SF RESTAURANT/BAR 0 SF
ANCILLARY USE ANCILLARY USE
FITNESS 0 SF FITNESS 0 SF
G

G
RETAIL 0 SF RETAIL 0 SF
PARKING PARKING 0 SF PARKING PARKING 0 SF

4 LEVEL 11 2 LEVEL 9
A0.005 SCALE: 1" = 30'-0" N A0.005 SCALE: 1" = 30'-0" N
F

F
E

E
820 SF 868 SF

382 SF 379 SF
379 SF 382 SF
379 SF 382 SF
382 SF 379 SF
382 SF 379 SF
379 SF 382 SF
379 SF 382 SF
PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

533 SF 610 SF
382 SF 379 SF
867 SF 753 SF
IDD PACKAGE
D

D
791 SF 379 SF 382 SF
379 SF 382 SF 382 SF 791 SF 382 SF 379 SF
874 SF 382 SF 874 SF 379 SF
382 SF 431 SF 379 SF 379 SF 431 SF 382 SF 379 SF
390 SF 418 SF 380 SF 382 SF 382 SF 379 SF 390 SF 421 SF 382 SF 379 SF 379 SF 382 SF
419 SF 419 SF
418 SF 325 SF 418 SF 325 SF
418 SF 418 SF
419 SF 419 SF
419 SF 154 SF 419 SF 147 SF
418 SF
418 SF
418 SF
418 SF
7007 SeaWorld Dr, Orlando, FL 32821
419 SF
419 SF 419 SF
438 SF 835 SF 122 SF 419 SF 438 SF 835 SF 119 SF ♦
C

C
425 SF 487 SF 419 SF 419 SF 316 SF 425 SF 487 SF 419 SF 419 SF 316 SF
SEAWORLD
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

LEVELS 8-11 FLOOR PLANS


LEVEL 10 AREAS LEVEL 8 AREAS

PRIMARY USE HOTEL 27,808 SF PRIMARY USE HOTEL 28,415 SF


SHEET NUMBER: A0.005 - LEVELS 8-11 FLOOR PLANS

CONFERENCE 0 SF CONFERENCE 0 SF
B

B
RESTAURANT/BAR 0 SF RESTAURANT/BAR 0 SF
ANCILLARY USE ANCILLARY USE Rob Uhrin 20230011
FITNESS 0 SF FITNESS 0 SF Principal-in-Charge Project No.

RETAIL 0 SF RETAIL 0 SF Jason King 09/19/23


11/16/2023 12:55:56 PM

Project Manager Date


PARKING PARKING 0 SF PARKING PARKING 0 SF
Bing Sun
Project Architect

Carly Langsdorf
3 LEVEL 10 1 LEVEL 8 Staff Architect
A0.005
A

A
A0.005 SCALE: 1" = 30'-0" N A0.005 SCALE: 1" = 30'-0" N
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

L
COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE

L
1,614 SF

379 SF © 2021 COOPER CARRY


382 SF
382 SF
K

K
379 SF
533 SF 379 SF
382 SF
867 SF
ROOF TERRACE 379 SF
791 SF 379 SF 382 SF 382 SF
5,993 SF 874 SF 382 SF
382 SF 431 SF 379 SF
390 SF 418 SF 380 SF 382 SF 382 SF 379 SF
MECH YARD
EVENT ROOM 419 SF
2,083 SF BAR
2,034 SF 418 SF 325 SF
4,007 SF 418 SF
IDF 419 SF
J

J
MECH
105 SF 419 SF
601 SF 418 SF 154 SF
STORAGE ELEC 418 SF
477 SF KITCHEN 122 SF 419 SF 419 SF
W 438 SF 835 SF 122 SF
M 2,843 SF 419 SF 316 SF
234 SF 425 SF 487 SF 419 SF
238 SF
ISSUANCES
No. Drawing Issue Description Date
IDD SUBMISSION 11/13/2023
11/20/2023
H

H
LEVEL 15 AREAS LEVEL 13 AREAS

PRIMARY USE HOTEL 17,803 SF PRIMARY USE HOTEL 27,808 SF


CONFERENCE 0 SF CONFERENCE 0 SF

RESTAURANT/BAR 3,980 SF RESTAURANT/BAR 0 SF


ANCILLARY USE ANCILLARY USE
FITNESS 0 SF FITNESS 0 SF
G

G
RETAIL 0 SF RETAIL 0 SF
PARKING PARKING 0 SF PARKING PARKING 0 SF

4 LEVEL 15 2 LEVEL 13
A0.006 SCALE: 1" = 30'-0" N A0.006 SCALE: 1" = 30'-0" N
F

F
E

E
753 SF

2,059 SF 382 SF
379 SF
379 SF
382 SF 382 SF

382 SF 382 SF
379 SF
378 SF
378 SF 379 SF
PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

610 SF 431 SF
382 SF 382 SF
750 SF 817 SF
IDD PACKAGE
D

D
791 SF 791 SF
379 SF 379 SF 379 SF
874 SF 379 SF 382 SF 382 SF 874 SF 382 SF 382 SF 382 SF
382 SF 382 SF
382 SF 431 SF 379 SF 379 SF
380 SF 382 SF 382 SF 379 SF 431 SF 380 SF 382 SF 382 SF 379 SF
390 SF 418 SF 390 SF 418 SF
419 SF 419 SF
325 SF 418 SF 325 SF
418 SF 418 SF
418 SF
419 SF
419 SF 419 SF
419 SF 147 SF 418 SF 147 SF
418 SF
418 SF
418 SF
419 SF
7007 SeaWorld Dr, Orlando, FL 32821
419 SF 419 SF
438 SF 835 SF 119 SF 419 SF 438 SF 835 SF 119 SF ♦
C

C
425 SF 487 SF 419 SF 419 SF 316 SF 425 SF 487 SF 419 SF 419 SF 316 SF
SEAWORLD
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

LEVELS 12-15 FLOOR PLANS


LEVEL 14 AREAS LEVEL 12 AREAS

PRIMARY USE HOTEL 28,415 SF PRIMARY USE HOTEL 27,881 SF


SHEET NUMBER: A0.006 - LEVELS 12-15 FLOOR PLANS

CONFERENCE 0 SF CONFERENCE 0 SF
B

B
RESTAURANT/BAR 0 SF RESTAURANT/BAR 0 SF
ANCILLARY USE ANCILLARY USE Rob Uhrin 20230011
FITNESS 0 SF FITNESS 0 SF Principal-in-Charge Project No.

RETAIL 0 SF RETAIL 0 SF Jason King 09/19/23


Project Manager Date
PARKING PARKING 0 SF PARKING PARKING 0 SF
11/16/2023 1:34:39 PM

Bing Sun
Project Architect

Carly Langsdorf
3 LEVEL 14 1 LEVEL 12 Staff Architect
A0.006
A

A
A0.006 SCALE: 1" = 30'-0" N A0.006 SCALE: 1" = 30'-0" N
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

NOTE:
EXTERIOR FINISH MATERIALS TO BE A COMBINTATION OF SINTERED STONE PANELS, ALUMINUM COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE
PANELS, INSULATED GLASS, AND EIFS WITH SELECTED BACK OF HOUSE AREAS TO BE CMU
L

L
MAX BUILDING HEIGHT = 200'-0"
EL. 287' - 4"
LEVEL 16
ROOFTOP BAR

EL. 267' - 4" © 2021 COOPER CARRY


LEVEL 15

EL. 252' - 8"


K

K
LEVEL 14
EL. 242' - 0"
LEVEL 13
EL. 231' - 4"
LEVEL 12
EL. 220' - 8"
LEVEL 11
HOTEL TOWER
EL. 210' - 0"
LEVEL 10
EL. 199' - 4"
LEVEL 9

199' - 6"
J

J
EL. 188' - 8"
LEVEL 8
EL. 178' - 0"
LEVEL 7
HOTEL CONFERENCE CENTER EL. 167' - 4"
LEVEL 6 ISSUANCES
PARKING GARAGE EL. 156' - 8"
LEVEL 5 No. Drawing Issue Description Date
EL. 146' - 0" IDD SUBMISSION 11/13/2023
11/20/2023
LEVEL 4
EL. 134' - 0"
H

H
LEVEL 3

59' - 0"
EL. 112' - 0"
LEVEL 2 / P3

EL. 92' - 0"


LEVEL 1
G

G
LOADING DOCK

2 NORTH ELEVATION
A0.007 SCALE: 1" = 30'-0"
F

F
MAX BUILDING HEIGHT = 200'-0"
EL. 287' - 4"
LEVEL 16
E

E
ROOFTOP BAR
EL. 267' - 4"
LEVEL 15

EL. 252' - 8"


LEVEL 14
EL. 242' - 0"
LEVEL 13
EL. 231' - 4"
PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

LEVEL 12
EL. 220' - 8"
IDD PACKAGE
D

D
LEVEL 11
EL. 210' - 0"
LEVEL 10
HOTEL TOWER
EL. 199' - 4"
LEVEL 9

199' - 6"
EL. 188' - 8"
LEVEL 8
EL. 178' - 0"
LEVEL 7
CONFERENCE CENTER PARKING GARAGE
EL. 167' - 4"
7007 SeaWorld Dr, Orlando, FL 32821
LEVEL 6 ♦
C

C
EL. 156' - 8"
LEVEL 5 SEAWORLD
EL. 146' - 0"
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

LEVEL 4
EL. 134' - 0"
LEVEL 3
ELEVATIONS
59' - 0"

EL. 112' - 0"


LEVEL 2 / P3
B

B
EL. 92' - 0"
LEVEL 1
Rob Uhrin 20230011
SHEET NUMBER: A0.007 - ELEVATIONS

Principal-in-Charge Project No.

Jason King 09/19/23


Project Manager Date
11/16/2023 1:25:10 PM

Bing Sun
Project Architect
1 WEST ELEVATION Carly Langsdorf
A0.007 SCALE: 1" = 30'-0" Staff Architect
A0.007
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

NOTE:
EXTERIOR FINISH MATERIALS TO BE A COMBINTATION OF SINTERED STONE PANELS, ALUMINUM COOPER CARRY
THE CENTER FOR CONNECTIVE ARCHITECTURE
PANELS, INSULATED GLASS, AND EIFS WITH SELECTED BACK OF HOUSE AREAS TO BE CMU
L

L
MAX BUILDING HEIGHT = 200'-0"
EL. 287' - 4"
LEVEL 16

EL. 267' - 4" © 2021 COOPER CARRY


LEVEL 15

EL. 252' - 8"


K

K
LEVEL 14
EL. 242' - 0"
LEVEL 13
EL. 231' - 4"
LEVEL 12
EL. 220' - 8"
LEVEL 11
HOTEL TOWER
EL. 210' - 0"
LEVEL 10
EL. 199' - 4"
LEVEL 9

199' - 6"
J

J
EL. 188' - 8"
LEVEL 8
EL. 178' - 0"
LEVEL 7
HOTEL CONFERENCE CENTER EL. 167' - 4"
LEVEL 6 ISSUANCES
PARKING GARAGE EL. 156' - 8"
LEVEL 5 No. Drawing Issue Description Date
EL. 146' - 0" IDD SUBMISSION 11/13/2023
11/20/2023
LEVEL 4
EL. 134' - 0"
H

H
LEVEL 3
59' - 0"

EL. 112' - 0"


LEVEL 2 / P3

EL. 92' - 0"


LEVEL 1
G

G
2 SOUTH ELEVATION
A0.008 SCALE: 1" = 30'-0"
F

F
MAX BUILDING HEIGHT = 200'-0"
EL. 287' - 4"
LEVEL 16
E

E
EL. 267' - 4"
LEVEL 15

EL. 252' - 8"


LEVEL 14
EL. 242' - 0"
LEVEL 13
EL. 231' - 4"
PROJECT STARBOARD
OJECT STARBOA
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

LEVEL 12
EL. 220' - 8"
IDD PACKAGE
D

D
LEVEL 11
EL. 210' - 0"
LEVEL 10
HOTEL TOWER
EL. 199' - 4"
LEVEL 9

199' - 6"
EL. 188' - 8"
LEVEL 8
EL. 178' - 0"
LEVEL 7
PARKING GARAGE
EL. 167' - 4"
7007 SeaWorld Dr, Orlando, FL 32821
LEVEL 6 ♦
C

C
EL. 156' - 8"
LEVEL 5 SEAWORLD
EL. 146' - 0"
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

LEVEL 4
EL. 134' - 0"
LEVEL 3
ELEVATIONS
PORTE CORCHERE

EL. 112' - 0"


LEVEL 2 / P3
B

B
EL. 92' - 0"
LEVEL 1
Rob Uhrin 20230011
SHEET NUMBER: A0.008 - ELEVATIONS

Principal-in-Charge Project No.

Jason King 09/19/23


Project Manager Date
11/16/2023 1:28:21 PM

Bing Sun
Project Architect

Carly Langsdorf
1 EAST ELEVATION Staff Architect
A0.008
A

A
A0.008 SCALE: 1" = 30'-0"

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND

TREE TO BE REMOVED
L

L
PALM TO BE REMOVED

L1.01
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.
MATCHLINE SHEET L1.01 MATCHLINE SHEET L1.01

MATCHLINE SHEET L1.03 MATCHLINE SHEET L1.03

LIMIT OF
WORK
ISSUANCES
No. Drawing Issue Description Date

MATCHLINE SHEET L1.02


01 IDD
IDD Submission

E
11/20/23
NOTES

MATCHLINE SHEET L1.03


LIN
Package 11/22/23

TY
ER
OP
PR
H

H
L1.03
LIMIT OF WORK LIMIT OF WORK

L1.02
G

G
MATCHLINE SHEET L1.02
MATCHLINE SHEET L1.03
MATCHLINE SHEET L1.03 MATCHLINE SHEET L1.03

MATCHLINE SHEET L1.06 MATCHLINE SHEET L1.06

K
OR
MATCHLINE SHEET L1.02

FW
MATCHLINE SHEET L1.06

O
IT
PROPERTY LINE

LIM
LIMIT OF WORK

MATCHLINE SHEET L1.02 MATCHLINE SHEET L1.02

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.05 MATCHLINE SHEET L1.05

PROPERTY LINE
LIMIT OF WORK
MATCHLINE SHEET L1.04

MATCHLINE SHEET L1.05


MATCHLINE SHEET L1.05

MATCHLINE SHEET L1.06


F

F
L1.06
LIMIT OF WORK

L1.04
######################

L1.05
######
E

E
MATCHLINE SHEET L1.05
MATCHLINE SHEET L1.06

WORK
LIMIT OF
MATCHLINE SHEET L1.06 MATCHLINE SHEET L1.06

MATCHLINE SHEET L1.09 MATCHLINE SHEET L1.09

ORK
MATCHLINE SHEET L1.05

OF W
MATCHLINE SHEET L1.09
PROJECT STARBOARD

LIMIT
PROPERTY LINE
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

MATCHLINE SHEET L1.04

LIMIT OF WORK
MATCHLINE SHEET L1.05

IDD PACKAGE
D

D
MATCHLINE SHEET L1.04 MATCHLINE SHEET L1.04 MATCHLINE SHEET L1.05 MATCHLINE SHEET L1.05

MATCHLINE SHEET L1.07 MATCHLINE SHEET L1.07 MATCHLINE SHEET L1.08 MATCHLINE SHEET L1.08
MATCHLINE SHEET L1.07
MATCHLINE SHEET L1.08

MATCHLINE SHEET L1.08


MATCHLINE SHEET L1.09

LIMIT OF WORK
FUTURE DEVELOPMENT
EXISTING PLANTING TO REMAIN

L1.09
PROPERTY LINE
LIMIT OF WORK

KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

L1.07 L1.08 ♦
K
OR
W
OF
C

C
IT
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

LIM

WO
RK
SEAWORLD
OF
IT
LIM

OVERALL TREE REMOVAL


MATCHLINE SHEET L1.08

PLAN
MATCHLINE SHEET L1.09

-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"
MATCHLINE SHEET L1.07
MATCHLINE SHEET L1.08

ARKWAY
R AL F L ORIDA P JMS 20230011
CENT Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
SCALE: 1" = 100'-0" Drawn By
L1.00
A

A
0 100 200

Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND

TREE TO BE REMOVED
L

L
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
G

G
NO SCOPE ON
THIS SHEET
F

F
E

E
INTER
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
NATIO
NAL D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

RIVE

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L1.01
A

A
0 20 40

Feet
MATCHLINE SHEET L1.03 MATCHLINE SHEET L1.03 Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND

MATCHLINE SHEET L1.03


LIN
TY
ER
TREE TO BE REMOVED

OP
L

L
PR
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
LIMIT OF WORK PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
G

G
NO SCOPE ON
THIS SHEET
F

F
E

E
MATCHLINE SHEET L1.03
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

ORCA SALT WATER RESERVOIR SEAWORLD

TREE REMOVAL PLAN

MATCHLINE SHEET L1.06


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

PROPERTY LINE

-12"

-24"

-12"

-36"

-24"
LIMIT OF WORK

-36"
19'-1"
-12" -42"
-24"

-36"

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L1.02
A

A
0 20 40

MATCHLINE SHEET L1.05 MATCHLINE SHEET L1.05 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.01 MATCHLINE SHEET L1.01


LEGEND

LIMIT O
TREE TO BE REMOVED
L

L
WORKF
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
MATCHLINE SHEET L1.02

components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
LIMIT OF WORK
G

G
F

F
INTERNATIONAL DRIVE
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"
MATCHLINE SHEET L1.02

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

GREENHOUSE JMS
Designed By
20230011
Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L1.03
A

A
CONSTRUCTION 0 20 40

MATCHLINE SHEET L1.06


BUILDING MATCHLINE SHEET L1.06 Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND
NAUTILUS THEATER

MATCHLINE SHEET L1.05


TREE TO BE REMOVED
L

L
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,

BOH components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

LIMIT OF WORK
ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
G

G
STABLE

NO SCOPE ON
THIS SHEET
F

F
STABLE
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

MATCHLINE SHEET L1.05


JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
WATERWAY BAR & GRILL SCALE: 1" = 20'-0" Drawn By
L1.04
A

A
0 20 40

MATCHLINE SHEET L1.07 MATCHLINE SHEET L1.07 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.02 MATCHLINE SHEET L1.02


LEGEND

GREENHOUSE
PROPERTY LINE
LIMIT OF WORK
MATCHLINE SHEET L1.04
ORCA SALT WATER RESERVOIR

MATCHLINE SHEET L1.06


TREE TO BE REMOVED
L

L
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
######################

######
NOTES Package 11/20/23
11/22/23
H

H
G

G
F

F
E

E
MATCHLINE SHEET L1.06
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
FUEL STATION

KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN

MATCHLINE SHEET L1.09


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"
PROPERTY LINE

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"
MATCHLINE SHEET L1.04

LIMIT OF WORK

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L1.05
A

A
0 20 40

MATCHLINE SHEET L1.08 MATCHLINE SHEET L1.08 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.03 MATCHLINE SHEET L1.03


LEGEND

K
OR
TREE TO BE REMOVED
MATCHLINE SHEET L1.02

FW
L

L
TO
CONSTRUCTION

I
LIM
BUILDING PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
GREENHOUSE PROPERTY LINE Issuance up to Issued for Construction] are intended to be at that level of
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.
MATCHLINE SHEET L1.05

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
INTERNATIONAL DRIVE
G

G
F

F
E

E
FUTURE DEVELOPMENT
EXISTING PLANTING TO REMAIN
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

STORAGE BUILDING -12"


-12"

-24"

-24"
-12"

-36"
-24"

-36"

-42"
-36"

19'-1"
MATCHLINE SHEET L1.05

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

JMS 20230011
F WORK

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

LIMIT O

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L1.06
A

A
0 20 40

MATCHLINE SHEET L1.09 MATCHLINE SHEET L1.09 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.04 MATCHLINE SHEET L1.04


LEGEND
WATERWAY BAR & GRILL

MATCHLINE SHEET L1.08


TREE TO BE REMOVED
L

L
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
G

G
F

F
STORAGE STORAGE
BUILDING BUILDING
BOH
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

STORAGE BUILDING
C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"

MATCHLINE SHEET L1.08


-24"

-24" -24"

C
-24"

A
B
-24"

JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L1.07
A

A
0 20 40

CENTRAL FLORIDA PARKWAY


Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.05 MATCHLINE SHEET L1.05


LEGEND
MATCHLINE SHEET L1.07
TREE TO BE REMOVED

MATCHLINE SHEET L1.09


LIMIT OF WORK
L

L
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for

PROPERTY LINE
complete and coordinated pricing [and execution] of the Work, and shall

LIMIT OF WORK
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

ISSUANCES
ISSUANCES
No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
01 IDD
IDD Submission 11/20/23
NOTES 1 IDD
IssueSubmittal
for IDD
Package 11/20/2023
11/20/2023
11/22/23
H

H
G

G
R K
WO
O F
M IT
F

F
LI
E

E
MATCHLINE SHEET L1.09
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
FUTURE DEVELOPMENT
EXISTING PLANTING TO REMAIN
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"
MATCHLINE SHEET L1.07

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

JMS 20230011
Designed By Project No.

DB 11/20/23
11/22/23
11/10/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NORTH NW
W AY SCALE: 1" = 20'-0" Drawn By
L1.08
A

A
P A R K
IDA
AL FLOR
0 20 40

CENTR Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


LIMIT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.06 MATCHLINE SHEET L1.06


LEGEND

RK
TREE TO BE REMOVED

O
MATCHLINE SHEET L1.05

OF W
L

L
LIMIT
PALM TO BE REMOVED
K

K
LIMIT OF WORK
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PROPERTY LINE development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.08

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
G

G
FUTURE DEVELOPMENT
EXISTING PLANTING TO REMAIN
F

F
RK
O
E

E
W
OF
IT
LIM

PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

TREE REMOVAL PLAN


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"
MATCHLINE SHEET L1.08

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-24" -24"

C
-24"

A
B
-24"

JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

Y JMS
9/19/2023 3:46:56 PM

W A
PARK Checked By

A NORTH NW
FLORID SCALE: 1" = 20'-0" Drawn By
L1.09
A

A
RA L
ENT
0 20 40
C
Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Point Northing Easting Elevation Species


Caliper
(Inch)
Protected
Zone
Protected
(yes/no)
Replacement Ratio Point Northing Easting Elevation Species
Caliper
(Inch)
Protected
Zone
Protected
(yes/no)
Replacement Ratio TREE MITIGATION CALCULATIONS
40701 481.7246 62.9214 91.6085 PALM 15 C No N/A 40789 -93.3738 -667.0976 88.8769 CRAPE MYRTLE N/A A No N/A
40703 564.6457 30.6505 90.0521 PALM 10 C No N/A 40790 -92.1387 -663.81 89.3519 CRAPE MYRTLE N/A A No N/A
REQUIRED REPLACEMENT
L

L
40704 632.4779 29.5558 89.5509 PALM 10 C No N/A 40791 -100.9242 -666.4126 89.1294 CRAPE MYRTLE N/A A No N/A
Total DBH Removed Replacement Ratio Required Replacement
40707 705.0351 26.1766 89.1532 OAK 20 C No N/A 40792 -103.913 -665.8014 89.0513 CRAPE MYRTLE N/A A No N/A Protected Tree Type
(Inches) (Inches) (Inches)
40708 662.0435 -40.2653 89.187 CRAPE MYRTLE N/A C No N/A 40793 -108.109 -665.6377 89.3124 CRAPE MYRTLE N/A A No N/A
40709 475.2508 -86.0254 89.0272 OAK 19 C No N/A 40794 -111.2205 -666.1271 89.3288 CRAPE MYRTLE N/A A No N/A Protected 306 1:1 306
40710 474.2385 -41.4522 88.965 CRAPE MYRTLE N/A C No N/A 40795 -115.0739 -666.2168 89.0199 CRAPE MYRTLE N/A A No N/A Protected - Specimen 326 2:1 652
40711 422.4748 -28.1653 89.0749 OAK 24 C Yes 2 Cal. In. : 1 DBH In. Removed 40796 -118.681 -666.4263 88.8889 CRAPE MYRTLE N/A A No N/A
40712 391.5434 -28.4758 89.6232 OAK 18 C No N/A 40797 -122.2507 -666.811 88.5332 CRAPE MYRTLE N/A A No N/A
Total 958
40713 377.2119 -28.6867 89.3418 CRAPE MYRTLE N/A C No N/A 40798 -129.3804 -666.7071 89.1417 CRAPE MYRTLE N/A A No N/A
40714 344.6823 -28.6117 89.7527 CRAPE MYRTLE N/A C No N/A 40799 -133.4851 -666.8087 88.7888 CRAPE MYRTLE N/A A No N/A
K

K
40715 312.202 -27.3268 90.0109 OAK 17 C No N/A 40800 -135.7455 -666.2145 90.7764 CRAPE MYRTLE N/A A No N/A
PROVIDED MITIGATION The Contract Documents Issued for [Conceptual Design, Schematic
40716 280.4235 -28.8407 89.3083 CRAPE MYRTLE N/A C No N/A 40801 -141.0004 -667.7871 89.1292 CRAPE MYRTLE N/A A No N/A Design, Design Development, Partial Construction Documents or Other
40717 246.7168 -28.3229 89.6769 CRAPE MYRTLE N/A C No N/A 40802 -154.5529 -655.8279 89.1744 CRAPE MYRTLE N/A A No N/A Required Issuance up to Issued for Construction] are intended to be at that level of
Replacement Tree Replacement Replacement Trees development and as such, may be neither complete nor coordinated. The
40718 217.3982 -28.1161 89.6902 CRAPE MYRTLE C No Replacement Caliper
N/A N/A 40807 -149.6372 -605.633 89.398 TABEBUIA 6 A No N/A Caliper (Inches) Trees Provided [Construction Manager, Contractor, Design/Builder] is responsible for
(Inches) complete and coordinated pricing [and execution] of the Work, and shall
40721 182.1015 -27.5436 89.6092 OAK 33 C Yes 2 Cal. In. : 1 DBH In. Removed 40826 -219.9115 -653.4785 88.876 OAK 26 A Yes 2 Cal. In. : 1 DBH In. Removed
958 3 320 TBD* include items necessary for the proper execution and completion of the
40722 190.8195 25.2421 89.5661 OAK 21 C No N/A 40827 -156.7977 -661.1391 89.304 OAK 35 A Yes 2 Cal. In. : 1 DBH In. Removed Work, as shown, specified, reasonably inferred or required for a complete
40723 230.6238 -148.3554 88.9535 CRAPE MYRTLE N/A C No N/A 40857 -57.6328 -684.0662 88.38 CRAPE MYRTLE N/A A No N/A Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
40724 255.4716 -149.1101 88.8286 CRAPE MYRTLE N/A C No N/A 40858 -55.493 -679.3296 87.9984 PALM 8 A No N/A requirements. The [Construction Manager, Contractor, Design/Builder]
Total Caliper Tree Fund Fee
40725 280.2092 -98.7263 88.9157 CRAPE MYRTLE N/A C No N/A 40859 -71.0095 -684.9674 88.5246 CRAPE MYRTLE N/A A No N/A Protected Tree Type Required Fee shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
Removed (Per Caliper In.) omissions, inconsistencies or errors in the Contract Documents.
40726 344.4424 -148.6987 88.1512 CRAPE MYRTLE N/A C No N/A 40860 -86.577 -679.4022 90.2129 ELAEOCARPUS 8 A No N/A
Protected 306 $106.00 $32,436.00
40727 377.8945 -148.3806 87.9929 CRAPE MYRTLE N/A C No N/A 40861 -86.0753 -680.9558 88.5168 ELAEOCARPUS 8 A No N/A
40728 405.1492 -148.2758 88.2648 CRAPE MYRTLE N/A C No N/A 40862 -88.4967 -680.7509 88.5819 ELAEOCARPUS 7 A No N/A
Protected - Specimen 326 $212.00 $69,112.00
40729 479.9422 -237.8952 88.0986 CRAPE MYRTLE N/A C No N/A 40863 -90.3451 -682.3618 88.515 ELAEOCARPUS 6 A No N/A
ISSUANCES
40730 443.6052 -242.7071 88.1354 OAK 22 C No N/A 40864 -91.0315 -681.4428 88.5108 ELAEOCARPUS 6 A No N/A Total $101,548.00
40731 387.6237 -242.051 89.0172 OAK 20 C No 40865 -90.6308 -680.435 88.351 ELAEOCARPUS 6 A No
No. Drawing Issue Description Date
N/A N/A
40732 291.5594 -246.3271 89.3932 OAK 28 C Yes 2 Cal. In. : 1 DBH In. Removed 40866 -82.7936 -672.7946 88.5723 TABEBUIA 3 A No N/A
01 IDD
IDD Submission
Package 11/20/23
11/22/23
NOTE:
40733 180.9629 -242.234 89.4029 OAK 20 C No N/A 40867 -144.0036 -682.0802 88.6723 ELAEOCARPUS 7 A No N/A 1. MITIGATION CALCULATIONS TO BE FINALIZED AT SUBMITTAL OF
H

H
40734 181.686 -311.6907 89.4241 OAK 26 C Yes 2 Cal. In. : 1 DBH In. Removed 40868 -144.0814 -681.2322 88.5188 ELAEOCARPUS 6 A No N/A BUILDING PERMIT DOCUMENTS.
40735 215.452 -311.4206 88.6473 CRAPE MYRTLE N/A C No N/A 40869 -143.5681 -680.8618 88.4243 ELAEOCARPUS 7 A No N/A
40736 254.5837 -312.2542 88.5294 CRAPE MYRTLE N/A C No N/A 40870 -144.4511 -679.4703 88.4027 ELAEOCARPUS 7 A No N/A
40737 291.9846 -312.4043 88.7795 OAK 24 C Yes 2 Cal. In. : 1 DBH In. Removed 40871 -143.2732 -682.9231 88.3332 ELAEOCARPUS 7 A No N/A
40738 324.6476 -312.5425 88.2466 CRAPE MYRTLE N/A C No N/A 40872 -141.4972 -681.8957 88.3828 ELAEOCARPUS 7 A No N/A
40739 363.5583 -312.7403 88.2543 OAK 23 C No N/A 40873 -140.5238 -681.4065 88.093 ELAEOCARPUS 6 A No N/A
40740 403.6644 -312.5324 88.03 CRAPE MYRTLE N/A C No N/A 40874 -138.6874 -682.5696 88.3634 ELAEOCARPUS 7 A No N/A
40741 422.6448 -312.7997 87.8417 CRAPE MYRTLE N/A C No N/A 40875 -140.462 -678.6819 88.3046 ELAEOCARPUS 7 A No N/A
40742 444.4072 -313.8578 88.4455 OAK 19 C No N/A 41420 121.4417 -593.1907 87.4669 TABEBUIA 4 A No N/A
G

G
40743 490.26 -316.6136 88.3075 CRAPE MYRTLE N/A C No N/A 41421 161.9488 -592.1013 87.2023 ELAEOCARPUS 3 A No N/A
40744 473.8387 -392.8297 88.0311 CRAPE MYRTLE N/A C No N/A 41422 184.2319 -602.7668 84.4529 CYP 11 A Yes 1 Cal. In. : 1 DBH In. Removed
40745 434.3388 -384.7383 88.143 TABEBUIA 9 C No N/A 41423 210.3287 -595.7141 84.1557 CYP 8 A Yes 1 Cal. In. : 1 DBH In. Removed
40746 437.7546 -397.9929 88.3332 CRAPE MYRTLE N/A C No N/A 41424 230.2232 -588.657 84.2699 CYP 7 A No N/A
40747 403.208 -382.1961 88.2358 CRAPE MYRTLE N/A C No N/A 41425 254.3568 -576.7217 85.5685 CYP 12 A Yes 1 Cal. In. : 1 DBH In. Removed
40748 363.5078 -383.4833 88.1343 OAK 21 C No N/A 41426 256.4874 -554.3037 87.5766 PALM 15 A No N/A
40749 324.3955 -382.5945 88.4294 CRAPE MYRTLE N/A C No N/A 41427 284.5987 -568.0712 84.3007 CYP 7 A No N/A
40750 292.5129 -382.5228 89.0863 OAK 32 C Yes 2 Cal. In. : 1 DBH In. Removed 41428 298.5045 -543.371 88.1838 OAK 11 A Yes 1 Cal. In. : 1 DBH In. Removed
40751 254.9078 -382.7208 88.735 CRAPE MYRTLE C No 41429 320.1194 -555.0108 85.7909 CYP 12 A Yes
F

F
N/A N/A 1 Cal. In. : 1 DBH In. Removed
40752 214.8003 -381.855 88.6267 CRAPE MYRTLE N/A C No N/A 41430 359.252 -547.034 82.4125 CYP 5 A No N/A
40753 182.2688 -383.6074 88.9237 OAK 20 C No N/A 41431 391.921 -531.2106 84.7609 CYP 13 A Yes 1 Cal. In. : 1 DBH In. Removed
40754 181.4117 -453.2512 88.8821 OAK 18 C No N/A 41433 426.0679 -490.2902 88.5504 OAK 11 A Yes 1 Cal. In. : 1 DBH In. Removed
40755 289.5002 -452.8869 89.0587 OAK 20 C No N/A 41435 447.3515 -468.6756 88.621 OAK 10 A Yes 1 Cal. In. : 1 DBH In. Removed
40756 350.6798 -452.4168 88.5422 OAK 16 A Yes 1 Cal. In. : 1 DBH In. Removed 41436 490.9819 -434.4445 85.9429 CYP 13 A Yes 1 Cal. In. : 1 DBH In. Removed
40757 380.9707 -452.9606 88.6032 OAK 20 A Yes 1 Cal. In. : 1 DBH In. Removed 41437 502.6714 -425.9255 85.7715 CYP 15 A Yes 1 Cal. In. : 1 DBH In. Removed
40758 414.2819 -440.5211 88.6013 OAK 17 A Yes 1 Cal. In. : 1 DBH In. Removed 41854 89.6195 -60.0251 89.4077 CYP 13 B Yes 1 Cal. In. : 1 DBH In. Removed
40759 459.8421 -431.8922 88.1891 CRAPE MYRTLE N/A A No N/A 41855 106.6162 -74.6891 89.4077 CYP 7 C No N/A
E

E
40760 428.1774 -477.9929 88.196 CRAPE MYRTLE N/A A No N/A 41856 87.5349 -85.0964 89.4077 CYP 10 B Yes 1 Cal. In. : 1 DBH In. Removed
40762 351.9028 -520.2385 88.0811 PALM 12 A No N/A 41857 89.4179 -35.3286 89.5685 CYP 11 B Yes 1 Cal. In. : 1 DBH In. Removed
40763 340.8044 -523.086 88.0963 CRAPE MYRTLE N/A A No N/A 41858 107.2255 -46.4591 89.5685 CYP 7 C No N/A
40764 283.7218 -539.3144 88.1773 PALM 9 A No N/A 41893 34.0733 88.5875 91.2225 CYP 16 B Yes 1 Cal. In. : 1 DBH In. Removed
40765 274.3324 -542.9806 88.2115 PALM 8 A No N/A 42126 520.8342 -107.1574 87.2725 OAK 24 C Yes 2 Cal. In. : 1 DBH In. Removed
40766 291.8381 -503.8789 88.4071 CRAPE MYRTLE N/A A No N/A 42173 562.2101 -102.7136 88.3963 OAK 25 C Yes 2 Cal. In. : 1 DBH In. Removed
40767 263.7778 -510.3366 88.8351 OAK 18 A Yes 1 Cal. In. : 1 DBH In. Removed 42185 632.5541 -102.1184 88.0693 OAK 24 C Yes 2 Cal. In. : 1 DBH In. Removed
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

40768 235.1307 -522.6227 89.1661 OAK 23 A Yes 1 Cal. In. : 1 DBH In. Removed 42193 669.7591 -101.9387 86.4518 OAK 25 C Yes 2 Cal. In. : 1 DBH In. Removed
40769 206.9681 -522.3477 88.4973 CRAPE MYRTLE N/A A No N/A 42194 661.845 -117.6416 86.4518 CYP 9 C No N/A
IDD PACKAGE
D

D
40770 195.7527 -524.4398 88.5991 CRAPE MYRTLE N/A A No N/A 42251 661.9312 -136.5714 86.9049 CYP 11 C No N/A
40771 181.6648 -506.8627 88.2734 CRAPE MYRTLE N/A A No N/A 42277 721.7482 -39.3296 87.0068 CYP 27 C Yes 1 Cal. In. : 1 DBH In. Removed
40772 226.1945 -563.4801 87.9529 CRAPE MYRTLE N/A A No N/A 43108 876.1574 548.7393 91.4864 OAK 19 A Yes 2 Cal. In. : 1 DBH In. Removed
40773 217.2975 -567.3978 87.8887 CRAPE MYRTLE N/A A No N/A 43110 883.4408 573.7251 91.4864 OAK 5 A No N/A
40774 203.0572 -572.1445 87.8348 CRAPE MYRTLE N/A A No N/A 43245 893.5261 620.9805 92.8962 PALM 12 A No N/A
40775 174.6099 -574.8016 87.8312 CRAPE MYRTLE N/A A No N/A 43948 623.2307 74.3766 90.6912 OAK 22 C No N/A
40776 165.4309 -581.9081 87.8674 CRAPE MYRTLE N/A A No N/A 43952 700.0262 71.7343 91.1261 PALM 4 C No N/A 7007 SeaWorld Dr, Orlando, FL 32821
PALM 4 No
40777 153.0789 -582.6117 87.6641 CRAPE MYRTLE N/A A No N/A 43967 716.9186 155.2001 91.1872 C N/A

C

C
40778 139.4098 -585.4031 87.6936 CRAPE MYRTLE A No 43968 705.4541 130.2468 90.6104 PALM 6 C No N/A
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

N/A N/A
40779 145.3368 -518.9001 88.3501 CRAPE MYRTLE N/A A No N/A 43969 716.0617 128.3366 90.4563 PALM 11 C No N/A
SEAWORLD
40780 142.9972 -528.3077 88.1031 CRAPE MYRTLE N/A A No N/A 43970 713.6151 116.0857 90.4563 PALM 11 C No N/A
40781 133.4226 -531.6728 87.9957 CRAPE MYRTLE A No 43971 714.7648 102.4794 90.4563 PALM 11 C No N/A
40782 102.4514 -591.7056 86.9357 CRAPE MYRTLE
N/A
N/A A No
N/A
N/A 43972 737.0392 93.7942 89.9672 PALM 11 A No N/A
TREE REMOVAL SHEDULE
40783 96.9411 -591.0245 86.9967 CRAPE MYRTLE N/A A No N/A 43973 562.103 72.3465 91.2193 PALM 12 C No N/A & CALCULATIONS
40784 90.5221 -590.9999 86.6798 CRAPE MYRTLE N/A A No N/A 43991 -251.378 -686.9135 88.8864 PALM 9 A No N/A
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

40784 90.5221 -590.9999 86.6798 CRAPE MYRTLE N/A A No N/A 43992 -249.5048 -678.9167 88.8864 PALM 12 A No N/A
40785 -4.3526 -684.0189 88.4704 PALM 14 A No N/A 43993 -241.8176 -684.9382 88.8864 PALM 12 A No N/A
B

B
40787 -83.4845 -665.74 89.3651 CRAPE MYRTLE N/A A No N/A 43994 -240.0492 -677.1199 88.8864 PALM 12 A No N/A
40788 -88.7523 -666.6782 89.1434 CRAPE MYRTLE N/A A No N/A 43996 -225.716 -679.1032 91.397 PALM 11 A No N/A
JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NW
Drawn By
L1.30
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

TREE LEGEND

CANOPY TREE
L

L
UNDERSTORY TREE
PALM LEGEND

L2.01
DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

PLANTING LEGEND

LIMIT OF
WORK
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
L2.03
LIMIT OF WORK LIMIT OF WORK

NOTES

L2.02 1. PLANTING MATERIAL


G

G
-18"

TO BE FINALIZED AT
THE SUBMITTAL OF
-18"

BUILDING PERMIT
-18"

K
OR
DOCUMENTS.

W
OF
IT
LIM
LIMIT OF WORK

2. SEE SHEET L2.10 FOR

INTERNATIONAL DRIVE
LIMIT OF WORK
F

F
PROPOSED TYPICAL
PLANTING MATERIAL.
LIMIT OF WORK

L2.06
LIMIT OF WORK

L2.04 L2.05
######

A
B

LIMIT OF WORK
E

E
WORK
LIMIT OF
ORK
OF W
PROJECT STARBOARD

LIMIT
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

FD

FUTURE
FD

IDD PACKAGE
D

D
DISCONNECT

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

MOTOR

MOTOR

MOTOR
MOTOR

MOTOR

DEVELOPMENT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
MOTOR

MOTOR

FD

LIMIT OF WORK

FUTURE

L2.07
DEVELOPMENT

L2.08 LIM
IT
OF
W
OR
K

L2.09 KEY PLAN


7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

WO
RK
SEAWORLD
OF
IT
LIM

LIMIT OF WORK

OVERALL LANDSCAPE
LIMIT OF WORK

-18"

-18"
-18"
PLAN
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

LIMIT OF WORK

INTERNATIONAL DRIVE
######
B

B
C

A
B

LIMIT OF WORK
R I D A P ARKWAY FD

LIMIT OF WORK

L FLO JMS 20230011


FD

CENTRA

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By

NW
SCALE: 1" = 100'-0" Drawn By
L2.00
A

A
0 100 200

Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

TREE LEGEND

CANOPY TREE
L

L
UNDERSTORY TREE
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
NOTES
1. PLANTING MATERIAL
G

G
TO BE FINALIZED AT

NO SCOPE ON 2.
THE SUBMITTAL OF
BUILDING PERMIT
DOCUMENTS.

SEE SHEET L2.10 FOR

THIS SHEET
F

F
PROPOSED TYPICAL
PLANTING MATERIAL.
E

E
INTER
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
NATIO
NAL D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

RIVE

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN
-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
######
B

B
C

A
B

FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L2.01
A

A
0 20 40

MATCHLINE SHEET L1.03 Feet


MATCHLINE SHEET L1.03 Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

TREE LEGEND

MATCHLINE SHEET L1.03


CANOPY TREE
L

L
UNDERSTORY TREE
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
LIMIT OF WORK SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
NOTES
1. PLANTING MATERIAL
G

G
TO BE FINALIZED AT
THE SUBMITTAL OF
BUILDING PERMIT
DOCUMENTS.

2. SEE SHEET L2.10 FOR


F

F
PROPOSED TYPICAL
PLANTING MATERIAL.
E

E
-18"

MATCHLINE SHEET L1.03


PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

-18"

IDD PACKAGE
D

D
-18"

KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN

MATCHLINE SHEET L1.06


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
######
B

B
C

A
B
LIMIT OF WORK

FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L2.02
A

A
0 30 60

MATCHLINE SHEET L1.05 MATCHLINE SHEET L1.05 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.01 MATCHLINE SHEET L1.01


TREE LEGEND

CANOPY TREE

LIMIT O
F WORK
L

L
UNDERSTORY TREE
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
MATCHLINE SHEET L1.02

components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
NOTES
LIMIT OF WORK
1. PLANTING MATERIAL
G

G
TO BE FINALIZED AT
THE SUBMITTAL OF
BUILDING PERMIT
DOCUMENTS.

2. SEE SHEET L2.10 FOR


F

F
PROPOSED TYPICAL
PLANTING MATERIAL.

INTERNATIONAL DRIVE
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN
-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.02

######
B

B
C

A
B

FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L2.03
A

A
0 30 60

MATCHLINE SHEET L1.06 MATCHLINE SHEET L1.06 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

TREE LEGEND

NAUTILUS THEATER CANOPY TREE

MATCHLINE SHEET L1.05


L

L
UNDERSTORY TREE
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

CONNECTION TO EXISTING SEAWORLD ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code

THEME PARK TO BE COORDINATED LIMIT OF WORK BAMBOO


requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.
WITH SEAWORLD OPERATIONS
PLANTING LEGEND

LIMIT OF WORK
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
NOTES
1. PLANTING MATERIAL
G

G
TO BE FINALIZED AT
THE SUBMITTAL OF
BUILDING PERMIT
LIMIT OF WORK
DOCUMENTS.

2. SEE SHEET L2.10 FOR


F

F
PROPOSED TYPICAL
STABLE PLANTING MATERIAL.
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN
-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
######
B

B
C

A
B

MATCHLINE SHEET L1.05


FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By

NORTH NW
WATERWAY BAR & GRILL SCALE: 1" = 20'-0" Drawn By
L2.04
A

A
0 30 60

MATCHLINE SHEET L1.07 MATCHLINE SHEET L1.07 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.02 MATCHLINE SHEET L1.02


TREE LEGEND

MATCHLINE SHEET L1.04 CANOPY TREE

MATCHLINE SHEET L1.06


LIMIT OF WORK
L

L
UNDERSTORY TREE
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
NORTH
######
H

H
RESTROOMS NOTES
1. PLANTING MATERIAL
G

G
TO BE FINALIZED AT
THE SUBMITTAL OF
BUILDING PERMIT
C

TOWEL
A
B

DOCUMENTS.
HUT
2. SEE SHEET L2.10 FOR
F

F
PROPOSED TYPICAL
PLANTING MATERIAL.
E

E
MATCHLINE SHEET L1.06
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN

MATCHLINE SHEET L1.09


-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.04

######

MEP
FD
B

B
C

A
B

BUILDING
FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

FD
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L2.05
A

A
DISCONNECT

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

MOTOR

MOTOR

MOTOR
MOTOR

MOTOR

0 30 60

MATCHLINE SHEET L1.08 MATCHLINE SHEET L1.08 Feet


DISCONNECT

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

MOTOR

MOTOR

MOTOR
MOTOR

MOTOR
MOTOR

MOTOR

FD

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.03 MATCHLINE SHEET L1.03


TREE LEGEND

MATCHLINE SHEET L1.02 CANOPY TREE

RK
WO
L

L
UNDERSTORY TREE

OF
IT
LIM
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.
MATCHLINE SHEET L1.05

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
NOTES
1. PLANTING MATERIAL

INTERNATIONAL DRIVE
G

G
TO BE FINALIZED AT
THE SUBMITTAL OF
BUILDING PERMIT
DOCUMENTS.

2. SEE SHEET L2.10 FOR


F

F
PROPOSED TYPICAL
FUTURE PLANTING MATERIAL.
DEVELOPMENT
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN
-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.05

######
B

B
C

A
B
F WORK

FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
LIMIT O

Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By

NORTH NW
SCALE: 1" = 20'-0" Drawn By
L2.06
A

A
0 30 60

MATCHLINE SHEET L1.09 MATCHLINE SHEET L1.09 Feet


Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.04 MATCHLINE SHEET L1.04


TREE LEGEND

WATERWAY BAR & GRILL CANOPY TREE

MATCHLINE SHEET L1.08


L

L
UNDERSTORY TREE
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
NOTES
1. PLANTING MATERIAL
G

G
TO BE FINALIZED AT
THE SUBMITTAL OF
BUILDING PERMIT
DOCUMENTS.

2. SEE SHEET L2.10 FOR


F

F
PROPOSED TYPICAL
STORAGE PLANTING MATERIAL.
STORAGE BUILDING
BUILDING BOH LIMIT OF WORK
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821
LIMIT OF WORK


STORAGE BUILDING
C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN
-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
######

MATCHLINE SHEET L1.08


B

B
C

A
B

FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

Checked By
LIMIT OF WORK NORTH NW
SCALE: 1" = 20'-0" Drawn By
L2.07
A

A
0 20 40
CENTRAL FLORIDA PARKWAY
Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

MOTOR

MOTOR
MOTOR

MOTOR
MOTOR
MATCHLINE SHEET L1.05 MATCHLINE SHEET L1.05
TREE LEGEND

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

MOTOR

MOTOR
MOTOR

MOTOR
MOTOR

MOTOR
MOTOR
FD

MATCHLINE SHEET L1.07 CANOPY TREE

MATCHLINE SHEET L1.09


LIMIT OF WORK
L

L
UNDERSTORY TREE
PALM LEGEND

DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
FUTURE Package 11/20/23
11/22/23

DEVELOPMENT
H

H
NOTES
1. PLANTING MATERIAL
G

G
TO BE FINALIZED AT
THE SUBMITTAL OF
BUILDING PERMIT
DOCUMENTS.
ORK
W
T OF 2. SEE SHEET L2.10 FOR
MI
F

F
LI PROPOSED TYPICAL
PLANTING MATERIAL.

LIMIT OF WORK
E

E
MATCHLINE SHEET L1.09
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
FUTURE
DEVELOPMENT
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN
-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.07

######
B

B
C

A
B

FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

PARKW AY
FLORIDA
CENTRAL

LIMIT OF WORK Checked By

NORTH NW
K WAY SCALE: 1" = 20'-0" Drawn By
L2.08
A

A
A P A R
L FLORID
0 30 60

CENTRA
Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MATCHLINE SHEET L1.06 MATCHLINE SHEET L1.06


TREE LEGEND

MATCHLINE SHEET L1.05 CANOPY TREE

K
L

L
WOR
UNDERSTORY TREE

OF
PALM LEGEND

LIMIT
DATE PALM
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
SABAL PALM development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall

ACCENT LEGEND include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]

BAMBOO shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.08

PLANTING LEGEND
ISSUANCES
PLANTING BED No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
NOTES

FUTURE 1. PLANTING MATERIAL


G

G
TO BE FINALIZED AT
DEVELOPMENT THE SUBMITTAL OF
BUILDING PERMIT
DOCUMENTS.

2. SEE SHEET L2.10 FOR


F

F
PROPOSED TYPICAL
PLANTING MATERIAL.

K
OR
E

E
W
OF
M IT
LI

PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

IDD PACKAGE
D

D
KEY PLAN
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

LANDSCAPE PLAN
-18"

-18"

-18"
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

INTERNATIONAL DRIVE
MATCHLINE SHEET L1.08

######
B

B
C

A
B

FD

JMS 20230011
FD

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

Y JMS
9/19/2023 3:46:56 PM

PARKW AY

KWA
FLORIDA
CENTRAL

AR
Checked By

A P NORTH NW
RID
F L O SCALE: 1" = 20'-0" Drawn By
L2.09
A

A
T RAL 0 30 60
CEN
Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PREVAILING
NOTE: WIND 1/2" Ø BLACK REINFORCED NOTE:
RUBBER HOSE - CONTRACTOR TO STAKE
- CONTRACTOR TO STAKE 120° 3/16" Ø GALVANIZED LOCATION OF TREES FOR
1/2" Ø BLACK LOCATION OF TREES FOR AIRCRAFT CABLE. SECURE APPROVAL BY OWNER'S
120 120 REINFORCED RUBBER HOSE APPROVAL BY OWNER'S ENDS WITH COMPRESSION REPRESENTATIVE PRIOR TO
POLYPROPYLENE GUYING STRAPS REPRESENTATIVE PRIOR TO 120° 120° SLEEVES INSTALLATION.
120 2500 LB TENSILE STRENGTH INSTALLATION GALVANIZED TURNBUCKLE
L

L
PLAN VIEW (3) 2" DIAMETER PRESSURE TREATED PLAN VIEW 3500 LBS CAPACITY - CONTRACTOR TO ASSURE
- CONTRACTOR TO ASSURE
LODGE POLE STAKES. INSTALL 2" AWAY OF STAKING SET ROOTBALL 3" ABOVE PERCOLATION IN ALL PLANTING
FROM ROOTBALL PERCOLATION IN ALL PLANTING FINISH GRADE PITS PRIOR TO INSTALLATION
(NOTE: TOP OF STAKES SHALL BE PITS PRIOR TO INSTALLATION (SEE LANDSCAPE NOTES /
BELOW CANOPY, TYP) (SEE LANDSCAPE NOTES / 4" HIGH SOIL BERM AROUNDSPECIFICATIONS).
SPECIFICATIONS) ROOTBALL

1/2 TREE HEIGHT


TOP OF ROOT BALL SHALL BE FLUSH
3" MULCH DEPTH, NO MORE - ALL TREES TO BE SET PLUMB
1/2 TREE HEIGHT

WITH FINISHED GRADE - ALL TREES TO BE SET PLUMB IN THAN 1" OF MULCH ON TOP IN PLANTING PIT.
4" MULCH DEPTH, NO MORE THAN 1" OF
PLANTING PIT OF ROOT BALL
MULCH ON TOP OF ROOT BALL PREPARED PLANTING SOIL - REMOVE BURLAP FROM TOP
K

K
4" HIGH SOIL BERM AROUND SEE LANDSCAPE NOTES / 1/3 OF ROOTBALL. The Contract Documents Issued for [Conceptual Design, Schematic
ROOTBALL COMPLETELY REMOVE ANY Design, Design Development, Partial Construction Documents or Other
SPECIFICATIONS

60°
Issuance up to Issued for Construction] are intended to be at that level of
FINISH GRADE FINISH GRADE SYNTHETIC WRAPPING development and as such, may be neither complete nor coordinated. The

PREPARED PLANTING SOIL - SEE 1/2" Ø x 30" LONG ANCHOR MATERIALS. [Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
LANDSCAPE NOTES / WITH 4" DIAMETER HELIX. include items necessary for the proper execution and completion of the

SPECIFICATIONS INSTALL 2" BELOW FINISH Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
GRADE components and materials shall comply with national, state and local code
EXISTING OR RECOMPACTED SOIL TO PREVENT ROOTBALL SETTLEMENT BOTTOM OF ROOT BALL
3X WIDEST requirements. The [Construction Manager, Contractor, Design/Builder]
RESTS ON EXISTING OR shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
PLAN VIEW DIM OF ROOTBALL omissions, inconsistencies or errors in the Contract Documents.
2X ROOTBALL DIA. RECOMPACTED SOIL

TREE STAKING UNDER 3 IN CALIPER TREE STAKING 3 TO 7 IN CALIPER


1 SCALE - 3/8" = 1'-0" 2 SCALE - 1/4" = 1'-0" ISSUANCES
No. Drawing Issue Description Date
PREVAILING
1/2" Ø BLACK REINFORCED 01 IDD
IDD Submission
Package 11/20/23
11/22/23
WIND PREVAILING
RUBBER HOSE NOTE: WIND NOTE:
- CONTRACTOR TO STAKE
H

H
5/16" Ø GALVANIZED - CONTRACTOR TO STAKE
90° 90° AIRCRAFT CABLE. SECURELOCATION OF TREES FOR 120° LOCATION OF TREES FOR
ENDS WITH COMPRESSIONAPPROVAL BY OWNER'S 1/2" Ø BLACK REINFORCED
REPRESENTATIVE PRIOR TO RUBBER HOSE APPROVAL BY OWNER'S
SLEEVES REPRESENTATIVE PRIOR TO
90° 90° INSTALLATION. 120° 120° POLYPROPYLENE GUYING
GALVANIZED TURNBUCKLE INSTALLATION.
STRAPS 2500 LB TENSILE
PLAN VIEW 5000 LBS CAPACITY
- CONTRACTOR TO ASSURE STRENGTH
OF STAKING SET ROOTBALL 4" ABOVE PERCOLATION IN ALL PLANTING PLAN VIEW - CONTRACTOR TO ASSURE
(3) 2" DIAMETER P.T. LODGE
FINISH GRADE PITS PRIOR TO INSTALLATION OF STAKING PERCOLATION IN ALL PLANTING
POLES, STAKE LOCATION
3" MULCH DEPTH, NO (SEE LANDSCAPE NOTES / PITS PRIOR TO INSTALLATION
SHALL NOT INTERFERE WITH
(SEE LANDSCAPE NOTES /
G

G
MORE THAN 1" OF MULCH SPECIFICATIONS). BRANCHING
1/2 TREE HEIGHT

ON TOP OF ROOT BALL SPECIFICATIONS).


SET ROOTBALL 2" ABOVE
4" HIGH SOIL BERM - ALL TREES TO BE SET PLUMB FINISH GRADE
AROUND ROOTBALL IN PLANTING PIT. - ALL TREES TO BE SET PLUMB
4" HIGH SOIL BERM AROUND IN PLANTING PIT.
3/4" Ø x 48" LONG ANCHOR ROOTBALL
WITH 6" DIAMETER HELIX. - REMOVE BURLAP FROM TOP

1/2 TREE
3" MULCH DEPTH, NO MORE - REMOVE BURLAP FROM TOP

HEIGHT
INSTALL 2" BELOW FINISH 1/3 OF ROOTBALL.
60°

COMPLETELY REMOVE ANY THAN 1" OF MULCH ON TOP OF 1/3 OF ROOTBALL.


GRADE ROOT BALL COMPLETELY REMOVE ANY
FINISH GRADE SYNTHETIC WRAPPING
FINISH GRADE SYNTHETIC WRAPPING
PREPARED PLANTING SOILMATERIALS.
F

F
MATERIALS.
SEE LANDSCAPE NOTES / PREPARED PLANTING SOIL
SPECIFICATIONS SEE LANDSCAPE NOTES /
SPECIFICATIONS
COMPACT SOIL UNDER
ROOTBALL TO PREVENT COMPACT SOIL UNDER
SETTLEMENT 2X ROOTBALL DIA. ROOTBALL TO PREVENT
2X ROOTBALL DIA. SETTLEMENT

TREE STAKING OVER 7 IN CALIPER TREE STAKING MULTI-TRUNK TREE


E

E
3 SCALE - 3/16" = 1'-0" 4 SCALE - 1/4" = 1'-0"

PLAN FACE OF WALL OR BUILDING.


NOTE: LEAN NURSERY STAKE AGAINST THE WALL. STAKE TO BE
1. CONTRACTOR SHALL REMOVED AT THE END OF THE MAINTENANCE (WARRANTY)
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

ASSURE PERCOLATION OF PERIOD AFTER THE VINE HAS ATTACHED TO THE WALL.
ALL PLANTING PITS PRIOR VINE.
IDD PACKAGE
D

D
PROTECT TREE TRUNK WITH BLACK TO INSTALLATION. ROOT BALL.
RUBBER HOSE 2. FINAL TREE STAKING
DETAILS AND PLACEMENT 4" X 8" WIDE ROUND - TOPPED SOIL BERM ABOVE ROOT
#10 GUAGE WIRE BALL SURFACE SHALL BE CONSTRUCTED AROUND THE ROOT
TO BE APPROVED BY
THREE 2"X4"X8" STAKES SPACE BALL. BERM SHALL BEGIN AT ROOT BALL PERIPHERY.
OWNER
EVENLY AROUND TREE PAINTED PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT
BROWN BALL IN 6" LIFTS TO BRACE SHRUB. DO NOT OVER COMPACT.
3" MINIMUM OF MULCH WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR 7007 SeaWorld Dr, Orlando, FL 32821
WATER AROUND THE ROOT BALL TO SETTLE THE SOIL.
SOLID BERM TO HOLD WATER
4" LAYER OF MULCH. NO MORE THAN 1" OF MULCH ON ♦
C

C
FINISHED GRADE
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

BEYOND THE TOP OF THE ROOT BALL. (SEE SPECIFICATIONS FOR SEAWORLD
FINISHED GRADE (SEE GRADING MULCH).
PLAN) PAVEMENT.
B&B OF CONTAINERIZED (SEE
FINISHED GRADE. LANDSCAPE DETAILS
MODIFIED SOIL. DEPTH VARIES. (SEE SPECIFICATIONS FOR
SPECIFICATIONS FOR ROOT BALL SOIL MODIFICATION).
REQUIREMENTS)
ROOT BALL RESTS ON EXISTING OR RECOMPACTED SOIL.
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

PREPARED PLANTING SOIL AS


SPECIFIED EXISTING SOIL.
12"
NOTES:
B

B
1. VINES SHALL BE OF QUALITY AS PRESCRIBED IN THE ROOT OBSERVATIONS DETAIL AND SPECIFICATIONS.
2. SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL. JMS 20230011
Designed By Project No.
TREE STAKING SMALL TREE ON SLOPE VINE STAKING
5 SCALE - 3/8" = 1'-0" 6 SCALE - 3/8" = 1'-0"
DB
Approved By
11/22/23
11/20/23
Date

JMS
9/19/2023 3:46:56 PM

Checked By

NW
Drawn By
L2.20
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PREVAILING PREVAILING
WIND NOTE: WIND NOTE:
- CONTRACTOR TO STAKE - CONTRACTOR TO STAKE
120° LOCATION OF TREES FOR LOCATION OF TREES FOR
APPROVAL BY OWNER'S 90° 90°
APPROVAL BY OWNER'S
REPRESENTATIVE PRIOR TO REPRESENTATIVE PRIOR TO
120° 120° INSTALLATION. 90° 90° PRUNE AND TIE FRONDS WITH HEMP TWINE INSTALLATION.
L

L
PLAN VIEW (3) 2"X4"X12" NOTCHED, FOAM OR BURLAP - CONTRACTOR TO ASSURE PLAN VIEW (4) 2"X4"X12" NOTCHED, FOAM OR BURLAP - CONTRACTOR TO ASSURE
OF STAKING BACKED PT WOOD BATONS, TO PREVENT PERCOLATION IN ALL PLANTING OF STAKING BACKED PT WOOD BATONS, TO PREVENT PERCOLATION IN ALL PLANTING
STEEL BANDS FROM CONTACTING TRUNK PITS PRIOR TO INSTALLATION STEEL BANDS FROM CONTACTING TRUNK PITS PRIOR TO INSTALLATION
(SEE LANDSCAPE NOTES / (2) ADJUSTABLE GALVANIZED STEEL BANDS (SEE LANDSCAPE NOTES /
(2) ADJUSTABLE GALVANIZED STEEL BANDS
SPECIFICATIONS).
(3) 2"X4" PT WOOD BRACE SET AT 120°. NAIL (4) 2"X4" PT WOOD BRACE SET AT 90°. NAIL SPECIFICATIONS).
(AND DRILL IF NEEDED) TO BATONS AND STAKES (AND DRILL IF NEEDED) TO BATONS AND
- ALL TREES TO BE SET PLUMB - ALL TREES TO BE SET PLUMB
STAKES
SET ROOTBALL 2" ABOVE FINISH GRADE IN PLANTING PIT. IN PLANTING PIT.
SET ROOTBALL 2" ABOVE FINISH GRADE
1/3 CLEAR

1/3 CLEAR
HEIGHT

4" HIGH SOIL BERM AROUND ROOTBALL


TRUNK

HEIGHT
TRUNK
- REMOVE BURLAP FROM TOP 4" HIGH SOIL BERM AROUND ROOTBALL
K

K
- REMOVE BURLAP FROM TOP
3" MULCH DEPTH,NO MORE THAN 1" OF MULCH 1/3 OF ROOTBALL. 3" MULCH DEPTH, NO MORE THAN 1" OF 1/3 OF ROOTBALL. The Contract Documents Issued for [Conceptual Design, Schematic
60°

60°
ON TOP OF ROOT BALL COMPLETELY REMOVE ANY MULCH ON TOP OF ROOT BALL COMPLETELY REMOVE ANY Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
FINISH GRADE SYNTHETIC WRAPPING FINISH GRADE SYNTHETIC WRAPPING development and as such, may be neither complete nor coordinated. The
2"x4"x36" PT WOOD STAKES, INSTALL 2" BELOW MATERIALS. (4) 2"x4"x36" PT WOOD STAKES, INSTALL 2" MATERIALS. [Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
FINISH GRADE. BELOW FINISH GRADE. include items necessary for the proper execution and completion of the
PREPARED PLANTING SOIL - SEE LANDSCAPE - ALL WOOD BRACING MEMBERS PREPARED PLANTING SOIL - SEE LANDSCAPE - ALL WOOD BRACING MEMBERS Work, as shown, specified, reasonably inferred or required for a complete
NOTES/SPECIFICATIONS SHALL BE STAINED PRIOR TO SHALL BE STAINED PRIOR TO Project. For Work of delegated designs; systems, assemblies,
NOTES/SPECIFICATIONS components and materials shall comply with national, state and local code
INSTALLATION. STAIN COLOR INSTALLATION. STAIN COLOR
COMPACT SOIL UNDER ROOTBALL TO PREVENT COMPACT SOIL UNDER ROOTBALL TO requirements. The [Construction Manager, Contractor, Design/Builder]
2X ROOTBALL DIA. TO BE SELECTED BY OWNER OR 2X ROOTBALL DIA. TO BE SELECTED BY OWNER OR shall inform the Owner and Architect, in timely fashion, of any discovered
SETTLEMENT
J

J
OWNERS REPRESENTATIVE. PREVENT SETTLEMENT omissions, inconsistencies or errors in the Contract Documents.
OWNERS REPRESENTATIVE.

SMALL TRUNK PALM PLANTING MEDIUM TRUNK PALM PLANTING


1 SCALE - 1/4" = 1'-0" 2 SCALE - 1/4" = 1'-0" ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
PREVAILING USE O.C. SPACING SETBACK FOR

O.C. SPACING
WIND NOTE: LANDSCAPE FROM ALL BUILDING FACES
NOTE:
H

H
- CONTRACTOR TO STAKE BUILDING FACE

ING
LOCATION OF TREES FOR - CONTRACTOR TO DELINEATE
90° 90° OUTLINE OF PLANTING BEDS

AC
APPROVAL BY OWNER'S

.SP
PRUNE AND TIE FRONDS WITH HEMP TWINEREPRESENTATIVE PRIOR TO 18" SETBACK FOR SHRUBS AND 12" FOR REVIEW AND APPROVAL
SETBACK FOR GROUNDCOVERS BY OWNER'S REPRESENTATIVE.

O.C
90° 90° INSTALLATION.
FROM CURB, EDGE OF PAVEMENT,

12"
18"
PLAN VIEW (4) 2"X4"X12" NOTCHED, FOAM OR BURLAP - CONTRACTOR TO ASSURE OR ADJACENT BED LINES - CONTRACTOR TO ASSURE
OF STAKING BACKED PT WOOD BATONS, TO PREVENT PERCOLATION IN ALL PLANTING PERCOLATION IN ALL PLANTING
STEEL BANDS FROM CONTACTING TRUNK PITS PRIOR TO INSTALLATION CURB OR EDGE OF PAVEMENT
O.C. SPACING BEDS PRIOR TO INSTALLATION
(SEE LANDSCAPE NOTES /
G

G
(2) ADJUSTABLE GALVANIZED STEEL BANDS(SEE LANDSCAPE NOTES / G
A CIN SPECIFICATIONS)
(4) 2"X4" PT WOOD BRACE SET AT 90°. NAIL SPECIFICATIONS). . SP
(AND DRILL IF NEEDED) TO BATONS AND O.C
STAKES - ALL TREES TO BE SET PLUMB
IN PLANTING PIT.
3" MULCH DEPTH,NO MORE THAN 1" OF 12" SHRUBS / GROUNDCOVER TO BE
1/3 CLEAR

MULCH ON TOP OF ROOT BALL - REMOVE BURLAP FROM TOP 18"


HEIGHT

PLANTED BASED ON TRIANGULAR


TRUNK

FINISH GRADE 1/3 OF ROOTBALL. SPACING. SEE PLANT SCHEDULE FOR


COMPLETELY REMOVE ANY SPECIFIC PLANT ON CENTER (O.C.)
4" HIGH SOIL BERM AROUND ROOTBALL CING
SYNTHETIC WRAPPING SPA SPACING
O.C.
F

F
SET ROOTBALL 2" ABOVE FINISH GRADE MATERIALS.
FINISH THE PERIMETER OF SHRUB /
GRADE (4) 2"x4"x36" PT WOOD STAKES, INSTALL 2"
BELOW FINISH GRADE. - ALL WOOD BRACING MEMBERS GROUNDCOVER BEDS SHALL BE PLANTED
BEYOND SHALL BE STAINED PRIOR TO IN A ROW AS SHOWN. INTERIOR PORTIONS
PREPARED PLANTING SOIL - SEE
LANDSCAPE NOTES/SPECIFICATIONS INSTALLATION. STAIN COLOR OF BEDS SHALL BE PLANTED AT THE
2X ROOTBALL DIA. TO BE SELECTED BY OWNER OR SPECIFIED O.C. TRIANGULAR SPACING.
COMPACT SOIL UNDER ROOTBALL TO
PREVENT SETTLEMENT OWNERS REPRESENTATIVE.

PALM PLANTING ON SLOPE SHRUB & GROUNDCOVER SPACING PLAN


E

E
3 SCALE - 1/4" = 1'-0" 4 SCALE - 3/8" = 1'-0"

NOTES: NOTES:
1. CONTRACTOR TO DELINEATE 1. CONTRACTOR TO DELINEATE
OUTLINE OF PLANTING BEDS OUTLINE OF PLANTING BEDS
FOR REVIEW AND APPROVAL FOR REVIEW AND APPROVAL
BY OWNER'S REPRESENTATIVE. BY OWNER'S
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

REPRESENTATIVE.
2. CONTRACTOR TO ASSURE
IDD PACKAGE
D

D
PERCOLATION IN ALL PLANTING SOIL BERM TO SET ROOTBALL 1" 2. CONTRACTOR TO ASSURE
BEDS PRIOR TO INSTALLATION HOLD WATER ABOVE FINISH GRADE PERCOLATION IN ALL
(SEE LANDSCAPE NOTES / FINISH GRADE MULCH-3" DEPTH FOR PLANTING BEDS PRIOR TO
SPECIFICATIONS. BEYOND SHRUBS. NO MORE INSTALLATION (SEE
THAN 1" OF MULCH ON LANDSCAPE NOTES /
3. LAY OUT SHRUBS AT BED EDGE TOP OF ROOT BALL SPECIFICATIONS.
FIRST TO ESTABLISH
SET ROOTBALL 1" ABOVE
CONTINUOUS LINE. BEST FACE FINISH GRADE 3. LAY OUT SHRUBS AT BED EDGE
7007 SeaWorld Dr, Orlando, FL 32821
FINISH GRADE
MULCH-3" DEPTH FOR SHRUBS. OF SHURB TO FACE FRONT OF PREPARED PLANTING FIRST TO ESTABLISH ♦
C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

NO MORE THAN 1" OF MULCH PLANTING BED. SOIL - SEE LANDSCAPE CONTINUOUS LINE. BEST FACE SEAWORLD
ON TOP OF ROOT BALL NOTES / SOIL OF SHURB TO FACE FRONT OF
SPECIFICATIONS PLANTING BED.
FINISH GRADE
EXCAVATE / AMEND
LANDSCAPE DETAILS
4" TYP. ENTIRE PLANTING BED
4" T

PREPARED PLANTING SOIL - SEE TO A MINIMUM DEPTH


24"

24"

LANDSCAPE NOTES / SOIL SPECIFICATIONS


SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

YP.

OF 24" IN IT'S
EXCAVATE / AMEND ENTIRE PLANTING ENTIRETY - SEE
LANDSCAPE NOTES /
B

B
BED TO A MINIMUM DEPTH OF 24" IN
18" 12" 12" IT'S ENTIRETY - SEE LANDSCAPE NOTES / SPECIFICATIONS.
SPECIFICATIONS. JMS 20230011
Designed By Project No.
SHRUB & GROUNDCOVER PLANTING SHRUB & GROUNDCOVER PLANTING ON SLOPE
5 SCALE - 1/2" = 1'-0" 6 SCALE - 3/4" = 1'-0"
DB
Approved By
11/22/23
11/20/23
Date

JMS
9/19/2023 3:46:56 PM

Checked By

NW
Drawn By
L2.21
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

TREES
Species
CODE SCIENTIFIC NAME COMMON NAME
AH Araucaria heterophylla Norfolk Island Pine
CU Coccoloba uvifera Seagrape
L

L
FS Feijoa sellowiana Feijoa
JCS Juniperus chinensis 'spartan' Chinese Juniper
JV Juniperus virginiana Red Cedar
LJ Ligustrum japonica Japanese Privit
MG Magnolia grandiflora Southern Magnolia
PL Polyalthia longifolia pendula Mast Tree
QG Quercus geminata Sand Live Oak
QV Quercus virginiana Southern Live Oak
TC Tabebuia chrysotricha Golden Trumpet
K

K
TG Tibouchina granulosa Purple Glory
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
PALMS development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
Species complete and coordinated pricing [and execution] of the Work, and shall
CODE SCIENTIFIC NAME COMMON NAME include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
AWX Acoelorrhaphe wrighttii Everglades Palm Project. For Work of delegated designs; systems, assemblies,
BNX Bismarckia nobilis Bismark Palm components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
CRX Cycas revoluta Japanese Sago Palm shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
LCX Livistonia chinensis Chinese Fan Palm omissions, inconsistencies or errors in the Contract Documents.

CHX Chamaerops humilis Mediterranean Fan Palm


PDX Phoenix dactylifera Date Palm
PRX Phoenix roebelenii Pygmy Date Palm
PSX Phoenix sylvestris Silver Date Palm ISSUANCES
REX Rhapis excelsa Broadleaf Lady Palm No. Drawing Issue Description Date
SX Sabal palmetto Sabal Palm 01 IDD
IDD Submission
Package 11/20/23
11/22/23
TFX Trachycarpus fortunei Windmill Palm
Washingtonia robusta
H

H
WRX Mexican Fan Palm

SHRUBS / GROUNDCOVER
Species
CODE SCIENTIFIC NAME COMMON NAME
AZ Alpinia zerumbet ‘Variegata’ Shell Ginger
AD Asparagus densiflorus ‘Myers’ Foxtail Fern
AS Asplenium scolopendrium Hart's Tongue Fern
G

G
BR Bromeliaceae Bromeliad
BF Bulbine frutescens ‘Orange’ Stalked Bulbine
CC Callistemon citrinus ‘Little John’ Weeping Bottlebrush
ET Euphorbia tirucalli ‘Sticks on Fire’ Milkbush
EG Evolvulus glomeratus Blue Daze
GG Galphimia glauca Gold Shower
HF Hemerocallis fulva Orange Day Lily
HS Hymenocallis speciosa Spider Lily
LM Liriope muscari ‘Super Blue’ Big Blue Liriope
F

F
LC Loropetalum chinense ‘Plum’ Chinese Fringe Flower
PHS Philodendron selloum Split-Leaf Philodendron
PA Plumbago auriculata Cape Leadwort
RE Russelia equisetiformis Coral Fountain
SRE Serenoa repens Saw Palmetto
SD Strobilanthes dyeriana Persian Shield
TV Tulbaghia violacea Sociey Garlic
YA Yucca aloifolia Spanish Bayonet
ZF Zamia furfuracea Cardboard Plant
E

E
ZP Zamia pumila Coontie

ORNAMENTAL GRASSES
CODE SCIENTIFIC NAME COMMON NAME
CS Cortaderia selloana Pampas Grass
GP Gaillardia pulchella Indian Blanket
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

JCB Juniperus conferta ‘Blue Pacific’ Blue Pacific Shore Juniper


MC Muhlenbergia capillaris Pink Muhly Grass
IDD PACKAGE
D

D
PQ Paspalum quadrifarium Tussock Paspalum
PES Pennisetum setaceum Fountain Grass
SRA Sedum rupestre ‘Angelina’ Rocky Stonecrop
SB Spartina bakeri Sand Cordgrass
TD Tripsacum dactyloides Eastern Gamagrass

ACCENT 7007 SeaWorld Dr, Orlando, FL 32821


CODE SCIENTIFIC NAME COMMON NAME ♦
C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

AA Agave americana American Century Plant


SEAWORLD
AM Aloe maculata Soap Aloe
AP Aloe plicatilis Fan Aloe
BO Bougainvillea spp Bougainvillea TYPICAL PLANTING
Canna Lily
CA
CV
Cana ‘Australia’
Codiaeum variegatum Garden Croton
SCHEDULE
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

CT Cordyline terminalis Hawaiian Ti Plant


SR Strelitzia reginae Bird of Paradise
B

B
SN Strelitzia nicolai Bird of Paradise

JMS 20230011
VINES Designed By Project No.
CODE SCIENTIFIC NAME COMMON NAME
DB 11/22/23
11/20/23
MS Mandevilla spp Rock Trumpet Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NOTE NW
1. PLANTING MATERIAL AND QUANTITIES TO BE FINALIZED Drawn By
L2.30
A

A
AT THE SUBMITTAL OF BUILDING PERMIT DOCUMENTS.
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND
SIGN LEGEND
MONUMENT SIGN
L

L
DIRECTIONAL SIGN
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

LIMIT OF
ORK W
ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
NOTES Package 11/20/23
11/22/23
H

H
LIMIT OF WORK LIMIT OF WORK

SIGNAGE REQUIREMENTS
MONUMENT SIGNS
(SEC. 31.5 - 67)
MAXUMUM HEIGHT: 15 FT
MAXIMUM COPY AREA: 120 SF
G

G
-18"
SETBACK: 10 FT
-18"

-18"

DIRECTIONAL SIGNS
(SEC. 31.5 - 76)

RK
WO
OF
IT
LIM
LIMIT OF WORK
MAXUMUM HEIGHT: 15 FT
MAXIMUM COPY AREA: 120 SF
SETBACK: 10 FT

INTERNATIONAL DRIVE
LIMIT OF WORK
F

F
19'-
1"
LIMIT OF WORK
LIMIT OF WORK

######################

######

A
B

LIMIT OF WORK
E

E
PARKING

WORK
LIMIT OF
STRUCTURE

K
WOR
OF
PROJECT STARBOARD

LIMIT
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

FD

FD

IDD PACKAGE
D

D
DISCONNECT

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

MOTOR

MOTOR
MOTOR

MOTOR

MOTOR
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

MOTOR

MOTOR

MOTOR

MOTOR
MOTOR

MOTOR

MOTOR

FD

LIMIT OF WORK

FUTURE
FUTURE DEVELOPMENT
DEVELOPMENT KEY PLAN
K
7007 SeaWorld Dr, Orlando, FL 32821
LIM
IT
OF
W
OR


C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

WO
RK
SEAWORLD
OF
IT
LIM

LIMIT OF
WORK
LIMIT OF WORK

MASTER SIGN PLAN


LIMIT OF WORK

LIMIT OF WORK LIMIT OF WORK

-18"

-18"

-18"

RK
WO
OF
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

IT
LIM
LIMIT OF WORK

LIMIT OF WORK
LIMIT OF WORK
19'-1"

LIMIT OF WORK

LIMIT OF WORK
######################

######
B

B
C

A
B

LIMIT OF WORK

WORK
WAY

LIMIT OF
A PARK

K
OF WOR
ID

LIMIT
LIMIT OF WORK
R
FD

LIMIT OF WORK
L O JMS 20230011
FD

L F
CENTRA

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

LIMIT OF WORK

Designed By Project No.


RK
WO

DB 11/22/23
OF

11/20/23
IT
LIM

RK
WO
OF
IT
LIM

LIMIT OF WORK LIMIT OF WORK

Approved By Date

LIMIT OF WORK
JMS
9/19/2023 3:46:56 PM

LIMIT OF WORK LIMIT OF WORK

Checked By

NORTH NW
SCALE: 1" = 100'-0" Drawn By
L3.00
A

A
0 100 200

Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

NOTES
DIRECTIONAL SIGN DESIGN TO BE
FINALIZED AT BUILDING PERMIT
CONSISTENT WITH ORANGE
COUNTY CODE SEC. 31.5 - 67.
L

L
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
120 SF MAXIMUM Issuance up to Issued for Construction] are intended to be at that level of
COPY AREA development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
15'-0"

complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission
Package 11/20/23
11/22/23
H

H
MONUMENT SIGN
1 SCALE - 1/2" = 1'-0"
G

G
NOTES
F

F
DIRECTIONAL SIGN DESIGN TO BE
FINALIZED AT BUILDING PERMIT
6 SF MAXIMUM CONSISTENT WITH ORANGE
COPY AREA COUNTY CODE SEC. 31.5 - 76.
6'-0" MAX.
E

E
PROJECT STARBOARD
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

DIRECTIONAL SIGN
2 IDD PACKAGE
D

D
SCALE - 1/2" = 1'-0"

7007 SeaWorld Dr, Orlando, FL 32821



C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

MASTER SIGN PLAN


DETAILS
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

B
JMS 20230011
Designed By Project No.

DB 11/22/23
11/20/23
Approved By Date

JMS
9/19/2023 3:46:56 PM

Checked By

NW
Drawn By
L3.20
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

LEGEND
L

L
PROPOSED DEVELOPMENT IS DESIGNATED
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other

SPECIAL ZONE - THEME PARK AND IS EXEMPT Issuance up to Issued for Construction] are intended to be at that level of
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the

FROM OPEN SPACE REQUIREMENTS


Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

LIMIT OF
WORK
ISSUANCES
No. Drawing Issue Description Date
01 IDD
IDD Submission 11/20/23
NOTES Package 11/22/23
H

H
LIMIT OF WORK LIMIT OF WORK
G

G
-18"

-18"

-18"

RK
WO
OF
IT
LIM
LIMIT OF WORK

INTERNATIONAL DRIVE
LIMIT OF WORK
F

F
-12"

-24"

-12"

19'-1
-36"

"
-24"

-36"

-12" -42"
-24"

-36"

LIMIT OF WORK
LIMIT OF WORK

######################

######

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"

-24"
-10"
-24"
-24"

-42"
-24" -24"

C
-24"

A
B
-42" -24"

LIMIT OF WORK
E

E
-42"

-42" -42"

-42"

-42"

WORK
-42"

LIMIT OF
-42"

-42"

-42"

-42"
-36"

-36"

ORK
OF W
PROJECT STARBOARD
-42"

-42" -42"

LIMIT
Autodesk Docs://20230011 SeaWorld Resort Hotel/20230011_2023_SeaWorld Resort Hotel.rvt

-42"

-42"
FD

FD

IDD PACKAGE
D

D
DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

MOTOR

MOTOR
MOTOR

MOTOR

MOTOR

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

MOTOR

MOTOR

MOTOR

MOTOR
MOTOR

MOTOR

MOTOR

FD

LIMIT OF WORK

KEY PLAN
K
7007 SeaWorld Dr, Orlando, FL 32821
LIM
IT
OF
W
OR


C

C
PROJECT NUMBER: 20230011 PROJECT NAME: PROJECT STARBOARD

WO
RK
SEAWORLD
OF
IT
LIM

LIMIT OF
WORK
LIMIT OF WORK LIMIT OF WORK

LIMIT OF WORK LIMIT OF WORK


OPEN SPACE PLAN
-18"

-18"

-18"

RK
WO
OF
SHEET NUMBER: X1.00 - IDD SET SAMPLE SHEET

IT
LIMIT OF WORK

LIM
LIMIT OF WORK
LIMIT OF WORK
-12"

-24"

-12"

-36"

-24"

-36"
19'-1"
-12" -42"
-24"

-36"

LIMIT OF WORK

LIMIT OF WORK
######################

######

-0"

-0"

-0"

-0"
-0"

-0"
12"

-10"
12"
-0"

-10"

-24"
B

-24"

B
-10"
-24"
-24"

-42" -24" -24"

C
-24"

A
B
-42" -24"

LIMIT OF WORK

-42"

-42" -42"

-42"

-42"

WORK
ARKWAY
-42"

LIMIT OF
-42"

-42"

-42"

P
-42"
-36"

-36"

K
A

OF WOR
I D
-42"

-42" -42"

LIMIT OF WORK

LIMIT
R
-42"
-42"
FD

O JMS 20230011
LIMIT OF WORK
L
FD

NTRAL F

MOTOR

DISCONNECT

MOTOR

DISCONNECT

MOTOR
DISCONNECT

MOTOR
DISCONNECT

MOTOR

DISCONNECT
DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT
MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR

MOTOR
FD

CE
LIMIT OF WORK

Designed By Project No.

11/20/23
RK
WO

DB 11/22/23
OF
IT
LIM

RK
WO
OF
IT
LIM

LIMIT OF WORK LIMIT OF WORK

Approved By Date

LIMIT OF WORK
JMS
9/19/2023 3:46:56 PM

LIMIT OF WORK LIMIT OF WORK

Checked By

NORTH NW
SCALE: 1" = 100'-0" Drawn By
L4.00
A

A
0 100 200

Feet
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DOWNLIGHT CHARACTER SPECIALTY LUMINAIRE KEY ABBREVIATION GENERAL NOTES


NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL ABV ABOVE 1. ALL INFORMATION PROVIDED ON THIS SHEET MAY NOT BE
BUILDINGS • EARTH & ENVIRONMENT • ENERGY
AFF ABOVE FINISH FLOOR IMPLEMENTED INTO THE PROJECT.
INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
RECESSED SURFACE SURFACE AFG ABOVE FINISH GRADE
ADJ ADJUSTABLE 2. "LD" DRAWINGS ARE FOR INFORMATION ONLY, REFER TO THE
ARCH ARCHITECTURAL ELECTRICAL DRAWING FOR CIRCUIT INFORMATION.
L

L
BLDG BUILDING
RECESSED (SQUARE) PENDANT WALL LUMINAIRE SYMBOL 3. REFER TO FIXTURE SPECIFICATIONS FOR COMPLETE FIXTURE
BOT BOTTOM
BEL BELOW INFORMATION.
CBX CONTROL BOX
SURFACE WALL TRACK
CP2 [1001] LUMINAIRE TYPE
(SEE LUMINAIRE TAG)
CLG
CONSTR
CEILING
CONSTRUCTION
4. REFER TO FIXTURE MOUNTING DETAIL SHEETS FOR SPECIFIC
MOUNTING CONDITIONS.

SURFACE (SQUARE) BASE PLUG-IN <Z42>(DMX) ZONE NUMBER


(SEE CONTROL TAG)
CONTR
CONT
E
CONTRACTOR
CONTINUOUS
EAST
5. CONTRACTOR TO PROVIDE TRANSFORMERS AND BALLASTS
FOR ALL FIXTURES SPECIFIED AS REMOTE TRANSFORMERS OR
EL ELEVATION BALLAST. ALL TRANSFORMERS AND BALLAST SPECIFIED AS
ELEC ELECTRICAL REMOTE SHALL BE MOUNTED OUT OF VIEW OF GUESTS.
ADJUSTABLE BASE WITH HEAD MOVING
EQ EQUAL
EXT EXTERIOR 6. CONTRACTOR TO CONFIRM ALL REMOTE TRANSFORMER AND
SCOPE DOCUMENTS
BALLAST LOCATIONS WITH LANDSCAPE OR FACILITY
K

K
FL FLOOR
FT FOOT OR FEET ARCHITECT.
The Contract Documents Issued for [Conceptual Design, Schematic
GC GENERAL CONTRACTOR Design, Design Development, Partial Construction Documents or Other
GND GROUND 7. CONTRACTOR TO VERIFY EXACT MOUNTING LOCATION OF ALL
Issuance up to Issued for Construction] are intended to be at that level of
GR GRADE ACCENT LIGHTS IN FIELD WITH LIGHTING DESIGNER.
PATH POLE FAN LUMINAIRE TAG H
ID
HEIGHT
INSIDE DIAMETER 8. UNLESS OTHERWISE INDICATED, ALL MOUNTING BOXES FOR
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
LIGHTING FIXTURES MOUNTED TO FACADES TO BE RECESSED complete and coordinated pricing [and execution] of the Work, and shall
IN INCH include items necessary for the proper execution and completion of the
NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL INTO STRUCTURE. COORDINATE JBOX LOCATION WITH OTHER
CP2 [1001] INFO
INT
L
INFORMATION
INTERIOR
LENGTH
TRADES. Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
BOLLARD NO LIGHT SOURCE SURFACE 9. INFORM CONSTRUCTION MANAGER IN WRITING IN A TIMELY components and materials shall comply with national, state and local code
MFG MANUFACTURER requirements. The [Construction Manager, Contractor, Design/Builder]
N NORTH WAY OF ANY DISCREPANCIES DISCOVERED.
LUMINAIRE ID NUMBER shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
NO NUMBER omissions, inconsistencies or errors in the Contract Documents.
RECESSED SINGLE HEAD PENDANT NUMERICAL DESIGNATION 10. CONTRACTOR TO VERIFY CONDITIONS ON WHICH THIS WORK
NTS NOT TO SCALE
OC ON CENTER DEPENDS IN OTHER ISSUED CONSTRUCTION DRAWINGS AND
CHARACTER TYPE ON SITE SUCH AS BUT NOT LIMITED TO:
OD OUTSIDE DIAMETER
SURFACE MULTIPLE HEAD WALL OFOI OWNER FURNISHED OWNER INSTALLED • DIMENSIONS
LUMINAIRE TYPE • LEVELS
OPP OPPOSITE
PSU POWER SUPPLY UNIT • MATERIALS
• DETAILS ISSUANCES
ISSUANCES
REV REVISION
RCP REFLECTED CEILING PLAN No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
S
SCHED
SOUTH
SCHEDULE
01 IDD
1 IDD Submission
IDD
IssueSubmittal
for IDD
Package 11/20/23
11/20/2023
11/20/2023
11/22/23
IN-GRADE UNDERWATER GENERAL CONTROL TAG SPEC
STR
SPECIFICATION
STRUCTURE
H

H
TBD TO BE DETERMINED
NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL TYP TYPICAL
<Z42>(DMX) UON
W
UNLESS OTHERWISE NOTED
WEST OR WIDTH
GENERAL RECESSED PENDANT W/ WITH
DMX CONTROLLED W/O WITHOUT
WP WATERPROOF
ZONE CONTROL NUMBER
DIRECTIONAL SURFACE WALL XFMR TRANSFORMER
ZONE INDICATOR
G

G
ACCENT TROFFER STRIP SWITCH TAG CHARACTER TYPE REFERENCES
NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL KEY NOTE

SURFACE LENSED SURFACE


Xa B
C
BOLLARD / SHORT BASE
CLOSE CEILING X
REFER TO "KEY NOTES"
ON DRAWING
F FAN
G GAS FLAME FOR LUMINAIRE
LUMINAIRE CONTROLLED
WALL PARABOLIC RECESSED L LAMPPOST SECTION
SWITCH TYPE M MULTILAMP / FESTOON
P PENDANT
F

F
LIGHTING CONTROL SYMBOL R RECEPTACLE FOR LUMINAIRE X SECTION NUMBER
TRACK BASKET PENDANT
S SURFACE
X SWITCH TYPE T
W
TABLE LAMP
WALL MOUNTED
Y SHEET NUMBER

PLUG-IN 2X2 WALL a LUMINARE CONTROLLED ELEVATION

X ELEVATION NUMBER
Y SHEET NUMBER

DETAIL
LINEAR POWER THEATRICAL LIGHTING CONTROL LUMINAIRE TYPE
E

E
X DETAIL NUMBER
NORMAL EMERGENCY CRITICAL NORMAL EMERGENCY CRITICAL A ACCENT / AIMABLE Y SHEET NUMBER
STANDARD SWITCH B BOLLARD / PATH / STEP
C CHARACTER REVISION
ADJUSTABLE PS PS PS POWER SUPPLY LEKO MOVING MIRROR
D DOWNLIGHT
E SPECIALTY / THEATRICAL
L LIGHTING CONTROL STATION
F FLOODLIGHT / SPOTLIGHT ? REVISION NUMBER
SET PD PD PD POWER / DATA FOLLOW SPOT MOVING SPOT G INGRADE
H HIGH BAY / HAZARDOUS REVISION AREA
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

C CONTACTOR I INDIRECT
MULTILAMP E POWER SOURCE PAR MOVING WASH J
K
JUNCTION BOX
C(K)LEAN / GASKETED
PROJECT STARBOARD
IDD PACKAGE
TC TIME CLOCK L LINEAR
D

D
SLOT J JUNCTION BOX FRESNEL M MULTILAMP / STRING LIGHTS

PC PHOTOCELL
N
O
NICHE OR COVE
[NOT USED]
SWITCH TYPE
P POLE/PARKING
Q POWER SUPPLIES 3 THREE WAY
R TROFFER 4 FOUR WAY
DS DAYLIGHT SENSOR
S SURFACE / STRIPLIGHT D DIMMER

LIGHT SOURCE FIBER OPTIC DATA OUTLET M OCCUPANCY SENSOR (CEILING)


T
U
V
TRACK
UNDERWATER
VANDAL
3D
OS
VS
THREE WAY DIMMER
OCCUPANCY SENSOR
VACANCY SENSOR
W WORKLIGHT / WALLPACK K KEY OPERATED 7007 SeaWorld Dr, Orlando, FL 32821
FIBER OPTIC FIELD SOURCE SURFACE X EXIT / EMERGENCY T WALL BOX TIMER
M OCCUPANCY SENSOR (WALL) Y GRAPHIC W WIRELESS ♦
C

C
WALL
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

Z [ USED IN ZONING]
LUMINOUS SURFACE END POINT FLOOR
WP
LV
WEATHERPROOF
LOW VOLTAGE (0-10V)
SEAWORLD

LEGEND AND NOTES


SHEET NUMBER: LD9.01 - LEGEND AND NOTES

B
A. Ebben USS-23002562-00
Principal-in-Charge Project No.

J. Baker 11/20/23
11/10/23
Project Manager Date
11/10/2023 6:54:04 PM

L. Dixon
Designer

L. Fordyce
Drafter
LD9.01
A

A
Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

BUILDINGS • EARTH & ENVIRONMENT • ENERGY


INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
L

L
SCOPE DOCUMENTS
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.

LD9.53 No.
No.
01 IDD
1
Drawing
IDD Submission
IDD
IssueSubmittal
for IDD
Package
ISSUANCES
ISSUANCES
Drawing Issue
Issue Description
Description Date
Date
11/20/23
11/20/2023
11/20/2023
11/22/23

LD9.52
H

H
G

G
F

F
LD9.56
LD9.55
E

E
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

PROJECT STARBOARD
IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821

LD9.59

C

C
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

OVERALL

LD9.57 LD9.58 PHOTOMETRIC SITE


SHEET NUMBER: LD9.50 - OVERALL PHOTOMETRIC SITE

B
A. Ebben USS-23002562-00
Principal-in-Charge Project No.

J. Baker 11/20/23
11/10/23
Project Manager Date
11/10/2023 6:54:50 PM

L. Dixon
Designer

L. Fordyce
Drafter
LD9.50
A

A
1" = 80'-0"

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Luminaire Schedule CALCULATION SUMMARY - SITE


Description Tag LLF Luminaire Luminaire Label
Lumens Watts AREA AVG MAX MIN AVG / MIN
4IN CANOPY DOWNLIGHT D1 0.900 2299 33.1 A4-RM_NCXXX-35S-XXX_A4-2790-X
40IN BOLLARD WITH TYPE 3 OPTIC B1 0.900 464 11 ABB-B1-LED-D1-A ROADS 1.1 3.0 0.20 5.5
FULL CUT-OFF POST TOP - 13FT POLE P1B 0.900 2151 24 ARB-B1-LED-D1-T3-7030 BUILDINGS • EARTH & ENVIRONMENT • ENERGY
FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030 PATHS 4.32 29.60 0.20 21.6 INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
FULL CUT-OFF POST TOP - 20FT POLE P1A 0.900 4197 48 ARB-B2-LED-D1-T3-7030 - B2
FULL CUT- OFF DECORATIVE BOLLARD B2 0.900 39 8.96 Cornet B-27 3400240027 POOLS 9.58 49.9 3 3.19 20.8
FLOODLIGHT LG W/ SNOOT - FLOOD OPTIC W/ LINEAR SPREAD F2A 0.900 4104 50 LBL-120-27K-FL-XX-XX-LSL
L

L
FLOODLIGHT LG W/ SNOOT - MEDIUM OPTIC F2B 0.900 3901 50 LBL-120-27K-M-XX-XX-SN ZERO ENTRY 14.24 49.9 6.3 2.6
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - HIGH OUTPUT F1J 0.900 12881 200 LBX HO-120-27K-FL-XX-XX-SN
FLOODLIGHT XL W/ SNOOT W/ LINEAR SPREAD - HIGH OUTPUT F1G 0.900 16818 200 LBX HO-120-27K-M-XX-XX-LSL SCOPE BOUNDARY 0.36 1.60 0.00 N/A
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - HIGH OUTPUT F1H 0.900 15155 200 LBX HO-120-27K-M-XX-XX-SN
FLOODLIGHT XL W/ SNOOT - NARROW FLOOD OPTIC - HIGH OUTPUT F1F 0.900 17823 200 LBX HO-120-27K-NF-XX-XX-SN PORTE COCHERE 13.80 21.4 0.3 46.00
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - REGULAR OUTPUT F1B 0.900 10074 140 LBX RO-120-27K-FL-XX-XX-SN
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - REGULAR OUTPUT F1A 0.900 12977 140 LBX RO-120-27K-M-XX-XX-LSL
FLOODLIGHT XL W/ SNOOT - WIDE FLOOD OPTIC - REGULAR OUTPUT F1C 0.900 13585 140 LBX RO-120-27K-WFL-XX-XX
UNDERBENCH LINEAR ACCENT LIGHT N1A 0.900 163 1.68 SW24-1_5-DRY-27

SCOPE DOCUMENTS
K

K
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
Issuance up to Issued for Construction] are intended to be at that level of
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 Work, as shown, specified, reasonably inferred or required for a complete
0.0
0.0
0.0 Project. For Work of delegated designs; systems, assemblies,
0.0
0.0 components and materials shall comply with national, state and local code
0.0 requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
0.0
omissions, inconsistencies or errors in the Contract Documents.
0.0

1 / LD9.53
0.0

0.0

0.0

0.1
ISSUANCES
ISSUANCES
0.1
No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
0.1 01 IDD
1 IDD Submission
IDD
IssueSubmittal
for IDD
Package 11/20/23
11/20/2023
11/20/2023
11/22/23
0.1
H

H
0.2

0.3

0.3

0.3

0.3
0.7 1.6 1.2 0.7 0.5 0.7 P1a 1.7
P1a
MH = 20'-0" MH = 20'-0"
0.0
G

G
0.4 0.4 0.4 0.8 1.6 1.2 0.8 0.5 0.7 1.7
0.0

0.7 0.7 0.6 0.8 1.1 0.7 0.6 1.0 1.4 0.9 0.6 0.5 0.9 1.4
0.0
P1a
MH = 20'-0"
0.3
P1a P1a P1a P1a P1a
1.0 1.1 0.9 1.0 1.7 1.2 0.7 0.4 0.3 0.7 MH = 20'-0"
1.7 1.2 0.7 0.4 0.6 MH 1.7
= 20'-0" 1.6 0.9 0.5 0.5 MH
1.0 = 20'-0"
1.8 1.1 0.6 0.5 MH
1.1 = 20'-0"1.9 1.1 0.7 0.6 0.8 MH = 20'-0"
1.8 1.3 0.9 0.7 0.9 0.9 0.7 0.6 0.6 0.8 0.9

0.1
0.8 1.6 1.2 1.4 1.4 0.9 0.5 0.3 0.3 0.8 1.5 1.0 0.6 0.4 0.6 1.5 1.1 0.7 0.4 0.5 1.1 1.4 0.9 0.6 0.5 1.3 1.5 1.0 0.8 0.7 1.0 1.7 1.1 0.7 0.6 0.6 0.7 0.6 0.7 0.7 0.7 0.6

0.1
F

F
1.0 0.8 0.5 0.4 0.6 1.0 0.9 0.6 0.5 0.7 1.1 1.0 0.9 1.0 1.3 1.4 1.2 0.8 0.5 0.4 0.4 0.5 0.7 1.0 1.0 0.6 0.5

0.0

0.7 0.7 0.7 1.4 2.0 1.5 1.0 0.6 0.4 0.3 0.3 0.3 0.7 1.8 1.5 0.8 0.5
0.0

LED LED LED LED LED LED LED


LED LED LED
LED
LED

LED LED
LED
LED LE
D LED LE D 0.2 0.3 0.4 0.4 0.3 0.3 0.3 0.4 0.4 0.5 1.0 3.0 1.8 1.0 0.5 0.3 0.2 0.2 0.2 0.4 1.6 2.6 1.2 0.7
LED

LED LE D
LED
0.0 LED
LED 0.5 0.4 0.4 0.3
LED
LED LE D
L2
LED

LED
LED
LED D
LED LE
LED
LED

LED
L2 LED
LED
LE D
LED LE
D LED
LED
L2 LE
D
LED

LED LED
LED
LE D LED
LED LE
D
LED
LE D 0.8
LED

LED
LE D LED
LED
LED
0.0 LED
LE
D 0.8 0.2
LED

LE D
LED

LED

D
LED

LE
LED
LED

LED D LED
LED LE
LED
E

E
D LED
LED LE

0.0
LED

0.2 0.2
LED
LED
LED
L ED
LE D
D
LE
0.0 LE
D

D
LE
D
LE
D
LE

0.0
D
LE
D
LE
D
LE
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

D
LE

0.0

PROJECT STARBOARD
LED

L2
LE D

IDD PACKAGE
LED
D

D
0.0
LED
LED
LED

0.0
LED
LED
LE D

0.0
LED
LE
D

0.0
7007 SeaWorld Dr, Orlando, FL 32821

C

C
0.0
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

SEAWORLD
0.0

SITE PHOTOMETRICS
0.0

AREA 02
SHEET NUMBER: LD9.52 - SITE PHOTOMETRICS AREA 02

0.0

1 / LD9.56
B

B
0.0
1.5 2.0 1.3

1.6 P1b
2.2 1.4 D1
0.0
MH = 13'-0" D1 A. Ebben USS-23002562-00
1.7 1.9 1.3 0.9
Principal-in-Charge Project No.

1.6 1.4 1.0 0.7


J. Baker 11/20/23
11/10/23
0.0
1.2 1.0 0.8 Project Manager Date
B1 D1
11/10/2023 6:54:57 PM

0.8 0.8 0.7 0.5 0.4


0.9 4.3 0.9 0.3
L. Dixon
0.1 Designer
0.7 0.7 0.7 0.6 0.5 0.7 0.5
0.7 2.5

0.5 0.7 0.8 0.8 0.8 1.7 1.2 0.8 0.5 0.4 D1
L. Fordyce
2.1
B1 7.4
Drafter
LD9.52
A

A
0.1
0.6 0.8 1.0 1.1 1.1 P1b 1.9
1.9 1.2 0.7 0.5 0.5
B1 6.0
MH = 13'-0"
0.9 1.2 1.4 1.6 1.5 1.9 2.2 1.8 1.1 0.7 0.4 0.4 1.7
3.8 1" = 20'-0"
0.2
0.8 1.2 1.5 2.2 2.1 1.6 1.7 1.6 1.3 0.9 0.5 0.3 0.3 D1
P1b
2.4 1 / LD9.55
0.7 0.9 1.3 2.0 2.3 1.4MH = 13'-0" 1.1 1.1 1.0 0.9 0.6 0.4 0.4 Drawing No.
B2 1.7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 / LD9.51
CALCULATION SUMMARY - SITE
Luminaire Schedule
Description Tag LLF Luminaire Luminaire Label AREA AVG MAX MIN AVG / MIN
Lumens Watts 0.0
4IN CANOPY DOWNLIGHT D1 0.900 2299 33.1 A4-RM_NCXXX-35S-XXX_A4-2790-X 0.0 ROADS 1.1 3.0 0.20 5.5
BUILDINGS • EARTH & ENVIRONMENT • ENERGY
40IN BOLLARD WITH TYPE 3 OPTIC B1 0.900 464 11 ABB-B1-LED-D1-A
FULL CUT-OFF POST TOP - 13FT POLE P1B 0.900 2151 24 ARB-B1-LED-D1-T3-7030 PATHS 4.32 29.60 0.20 21.6 INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
0.0
FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030 0.0
FULL CUT-OFF POST TOP - 20FT POLE P1A 0.900 4197 48 ARB-B2-LED-D1-T3-7030 - B2 POOLS 9.58 49.9 3 3.19 20.8
FULL CUT- OFF DECORATIVE BOLLARD B2 0.900 39 8.96 Cornet B-27 3400240027
L

L
FLOODLIGHT LG W/ SNOOT - FLOOD OPTIC W/ LINEAR SPREAD F2A 0.900 4104 50 LBL-120-27K-FL-XX-XX-LSL 0.0 ZERO ENTRY 14.24 49.9 6.3 2.6
0.0
FLOODLIGHT LG W/ SNOOT - MEDIUM OPTIC F2B 0.900 3901 50 LBL-120-27K-M-XX-XX-SN
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - HIGH OUTPUT F1J 0.900 12881 200 LBX HO-120-27K-FL-XX-XX-SN SCOPE BOUNDARY 0.36 1.60 0.00 N/A
FLOODLIGHT XL W/ SNOOT W/ LINEAR SPREAD - HIGH OUTPUT F1G 0.900 16818 200 LBX HO-120-27K-M-XX-XX-LSL 0
0.0
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - HIGH OUTPUT F1H 0.900 15155 200 LBX HO-120-27K-M-XX-XX-SN PORTE COCHERE 13.80 21.4 0.3 46.00
FLOODLIGHT XL W/ SNOOT - NARROW FLOOD OPTIC - HIGH OUTPUT F1F 0.900 17823 200 LBX HO-120-27K-NF-XX-XX-SN
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - REGULAR OUTPUT F1B 0.900 10074 140 LBX RO-120-27K-FL-XX-XX-SN 0.0
0.0
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - REGULAR OUTPUT F1A 0.900 12977 140 LBX RO-120-27K-M-XX-XX-LSL
FLOODLIGHT XL W/ SNOOT - WIDE FLOOD OPTIC - REGULAR OUTPUT F1C 0.900 13585 140 LBX RO-120-27K-WFL-XX-XX
UNDERBENCH LINEAR ACCENT LIGHT N1A 0.900 163 1.68 SW24-1_5-DRY-27
0.0 0.0

SCOPE DOCUMENTS
K

K
0.0 0.0
The Contract Documents Issued for [Conceptual Design, Schematic
Design, Design Development, Partial Construction Documents or Other
0.0 0.0 Issuance up to Issued for Construction] are intended to be at that level of
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
0.1 0.0
complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
0.1
Project. For Work of delegated designs; systems, assemblies,
0.1
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
0.2 0.2 0.1
omissions, inconsistencies or errors in the Contract Documents.

0.3 0.4 0.1

0.5 0.7 0.1 ISSUANCES


ISSUANCES
No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
01 IDD
IDD Submission
IDD Submittal 11/20/23
11/20/2023
0.4
0.8 1.1 0.1 1 Issue for IDD
Package 11/20/2023
11/22/23
0.4
H

H
1.1 1.5 0.2

0.4
P1a
MH
0.7 = 20'-0"
1.8 1.7 0.2

0.5

1.4 1.5 0.3

0.7

0.9 1.1 1.0 0.4


0.7

1.0
G

G
1.1 1.0 0.5
0.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.4 0.9
0.0 1.1 1.3 0.9 0.6
0.5

1.7 1.3
0.4
0.0 1.4 1.5 0.8
P1a
1 / LD9.52

0.4
P1a MH = 20'-0"
MH = 20'-0" 0.9 1.7 1.2
0.0 0.9 1.9 0.8
0.4

1.3 1.5
0.1 0.5 0.6
F

F
1.1 1.6 1.6

0.4 1.3 1.1


0.1 1.0 1.3 1.3 0.5

0.4
1.7 1.3
0.1 0.4
0.8 1.5 1.4
0.4

0.4 P1a 1.2 2.1 1.4


0.1 0.8 MH = 1.6
20'-0" 1.9
0.4
0.6 P1a
1.4
MH = 20'-0"
1.9
0.9
0.2 0.3
E

E
1.3 1.8 2.3
1.2

1.9 1.3 1.7 1.4


0.9
0.3 0.3
0.7 P1a 1.7 1.5 0.9 0.5 0.6 P1a1.3 1.8 1.0 0.6 0.4 0.6 1.4 1.3 1.3 1.5

MH = 20'-0" MH = 20'-0" 0.4


1.2 1.6 2.0 1.6 1.8 1.5 1.4
0.5 0.3 0.2
0.7 1.7 1.4 0.8 0.5 0.6 1.4 1.7 1.0 0.6 0.4 0.6 1.8 1.9 1.3 1.1 1.0
P1a
0.4
MH = 20'-0"
0.7 0.8 1.2 2.3 2.3 1.5 1.5 P1a 2.1 1.5
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

0.6 1.1 0.2


0.9 1.4 1.0 0.6 0.5 0.7 1.4 1.2 0.9 0.6 0.4 0.5 0.5 0.4 0.6 1.7 1.6 1.1 0.8 MH = 20'-0"

P1a
0.4
0.9
PROJECT STARBOARD
IDD PACKAGE
0.3 1.1 2.5 3.0 2.2 2.0 2.2 1.9
MH = 20'-0" 0.6 0.2
D

D
0.8 0.9 0.7 0.5 0.5 0.7 1.0 1.0 0.8 0.6 0.5 0.6 1.1 0.5 1.6 1.0 0.6 0.5 0.8 1.4 1.1
1.0
0.6 1.1 1.5
P1a 2.4 2.0 1.7 1.4 1.1 0.9
0.7 0.6 0.5 0.4 0.4 0.5 0.7 0.9 1.0 0.8 0.6 0.7 1.4 1.3 0.8 0.6 1.2 0.7 0.4 0.4
MH
0.9
= 20'-0"1.8 1.1 0.7 0.6 0.8
0.3

P1a
2.0 2.9 2.3 1.9 1.5 1.2 0.9 0.8 1.2 1.1
MH = 20'-0" 0.3
0.6 0.5 0.4 0.3 0.3 0.4 0.5 0.8 1.3 1.1 0.9 0.9 1.1 0.9 0.6 0.5 0.6 1.1 2.0 1.3 0.8 0.5 0.5 1.1 1.5 0.9

1.1 1.7 2.5 1.9 1.7 1.6 1.2 0.8 0.7 1.1 1.6 1.0 0.6
0.4
0.8 0.5 0.4 0.3 0.3 0.3 0.4 0.6 1.4 1.7 1.1 0.9 0.8 0.6 0.4 0.4 0.7 1.5 1.9 1.3 0.8 0.5 0.6 1.0
7007 SeaWorld Dr, Orlando, FL 32821
P1a
1.0 1.1 1.8 1.9 1.4 1.3 1.8 1.5 1.0 0.7 1.0 1.8 1.2 0.7
0.0

C

C
1.2 0.7 0.4 0.3 0.3 0.4 0.5 0.7
MH1.3= 20'-0" 0.8 1.6 1.9 1.3 0.8
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

P1a

1.5 1.2 1.3 1.5 1.5 1.1 1.0 1.6


MH = 20'-0" SEAWORLD
0.4
0.8 0.6 0.4 0.4 0.5 0.7 0.6 1.1 2.0
P1a
1.1 1.9 1.5 1.4 1.5 1.4 1.1 1.0
MH = 20'-0"
0.3
SITE PHOTOMETRICS
0.9 0.6 0.4 0.5 1.0 0.8
P1a
MH = 20'-0"
1.1 2.0 1.4 1.3 1.6 1.6
AREA 03
SHEET NUMBER: LD9.53 - SITE PHOTOMETRICS AREA 03

0.2
1.7 0.9 0.5 0.5 0.9

0.9 1.5 1.6 1.2 1.0 1.3


0.1
B

B
2.8 1.4 0.6 0.4 0.8
P1a
MH = 20'-0" P1a
1.3 1.4 1.4 1.2 1.0 1.3
MH = 20'-0" 0.1 A. Ebben USS-23002562-00
2.8 1.4 0.6 0.4 0.7
Principal-in-Charge Project No.

1.7 1.5 1.4 1.4 1.3 1.2


0.1
J. Baker 11/20/23
11/10/23
1.7 0.9 0.5 0.5 0.9
Project Manager Date
11/10/2023 6:55:04 PM

1.9 1.9 1.4 1.4 1.7 L. Dixon


0.1
0.9 0.5 0.4 0.4 0.7 Designer

L. Fordyce
LD9.53
0.9 1.9 1.8 1.3 1.1 2.0
0.0 Drafter
A

A
1.3 1.8 1.4 1.1 1.1 P1a
MH = 20'-0" 0.0 1" = 20'-0"
1 / 1LD9.56
/ LD9.56
1.6 1.6 1.3 1.1 1.2 0.0 Drawing No.
0.1 0.1 0.1 0.1 0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION
1 2 3 4 2.1 5 6 7 8 9 10 11 12 13 14 15
0.1
B1 7.4
0.6 0.8 1.0 1.1 1.1 P1b 1.9
1.9 1.2 0.7 0.5 0.5 Luminaire Schedule
B1 6.0
MH = 13'-0" Description Tag LLF Luminaire Luminaire Label
0.9 1.2 1.4 1.6 1.5 1.9 2.2 1.8 1.1 0.7 0.4 0.4 1.7 1 / LD9.52
3.8 Lumens Watts
0.2 D1 4IN CANOPY DOWNLIGHT D1 0.900 2299 33.1 A4-RM_NCXXX-35S-XXX_A4-2790-X
0.8 1.2 1.5 2.2 2.1 1.6 1.7 1.6 1.3 0.9 0.5 0.3 0.3
2.4
P1b 40IN BOLLARD WITH TYPE 3 OPTIC B1 0.900 464 11 ABB-B1-LED-D1-A
0.7 0.9 1.3 2.0 2.3 1.4MH = 13'-0" 1.1 1.1 1.0 0.9 0.6 0.4 0.4
B2 1.7
FULL CUT-OFF POST TOP - 13FT POLE P1B 0.900 2151 24 ARB-B1-LED-D1-T3-7030
0.5
D1 FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030
1.0 1.0 1.1 1.4 1.9 2.0 0.8 0.8 0.8 0.7 0.5 0.4 0.5 0.7
B2 1.6 FULL CUT-OFF POST TOP - 20FT POLE P1A 0.900 4197 48 ARB-B2-LED-D1-T3-7030 - B2
D1 F1h (TYP 2) FULL CUT- OFF DECORATIVE BOLLARD B2 0.900 39 8.96 Cornet B-27 3400240027 BUILDINGS • EARTH & ENVIRONMENT • ENERGY
1.4 1.4 1.4 1.4 1.5 1.7 0.7 0.7 0.7 0.6 0.5 0.4
1.6 MH = 41'-0" FLOODLIGHT LG W/ SNOOT - FLOOD OPTIC W/ LINEAR SPREAD F2A 0.900 4104 50 LBL-120-27K-FL-XX-XX-LSL INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
0.5 D1 D1
1.7 2.1 2.1 1.7 1.6 1.5 0.8 0.8 0.6 0.5 0.4 0.4 L1 B1 F1h F1b (TYP 3) D1 FLOODLIGHT LG W/ SNOOT - MEDIUM OPTIC F2B 0.900 3901 50 LBL-120-27K-M-XX-XX-SN
B2 1.3
MH = 41'-0" D1
P1b 1.9 1.5 MH = 41'-0" D1 D1 FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - HIGH OUTPUT F1J 0.900 12881 200 LBX HO-120-27K-FL-XX-XX-SN
2.0 2.4 1.0 1.1 0.9 0.7 0.4 0.4 0.6 0.3 D1 D1
MH = 13'-0" 1.2 2.6 D1 FLOODLIGHT XL W/ SNOOT W/ LINEAR SPREAD - HIGH OUTPUT F1G 0.900 16818 200 LBX HO-120-27K-M-XX-XX-LSL
L

L
B2 B1 D1 D1 D1
0.2
2.1 1.8 1.2 1.5 1.1 0.7 0.4 D1 D1 FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - HIGH OUTPUT F1H 0.900 15155 200 LBX HO-120-27K-M-XX-XX-SN
0.6 1.0 1.9 7.6 D1 D1
L1 D1 F1h FLOODLIGHT XL W/ SNOOT - NARROW FLOOD OPTIC - HIGH OUTPUT F1F 0.900 17823 200 LBX HO-120-27K-NF-XX-XX-SN
1.6 1.3 1.0 0.6 1.5 1.8 1.2 0.8 0.5 3.9 MH 4.1
4.0 = 41'-0" D1
B2 0.5 0.9 1.5 2.3 4.0 7.7 4.0 3.6 3.2 D1 FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - REGULAR OUTPUT F1B 0.900 10074 140 LBX RO-120-27K-FL-XX-XX-SN
0.1 F1j 2.3 D1 FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - REGULAR OUTPUT F1A 0.900 12977 140 LBX RO-120-27K-M-XX-XX-LSL
1.5 2.2 1.4 0.5 P1b 2.1
2.2 1.3 0.8 0.6 0.6 2.5 2.4 2.1 1.8 5.2 7.1 9.2
MH = 13'-0" B2
0.6 1.0 1.9 3.2 4.6 5.5 5.9 5.8 4.9 4.2 3.3 2.5 1.9 1.7 1.9 2.5 3.3 4.1 4.3 3.8 3.1
MH = 41'-0" FLOODLIGHT XL W/ SNOOT - WIDE FLOOD OPTIC - REGULAR OUTPUT F1C 0.900 13585 140 LBX RO-120-27K-WFL-XX-XX
D1
0.8 1.5 2.0 1.9 1.2 0.7 L1 3.7 3.7 3.8 3.4 2.5 1.7 1.1 1.1 4.9 LE D
LED L
ED 0.7 0.5 0.7 1.0 1.5 2.4 3.8 D1 UNDERBENCH LINEAR ACCENT LIGHT N1A 0.900 163 1.68 SW24-1_5-DRY-27
B2 0.6 1.0 1.9 3.6 6.2 9.2 10.6 9.2 6.6 4.9 4.0 3.2 2.4 2.0 1.9 2.4 3.5 4.8 6.0 6.2 5.5 4.5 D
LE LED LED LED
D

ED D
LE
L1

DL E
0.1 D1

LED LE D L
E
1.3 1.7 1.6 1.3 1.0 0.6
6.5 6.6 6.0 4.4 2.7 1.7 3.1 13.1 1.4 0.5 0.3 0.3 0.3 0.4 1.5 13.4

LED L
LED LED
0.5 0.9 1.6 3.2 6.1 10.6 15.5 16.2 13.2 9.2 6.8 5.6 4.7 4.6 2.9 2.8 3.8 4.8 6.2 7.5 7.6 6.8 5.8 5.7 LE
D1
CALCULATION SUMMARY - SITE
D D
LE

LED L
B2

L ED D L

LE
D
0.9 1.2 1.0 0.8 0.6 0.5
11.3 10.4 7.7 4.5 2.5 2.8 1.4 0.5 0.3 0.2 0.2 0.5 28.7

LE

D
E
20.3 21.0 16.7 11.7 8.9 7.5 6.0 8.4 8.4 7.6 6.9 7.3 9.1

LE ED
0.7 1.3 2.4 4.6 8.6 14.7 4.8 4.2 3.6 4.3 5.7 7.1
D1

D
LE
D
L3

LED
LE LE

LED
0.0
0.5 0.8 0.7 0.5 0.4 0.4 L1 LE
D LED LED LE
D
D D
LE LE
D
LE D D1
B2 B2 10.5 3.4 2.1 1.3 0.4 0.2 0.2 0.5

LE
ED
17.0 22.2 22.2 17.5 12.5 9.9 8.5 7.0 5.4 7.4 8.3 8.4 7.8 7.4 8.4 11.4 D

LE LE

LED
1.0 1.7 3.1 5.9 10.5 4.5 4.2 4.7 6.0 AREA AVG MAX MIN AVG / MIN

D
DL

D D
LE D

LE D
LE LE
D1

LED LE

D DL
L3

LED

LE ED

D
DL

LE
0.4 0.4 0.5 0.5 0.4 0.3 0.3 0.3 4.3 2.3 0.6 0.3 0.3 0.4 2.9 1.4 0.7 2.1 D1 SCOPE DOCUMENTS

LED

E D ED LE
11.5 17.2 20.9 20.3 16.1 12.1 9.8 8.5 7.2 5.8 4.8 4.5 5.0 6.0 7.2 7.8 7.9 7.5 7.5 8.7 12.0

LE D

LE
L1 0.7 1.2 2.1 3.8 6.8
K

K
D
L
L ED
ROADS 1.1 3.0 0.20 5.5

D
D
LE

LE

LE
0.0
LE
D1

D
LE D D

LED LED
D LE LED L ED LEDLE

LE
B1 1.5 0.3 0.3 0.7 0.3 0.2 0.2 0.4 9.3 4.6 2.6 1.6 1.0 0.4 0.4 0.5 0.7 2.4 9.6 7.9 0.9 19.8 1.8 6.0

D LED
LE D D LE D
LED LE
D1

D
11.5 15.9 18.4 17.2 13.7 10.8 9.1 7.9 6.9 5.8 5.0 4.7 5.0 5.8 6.6 7.1 7.3 7.3 7.6 8.7 11.0 18.6 D
0.9 1.5 2.5 4.3 7.1 The Contract Documents Issued for [Conceptual Design, Schematic

L E ED
B2

L
D LE
L1

LED LED

LE D LE
LED
PATHS 4.32 29.60 0.20 21.6

D LE D LED
1.5 0.3 0.4 0.2 0.2 0.3 1.2 2.6
10.0 11.3 11.2 9.2 7.2 4.5 2.7 1.7 1.2 0.8 4.4 L3 7.9 1.4 0.6 3.6 8.4 13.9 10.3 Design, Design Development, Partial Construction Documents or Other

LED D LED

D LE D
10.8 14.0 15.2 14.0 11.3 9.1 7.9 7.3 6.6 5.9 5.3 4.9 5.0 5.4 6.0 6.6 7.2 7.7 8.2 8.9
B1 1.0 1.6 2.7 4.5 7.2 D1

LED
LED LED
ED LED LED LE LE D LE
DL
Issuance up to Issued for Construction] are intended to be at that level of

E
D D LE D
LE LE D LE

LED
49.9

D L
D L LE
0.0
16.0 D1
D ED D L
LE LED
POOLS 9.58 3 3.19 20.8

LED LED
LE E D

LED L E
0.7 0.6 0.2 0.4 1.8 0.3 0.3 0.3 0.6 B1 7.4 6.2 4.2 2.6 1.4 4.6 2.3 4.1 9.8 20.7 20.6 21.4 18.3 12.1 4.0

D ED
LED

LED
D
11.8 12.2 10.9 9.0 7.6 7.1 7.3 7.2 6.7 5.9 5.3 5.1 5.2 5.6 6.4 7.6 8.9 9.8 10.0 9.8 9.6 8.9 L E D
development and as such, may be neither complete nor coordinated. The

LE D L
0.8 1.2 LED LE1.8 2.9 4.6 6.8 9.4

D LE D
LE D L
LE D LE

LE
LED LE LED
D1

D ED
D
L3

LE
LE

LE D
LE D
D D

LE D LE
D
LE

D LE
[Construction Manager, Contractor, Design/Builder] is responsible for

D LE
LE
ED

LE D
0.6 0.2 0.2 0.3 1.1 2.4 0.7 0.9 0.7 0.4 1.3 1.2 15.9 20.1 19.2D120.2 18.4 13.8 5.6

LE ED
6.0 5.1 3.7 8.4 2.5 8.6

DL

LE
D

D
DL
LE
9.5 9.5 8.4 7.1 6.5 7.3 8.9 9.6 8.9 7.5 6.2 5.4 5.1 5.4 6.5 8.5 11.2 12.8 12.4 10.5 8.6 7.3 ZERO ENTRY 14.24 49.9 6.3 2.6

L
LE D
LE D D

ED
1.7 1.7 2.0 2.9 4.4 6.2 8.0 D1

D
LE D

LED LE
LE L
D LED

LE
L3
D ED D ED ED E
DL DL complete and coordinated pricing [and execution] of the Work, and shall

LED
LE LED LED LE D L LE LE D

0.0 D LED
LED D LED
LED L
E D
LE D LED LED LE D LE
LED LED LE
LED LED
D1

LED
L LE
LE ED

LE D
2.3 0.6 0.2 0.2 0.5 2.0 0.9 0.3 0.8 ED 0.6 2.5 3.5 8.4 12.5 4.2 1.7 3.0 1.2 0.5 0.3 0.3 0.4 1.2 3.8 3.2 1.0 1.5
LE
D
6.7 D
14.3 19.7 21.0 20.9 20.1 15.1 8.5 3.4 include items necessary for the proper execution and completion of the
L
12.7 14.4 12.7 9.7 7.3 5.7 5.0 5.2 15.8 11.5 7.9 6.0 D1

LE
D

D
4.0 2.2 2.8 4.0 5.4 6.6 7.2 7.1 6.2 5.5 6.0 8.8
B1 B1

LE
SCOPE BOUNDARY 0.36 1.60 0.00 N/A

LED LE

LE
D LED
B1 B1 D1

LE
D

D
L3 L ED D

LE
LE
Work, as shown, specified, reasonably inferred or required for a complete

D
LE D
LED LE
D
B1

LE D
5.8 0.7 0.3 0.2 0.4 2.7 0.9 0.3 0.7 1.0 0.7

LE D
9.9F1c
4.7 5.6 8.5 13.9 19.2 18.9 13.4 8.2 5.5 4.2 3.4 2.7 1.6 0.8 0.7 0.5 0.4 0.3 0.3 0.3 0.3 0.4 0.4 0.4 1.0 5.0 13.4 17.7 19.0 16.6 18.1 16.2 14.3 10.0 5.8
16.3 18.5 15.5 11.3 8.0 5.9 L3

LED
LED
1.7 1.9 2.6 3.5 4.5 5.2 7.7 5.3 4.7 4.5 5.6 D1 Project. For Work of delegated designs; systems, assemblies,

D
LE

LE
D
LE
0.0
D LED LED
MH = 20'-0" PORTE COCHERE 13.80 21.4 0.3 46.00

LED
1.2 1.0 0.2 0.2 0.6 0.7 0.3 0.8 6.8 3.5 12.3 15.8 14.7 11.6 13.3 16.8 ?19.3 15.7 10.6 components and materials shall comply with national, state and local code

LE D
4.7 4.2 4.7 7.1 12.0 17.0 16.7 11.3 6.6 4.7 4.0 2.7 2.1 2.2 3.6 1.5 0.3 0.8 4.3
B1 1.8 2.3 3.0 3.6 4.0 4.2 4.4 5.3 B23.9 4.8 8.8 14.4 17.2 14.7 10.8 7.6 D1 D1

D
LE
L1 requirements. The [Construction Manager, Contractor, Design/Builder]

LE
D
1.5 0.3 0.3 0.6 0.7 0.5 0.6 0.4 0.4 B2
2.2 2.0 2.5 2.9 3.1 3.1 2.9 2.7 3.1 4.7 6.9 9.4 11.6 10.7 8.4 6.3 5.2 4.1 3.5 3.5 4.8 7.3 9.9 F1c
9.7 6.8 4.6 5.9 4.5 2.2 1.7
L1 L1 LE
D
4.5 12.0LED 14.3 9.7 4.9 7.6 14.7 21.4 21.5 14.4
shall inform the Owner and Architect, in timely fashion, of any discovered
B1 B1
J

J
L ED

0.0 MH = 20'-0" B1 LED

1.7 0.7 2.2 2.6 0.4 0.3 0.4 LE


D
LED LED
LE
D 7.2 6.4 5.2 4.6 2.7 2.5 2.8 3.6 4.3 4.2 3.3 2.9 4.6 3.9 1.8 4.4 11.6 14.3 9.2 3.1 4.9 13.5 20.0 21.3 14.8 7.0 omissions, inconsistencies or errors in the Contract Documents.
1.1 1.7 2.0 2.3 2.4 2.3 2.2 2.2 5.9 6.5 LED LED LE

D
B2 B2

LE
B1 D

LE
LE D
L1 0.7 1.0 0.8 0.5 0.6 0.5

LE
ED
1.3 0.9 2.2 3.3 B12.8 0.4 0.3 0.4

D
4.2 4.0 1.8 1.9 2.0 2.1 2.0 1.8 1.8 2.3 3.3 10.9D1
14.4 11.0 4.1 4.1 12.1 19.1 22.6 17.7 9.1

DL
LE D

LE D
LE D
L1 D1

LED LE
1.8 1.8 1.8 1.8 1.7 1.9 5.2
B2 L3 B2 B2

LED
B1

LED
0.0 1.1 0.8 0.8 0.7 0.7 0.7 0.7 0.7 0.7
L3

LED
B1

LED
LE D
B1 0.6 1.3 5.5 4.4
L1 0.7 0.9 0.5 0.4 1.5 1.7 2.2 1.4 1.3 1.3 1.4 8.2 13.3 13.9 7.3
D1
4.9 11.4 17.6 21.2 16.4 10.8

D
1.5 1.5 1.3 1.4 1.4 1.3 1.5 3.1

LE

LE
LE

D
LE D

LE
D
D LE
LE D D 1.6 1.3 1.2 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
B1 LED LE
12.5 17.6 D1

LE

D
1.0 4.6 0.6 0.4 0.9 2.2 1.6 1.6 1.8 2.5 2.2 1.4 1.5 4.2 1.3 1.2 1.3 L1 5.0 12.1 13.9 11.5 8.1 21.2 19.3 13.1 4.5

LE
B21.2

D
0.4 1.1 1.1 2.4 LED
LED B2 D1 ISSUANCES
ISSUANCES
LED

0.0 B1 B1 2.1 2.0 1.7 1.5 1.5 1.4 1.4 1.4 1.4 1.5 1.6 1.7 1.8 1.9 1.8
1.0 0.5 0.4 0.6
B2 1.4 1.1 1.2 1.3 1.6 1.4 1.2 1.4 1.4 1.4 1.7 D1 15.4 16.8 14.3 16.5 19.0 20.1 18.5
9.2 D1 13.6 6.2
0.3 0.9 1.9 1.3
B1 2.3 2.3 2.3 2.2 2.1 2.0 2.0 2.0 2.1 2.2 2.4 2.6 3.0 3.5 3.7 3.6 3.2 D1 No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
0.4 0.6 2.7 1.6 2.3 4.2 2.1 3.3 7.7 14.6 D1
18.3 18.7 19.0 20.7 20.9 21.0 16.4 8.1
0.0 L1
0.2 0.4 0.7 1.1 B1
B23.2 3.1 3.1 3.1 3.1 3.1 3.2 3.2 3.3 3.5 3.7 4.4 5.3 6.5 7.6 7.7 6.5 4.8 D1 01 IDD
1 IDD Submission
IDD
IssueSubmittal
for IDD
Package 11/20/23
11/20/2023
11/20/2023
11/22/23
0.2 0.3 0.6 B1 1.4
0.8
B1 0.9 1.3 3.0 2.2 B1 2.6 2.7 4.8 7.0 14.4 20.1 22.2 21.5 22.3 20.4 21.5 16.3 9.8
D1
3.8 4.1 4.3 4.4 4.5 4.7 5.0 5.3 5.6 5.8 5.8 6.1 7.0 8.8 14.6 12.2 8.5
13.6 16.1
D
B1 1.9 3.8 1.0 0.9 B1 3.5
F1h
14.3 19.8 23.9 22.3 24.2 22.7 23.3 18.8 11.1 2.8
LE 0.4 1.1 0.8 0.4 2.5 0.5 0.4 0.9 0.7 D1
H

H
D
0.0 LE 4.3 4.9 5.4 5.7 6.0 6.4 7.1 8.1 9.3 10.2 10.5 10.4 10.1 10.5 11.8MH
B1 1.0 0.7 0.8 1.0 11.8 14.3 18.2 21.9 21.7 = 41'-0" 25.8 23.3 24.0 20.9 21.9 17.4 11.5 3.3
D
LE

0.3 0.3 0.5 1.6 1.8 2.3 1.1


D

B1
LE

4.8 5.5 6.4 7.0 7.4 7.7 8.3 9.6 11.5 13.7 16.2 12.1 7.7 8.8
1.1 2.7 1.7 1.3 0.6 0.6 0.7 0.9 1.1 18.2 19.4 19.1 17.3 15.6 16.1 18.6 21.0 20.3 15.7 D1
21.9 22.6 21.6 21.8 19.1 12.8 4.3
LED

0.5 1.9 0.4 0.3 0.6 0.8 B1 0.8


0.0 B1 6.0 7.0 8.1 8.8 9.1 9.2 9.7 11.1 13.4 10.0 7.2 7.9
B1
LED

B1 1.5 0.6 0.6 0.7 0.8 1.1 1.6 9.3 14.3 17.6 20.4 22.7 23.0 20.8 17.3 15.2 15.3 15.5 14.4 11.6 21.3
D119.9 20.4 18.5 13.5 5.5
0.7 1.1 0.3 0.3 0.8 0.5 1.7 5.6 0.8

1 / LD9.56
L ED

B1 7.7 7.6 10.3 11.3 7.9 6.6 7.3


B1 B1 0.9 1.2 1.7 9.7 10.8 11.2 10.9 10.4 11.7 13.7 16.2 18.3 19.9 19.7 17.5 14.4 12.3 11.3 10.6 9.6 8.5 F1f (TYP 2) 21.7 21.7 21.5 20.5 15.1 6.9 1.4
LE

L3 2.4
D

2.5 0.7 0.2 0.3 2.2 0.3 0.3 0.5 0.7 0.5 0.5 0.8 0.7 1.4 1.4 MH = 41'-0"
0.0
LED

2.0 3.0 4.4 6.3 8.2 6.8 6.3 6.9 D1 20.5


B1 1.1 0.5 0.5 0.6 0.9 1.2 10.6 11.9 12.7 12.8 11.9 10.9 10.6 11.3 12.3 13.4 14.0 13.9 13.0 11.7 10.1 9.2 8.6 6.9 F1c 20.9 19.5 20.1 15.4 8.5 2.0
LED

1.4 2.3 0.5 0.3 0.6 3.6 0.4 0.9 2.1 1.4 2.6 0.8 1.7
MH = 41'-0"
LED

2.1 3.3 5.0 7.3 9.8 ED


LED LED25.2 9.0
LE
6.5 6.3 6.2 6.0 6.3
B1 12.9 14.0 14.2 13.7 12.4 11.1 10.7 11.3 12.0 12.0 11.3 10.1 8.9 7.9 7.5
LED

0.5 0.5 0.6 LE


DL D
21.2 22.1 21.3 21.4 17.3 10.5 3.6

LE
0.8 1.2 0.3 0.3 0.8 1.7 0.6 0.7

D
D1

LED LE
LED

D LED
0.0 B1 1.3 2.1 3.4 5.4 8.2 11.4 L3 6.3 6.0 5.8 5.5 5.5
L1 14.9 15.4 14.7 13.2 11.6 10.5 10.6 11.5 12.0 12.0 12.3 9.2 7.3 6.5 6.5
LED LE

0.5 0.5 22.2 20.1 21.5 19.2 20.9 17.5 14.2 9.0 5.4

LE D

LE D
0.3 0.6 0.2 0.3 0.7 0.5 0.7 LED

D
LED

LE
ED L
D1

LE
ED

D
DL LE
D LED

D LED LED
0.8 1.2 1.9 3.2 5.3 8.4 12.0 LE 9.2 6.6 6.2 5.7 5.0 4.6
B2

LE
D
15.1 15.3 13.5 11.3 9.5 9.0 9.8 11.0 11.6 21.4 6.8 6.0 6.1 7.7

LED LE
17.3 21.7 20.9 21.9 21.3 21.6 20.0 18.6 14.3 10.2

D LED
L3
LED

0.2 0.5 0.3 0.2 0.3 1.0 0.4 0.9 0.6 0.6 0.7 0.9
G

G
LE D
D

LE D
0.1 0.8 1.1 1.6 2.7 4.5 LEDLEDLE DLE D
7.3 10.7 13.4 12.3 9.7 12.6 7.0 5.9 4.8
LE

LE
D
B1 B2 LE
D LE
6.9 8.2 9.5 17.0 6.4 6.1 6.4 7.0 7.6 7.9 7.8

D
LE
LED
D
17.2 21.2 20.3 20.8 19.7 20.4 19.8 20.3 19.1 14.4 6.0

LE
D1

D
LED LED LED LED LED LE

D
D LED LED

LE
1.2 1.2 1.0 0.6 0.5 0.2 0.2 0.2 0.5 2.3 0.7

LE

D LE
0.7 0.9 1.3 2.0 3.3 5.3 7.8 9.9 10.2 8.6 6.5 5.2 5.2 9.1 9.1 6.4 4.8

D
LE
6.6 8.6 7.1 6.5 6.6 7.1 7.9 8.7 9.1 8.9 14.9 20.0 21.1 21.4 21.6 21.4 21.3 20.4 19.8 14.8 8.9
L1 B20.5 3.0

LED
0.3 1.4 3.2 6.2 1.0 0.2 0.2 0.2 0.6 4.1 D1

D
LE
0.1 B2
1.2 0.7 0.8 1.0 1.5
D L32.2 3.3 4.8 5.9 6.2 5.2 3.9 3.3 4.0
F1j (TYP 3) 6.9 10.5 12.2 11.2 6.7 4.7
D1

LE D
LE

0.3 0.7 2.5B1 1.9 0.6 0.3 0.2 0.3 0.7 B1 0.5 0.7 0.4 4.7 4.7 3.8 ED
B2
9.5 7.8 7.1 7.2 7.7 8.6 9.4 9.7 9.4 8.1 F1j 19.4 20.9 19.7 20.7 19.5
14.5 20.8 19.9 21.0 18.3 14.7 10.1
L
MH = 41'-0" MH = 41'-0" D1

D
D
LE

LE
B2 0.7 0.7 0.7LED 0.9 1.1 1.5 2.0 2.6 3.1 2.4 5.4 15.9 29.9 31.1 22.3 6.2 4.2
14.0 9.7 5.6 6.4 8.2 8.8 9.3 9.4 8.8 7.4 D1 21.4 20.8 21.9 21.1
18.0 21.7 20.2 21.2 18.7 19.1 14.3 9.7

D
LED
6.4 5.4

LE
0.4 0.3 0.4 0.5 0.5 0.4 0.3 0.4 1.1 F1h

LED
D
7.7

LED
LE

LED
0.2 0.7 0.7 0.8LE 0.8 0.9 1.1 LED 1.3 1.6 1.8 4.1

LED
MH = 41'-0" 17.7 21.1 D1

LED
D 5.2 5.9 6.7 7.4 8.6 8.8 8.6 5.5 19.4 21.1 19.1 21.2 19.7 21.5 20.6 21.3 18.7 12.2 3.8

LED
5.3 5.5 4.0

LED
LED
0.8 0.6 0.6 0.6 0.6 0.5 0.4 0.5 0.9
L1 B2
1.0
L1
LED
LED LED
L1 F1h

LED
LED
6.4 7.9

LED

LED
B2 0.9 0.9 1.0 1.1 1.1 B2 MH = 20'-0" D1 16.1 20.9 20.7 21.7 21.2

LED

LED
7.7 8.6 8.4 8.0

LED
21.6 20.5 21.0 19.5 20.3 17.8 12.9 5.0 0.8

LED
1.4 1.5 1.2 1.2 1.4 0.7 0.5 0.6 1.7 B1 B2 1.0 3.4 4.4 4.1

LED
0.2
F2a F1j

LED
6.9

LED
D
LE
P1b 1.2 B21.2 LE
D

15.9D120.2 19.7
MH = 20'-0" ED D
MH 20.3
= 41'-0"
19.6 20.4 20.2 20.9 21.0 21.3 20.4 15.0 6.3 1.1

LED
L LE
5.5 6.2 4.4 D

LE D

LE D
LE
0.9 1.3 1.9 2.1MH2.0
= 13'-0" 0.7 0.6 1.0 2.3 2.1 0.9 1.2 L2

LED
D
LE
2.2 2.6 5.2 9.0
LE
D
LE
D LE
D
L2

LE D
LE
D D

LE
LE ED LE D
L

D
D LE

D
LE
L1 19.5 20.9
D1 21.2 21.5 21.3 21.4 20.6 21.0 20.0 20.2 14.9 7.6

LE D
B1 9.0 7.7 4.6 LE
D D LE
D

LE D
LE
L1 L2

LE
D
0.7 1.0 1.3 1.6 1.6 0.7 1.1 2.2 0.6 0.7 1.2 LE

LE
0.2 D
F

F
LE

D
LED LED
1.6 2.7 3.3LED LED 7.8 8.7 10.6

D
LE
3'-4" D1

LE D
D LE D

D
LE
LE D
14.8 10.7 D
L2 LE
- / ---

F1a LE

LE
D

D
D LE
1.9 LE
17.9 19.3 18.0 20.3 19.9 21.8 21.1 22.5 21.9 21.9 16.9 8.4

D
D

D D
8.1 9.6 7.2 4.7

LE
LE

LE LE
LE

LE
0.5 0.7 0.9 1.1 1.0 0.9 0.6 1.1 0.6 1.4 3.4 1.2 LE
D
D1
D

D
D
MH = 20'-0"

D
LE D
6.1 6.8 D 9.4 LE
F2a
LE D

LE D

LE
18.5 15.6 LE
D1
LE D

LE
D
LE D
12.5 14.1 14.0 18.2 20.4 21.8 20.4 D1

D
LE

D
1.7

D
21.3 19.5 20.3 15.2 8.6

LE
D

MH =7.0 7.3
20'-0" 7.0 6.6 5.5 LE

LE
LED
LED

0.1 0.2 0.3 0.4 0.5 0.6 0.6 0.6 0.6 1.4 0.6 0.7 1.0 1.2 LED D
L3 LED LE
LED

D
LE
1.6
LED
1.8D LED LED LED LE 3.2 4.6 5.1 5.7 6.3 LE
D
D1

D
17.5 17.2 LED D LE

LE
LED D
D16.8
LE

LED
1.5 LED

LE
D

LED LE
D
5.9 5.5 11.5 14.7 19.1 19.4 21.0 20.4D120.5 16.5 8.9
LE
D

7.8 9.9 9.8 8.3 7.0 6.8 4.8 3.9 3.6 4.8 5.5 4.7 3.4 LED

D
LED
0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.5 1.7 0.8 0.7 0.8 1.0 1.3 1.5 2.2 3.6 6.5 11.6 LED
LED LE D
LED
2.1 3.4 3.8 4.2
LE

LED
D1
LE

B21.4
D

LED
LED 15.8 17.3 12.9 LED
LED LED
L1 7.2 9.1 8.3 6.6 6.8 7.2 6.1 5.5 6.9 7.6 6.7 4.8 L2 LED 1.4 1.2 2.3 5.6
D1 9.6 14.5 18.0 21.1 18.9 20.0 14.4 8.5
0.1 0.2 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.4 0.6 1.2 0.8 1.6 2.8 1.5 2.1 3.5 5.9 10.2 F1a F2a D LED
LED LE
D LED
LED LE
D LED
D1
9.0 13.4 16.4 13.9
MH 1.1
= 20'-0" MH = 20'-0" D LE D LE D LED
LED LE
2.6 1.2 0.8 0.7 0.8 0.7 1.0 1.8 4.0 D121.1 19.9 15.0 6.6
10.0 16.7 22.0
0.2 0.2 0.2 0.3 0.3 0.4 0.5 0.5 0.5 0.5 0.5 0.7 1.2 1.1 0.7 1.4 2.1 3.2 5.2 B2 3.8 3.7 4.3 6.1 6.2 6.1 7.1 6.9 LED LE
D LED
LED LE

LED LE
D LED D1
D LED
F2a

D
LED LE
7.5 11.0 13.8 14.0

LE
D LED
LED LE
1.6 1.8 1.9 LED
2.0 3.3 2.1 1.8 D LED 2.1 2.5 0.9 1.1 1.1 1.9 5.9 D1 11.2 4.5
13.6 17.2 20.4 16.1

D
LED D LE

LE
D LE
0.2 0.3 0.3 0.3 0.4 0.4 0.7 0.9 0.8 1.0 0.6 0.4 0.4 1.6 B2 1.3 1.9 2.9 4.4 L1 MH = 20'-0" L ED
D LED
LED LE

D
L1
LED
LED LE
D1

LE
LED
LED

D
5.9 11.1 12.5 10.7 L2 1.7
F2b

D
B1

LE
LED

LE
1.9 1.1 0.8 0.7 0.7 1.4 1.5 1.5 1.6 1.7 LED
1.7 1.9 2.0 3.2LED
LED
1.1 1.3 1.4 1.4 1.4 2.8 8.1 15.0 18.0 15.3 8.2 2.4

D
B2

D
LED

LE

LE
0.5 0.5 0.5 0.6 0.8 1.3 1.3 1.0 1.0 0.4 0.4 1.6 0.8 1.7 2.4 3.6 7.3 L1 MH = 20'-0" L1
LED LED

D
LED LED

D
L1

LE
P1b D1

LE
LED LED
8.4 9.9 9.7 F2a LED

D
LED

D
LE
LED

LE
LED
2.9 1.4 0.9 0.7 0.6 0.6 0.7 0.7 0.8 1.0 1.2 1.4 1.5 1.4 1.2 1.3 1.4 1.6 1.6 2.4 1.8 2.0 1.5
MH
1.9 = 1.9
13'-0"1.3 B1
LED
L2 1.81.6 2.0 2.3 2.0 2.1 10.0 11.7 10.2

D
MH = 20'-0" LED

LE
0.3 0.9 1.2 1.3 1.4 1.0 1.6 0.4 0.4 1.3 1.7 1.4 1.9 2.8 3.9 5.5 B2 L1 LED
E

E
D
LED

LE
LED
7.6 8.1 7.0 LED
D1

D
B2

LE
3.2 2.0 1.3 F2a 0.7 0.6
0.9 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.2 1.2 1.2 1.4 LED
LED 2.0 1.2 1.6 1.9 2.0 3.3

D
LE
LED
1.4 1.8 2.1 2.2 1.6 1.1 0.8 1.8 0.5 0.4 0.5 1.6 1.5 1.2 1.6 2.2 3.0 4.1 5.4
MH = 20'-0" P1b
B1 B2 6.3 6.4 6.0
4.1 2.1 2.2 1.0 0.8 0.9 0.7 0.8 0.9 1.7 B21.3 1.2 1.2 B2 1.2 1.2 1.3
0.3 1.0 1.2 1.4 1.4 1.1 0.9 0.6 0.5 0.5 0.5 0.3 0.3 0.8 1.3 1.7 2.3 3.1 4.0 4.9 B2 2.7 1.1 1.2 MH = 13'-0"
L1 5.0 6.1 8.1 10.2 B2 5.4 6.4 4.6
1.3 1.2 1.3 1.4 1.6 1.9 D1
4.7 2.2 1.5 1.2 1.6 0.9 1.0 1.1 1.2 1.3 1.4 1.3 1.3 1.2 1.3 P1b 1.0 0.9 0.8
0.7 0.8 0.9 1.0 0.8 0.7 0.5 0.4 0.7 0.3 0.3 0.5 1.9 1.1 1.4 1.8 2.3 3.0 3.7
B2 6.0 10.0 18.1 21.4 12.0 15.5 7.7
1.4 1.3 1.4 1.5 1.8 2.0 2.4 2.5 1.7MH = 13'-0"
F1g2.2 1.6 1.3 1.2 1.3 1.4 1.6 1.7 1.7 1.6 1.5 1.4 0.9 0.7 1.1 1.4
0.2 0.5 0.5 0.5 0.5 0.7 0.8 1.4 0.3 0.3 0.4 0.6 1.1 1.1 1.4 1.8 2.3 2.8 3.7 1.6 1.7 1.8 2.0 2.3 2.4 2.6 2.9 2.5 2.2 1.7
B2 9.5 19.6 31.4 23.5
MH = 20'-0" 9.5 24.7 26.4
0.3 0.3 4.7 1.0
B12.9 0.6 0.3 0.7 1.0 0.4 1.4 1.7 1.7 2.1 2.8 4.4 8.5
2.7 2.2 1.9 2.0 2.2 2.2 2.2 2.0 1.8 1.7 1.6 4.0
3.1 3.4 3.3 3.2 3.4 3.8 3.9 3.6 2.9 2.4 1.9 1.5
L1 15.0 28.8 28.9 14.3 6.0 18.2 B1
3.2 3.1 3.0 2.6 2.3 2.2 2.5
B1 5.7 1.1 2.9
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

0.1 1.2 0.6 2.6 3.2 2.2 1.4 1.7 2.1 3.1 5.9 12.9 F1a F1b5.5 9.4 10.9 8.7 6.7 6.3 7.3 8.1 7.2 4.7 2.5 1.6 1.2 1.1
B1 0.5 3.5 1.4
LE
D LED LED
LE
25.8 16.6 8.3 6.5 7.0 6.3
4.9 3.5 3.0 2.8 3.3
9.0
MH:25.0 32.8
20'-0" MH: 20'-0"
7.8 8.1
2.2 2.8
PROJECT STARBOARD
D

D
B1
LE

1.1 0.9 2.4 3.5 3.1 LE 3.3 2.3 4.0 8.0 15.4
LE

5.3 9.4 21.7 25.1 10.8 4.2 1.6 1.0 1.0 1.1
LE D

D
LE
D

LE
12.5 7.1 6.5 9.0 9.9 8.1 6.8 6.1 5.3 10.2 19.2 25.6 17.5 12.6 13.4 19.0 24.8 21.3
LE

IDD PACKAGE
LE D

D
LE

B1
D

1.6 0.6 0.5 1.7 2.1 2.2 1.0 0.7 1.7 6.0 1.2 7.2 3.5
LE

LE
D
LE

LE

D
0.1 1.6 1.4 1.9 0.9 2.6 4.7 8.3 10.3 9.9 L3
D

D
D

LE
D

LE
L3 4.1 8.7 8.3 1.9 0.9 1.0 1.2 1.4
LE

D
D

D
D

LE

LE
LE

LE
6.1 10.1 10.0 7.9 7.5 6.9 5.8 6.2 8.6 10.9 21.8 24.6 19.5 15.3 17.8 30.2 49.4 49.9 23.4
D

D D
LE

LE
B1 LE
LE
D

D
0.9 1.8L
D
10.1 2.3
LE

LE LE
F2a
LE

B1 1.9 0.8 3.7 4.4 5.1


D

LE D
LE

ED
4.1 3.1 5.4 13.1 2.2 0.9 1.1 1.4 1.8
D

D
B1
D
LE

LE LE
11.8 15.6 16.0 15.8 19.1 33.3 42.6
LE

LE
D

D
D D
MH = 20'-0" 8.0 8.4 8.2 7.1 5.7 8.3 10.2 7.8
LE

LE LE LE
D

D D D
L3
LE

LE
D 1.5 1.1LED LED LE
D 6.3 1.2
0.0 LE LE
3.8 B1
D

D
D
3.4 2.9 3.9 10.6 1.7 1.0 1.3 1.7 2.2
LE

LE LE LE
D D D
LE
D
LE
LE
D
LE
9.1 7.9 6.5 12.9 17.7 7.2 10.8 14.3 17.7 21.3 27.2 40.8 46.3 21.7
D
D
LE
D
1.0 2.6
LE
D 5.6 P1b 4.0
LE
LE D 3.5 2.9 3.5 1.1 1.1 1.4 1.9 2.4 1.5
D
LE
D
LE
D
L3 LE
D
LE
D
7.5 6.3 17.9 29.2 15.8 6.0 9.3 14.0 19.9 24.4 23.3 17.8 12.7 F1b (TYP 3) MH = 13'-0" B1
LE
D 1.5 1.2 LED LE 1.5 MH:1.0
20'-0"1.2 3.1
0.0 L
ED
LE
D
LE 3.5 2.9 3.3 1.3 1.5 1.8 2.4 2.1
L3
D
LE
D
LE
D
LE
D 6.0 5.3 19.8 18.6 F1b 5.0 7.6 11.3 15.8 18.6 15.7 8.2
0.9 2.4 1.4 2.5
D
LE
D
LE
D
MH: 20'-0"
2.9 3.1 1.4 1.4 1.4 1.5 1.7 1.9 2.0
LE
D
LE
D
F1a 4.4 4.1 19.4 32.3 17.0 3.9 5.2 6.9 8.6 8.9 6.8 3.9
2.5
LE 0.6 2.7 1.7
0.0 D
MH: 20'-0" 3.0 3.0 3.2 2.8 2.6 2.5 2.2 1.9 1.7 1.7 1.7
7007 SeaWorld Dr, Orlando, FL 32821
LE
D
LE
D
5.0 4.5 3.7 23.1 13.6 5.3 3.6 4.0 4.4 4.6 4.3 4.0
LE
D
LE
D 3.0 1.9
B1 3.7 D1
LE
D
3.8 3.5 7.4 6.7 5.6 4.3 2.8 2.0 1.7 1.8
B1

LE
D 8.2 10.3 7.5 12.3 8.3 5.2 4.5 3.4 3.5 4.4 6.5 8.9
LE

1.0 2.5
D

0.0
LE
C

C
4.1 2.5 2.7 4.4
D
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

D1
LE

10.1 22.2 23.7 5.1 5.0 6.6 8.4 4.5 4.4 5.7 9.9 17.6 25.4 26.1 21.7
SEAWORLD
D LE

0.8 9.2 B1 2.7


D LE

3.1 4.1
D LED

10.1 27.6 5.5 9.7 14.2 16.8 14.7 10.7 7.6 5.7 5.8 9.4 16.8 24.3 29.0 24.8 14.1 6.7
1.0 5.5 6.7 7.5
0.0 F1a D1
19.0 8.8 15.7 21.5 23.6 18.3 11.3 6.5 4.7 5.3 7.4 8.8 9.5 8.9 6.6 4.2 3.9
MH: 20'-0" F1a

0.0
1.5

1.6
15.8 17.6 17.8 16.4 10.3 6.0 MH: 20'-0" 3.8 8.2
F1a
19.0
21.5
15.4 8.1

D1
SITE PHOTOMETRICS
MH: 20'-0"
1.3
6.9

3.5
6.8

4.5
4.9

6.6
4.3

10.8 F1a
F1a
MH: 20'-0"
F1a
MH: 20'-0"
21.6

27.9 26.6
14.6
D1
AREA 05
SHEET NUMBER: LD9.55 - SITE PHOTOMETRICS AREA 05

1.1 6.1
0.0 MH: 20'-0"
4.5 9.2 20.3 30.2 29.0 7.1 13.4 21.9 23.4 17.8 12.2 6.9 6.0 11.0 15.8 11.3

1 / LD9.59
1.1 2.0 6.1 4.0 5.8
DL
ED
LED LE DL
ED
F1a D1
LE 12.9 21.3 29.6 26.6 16.3 7.5 4.6 6.1 MH:15.3
17.4 20'-0"
10.7 6.4 5.1 7.3 13.1 21.2 27.0 25.9 18.6 10.3 6.4 6.6 6.8
LE
D
LED LE

D LED

1.5 1.9 12.6 4.1 7.0 2.5


0.0 L3
B

B
LE D

LE D

11.3 13.4 10.5 6.7 5.9 10.1 20.3 31.7 34.0 29.0 18.1 9.1 5.4 5.4 5.0
D
LE

1.8 4.6 LED LED LED 8.1 2.1 2.9 4.1 6.2 4.9 6.1 7.9 9.8 10.3 8.4 5.3 3.6 2.8 2.2 D1
LE
D

B1
4.3 4.7 7.5 12.9 16.6 18.4 16.5 11.6 D LED L
D LE

A. Ebben USS-23002562-00
ED
1.4 1.1 1.0 1.0 1.2 1.7 2.2 3.0 3.4 3.6 9.9 6.9 4.2 2.9 2.5 2.7 3.2 4.1 LE 16.7
0.0
LE
ED

D
DL

LE D

D1
LED LE

L3
LED

B20.4 0.5 0.5 0.6 0.8 1.0 1.3 1.5 1.8 2.2 2.7 3.3 3.7 3.8 3.8 3.5 2.8 2.3 1.7 1.5 1.4 1.5 3.1 Principal-in-Charge Project No.
LED
LE D

11/20/23
D

D1
LE

J. Baker 11/10/23
LE
D

LE D
LE
0.2 0.2 0.2 0.2 0.9 1.0 1.2 1.4 1.4 1.5 1.5 1.4 1.3 1.3 1.1 0.8 1.4 D
LE D
LED LE
D
0.0
D1 Project Manager Date
B20.3 0.2 0.2 0.2 0.7 0.7 0.8 0.7 0.7 0.7 0.6 0.6
11/10/2023 6:56:07 PM

L1 B2 D1
0.9 0.3 0.2 0.3 0.4 0.5
L. Dixon
0.0 B2 D1 Designer
0.2 0.2 0.7 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.3
L1 B2 B2 D1 L. Fordyce
0.0 B2
0.2 0.2 0.2 0.2 0.2 0.4 0.3 0.2 0.2 0.2 0.2 1.3
B2
L1
Drafter
LD9.55
A

A
B2 D1
L1 0.2 0.2 1.1 0.2 0.3 0.2 0.2 0.8 B20.2
B2
B2 D1 D1
0.0
0.2
L1 D1 1" = 20'-0"
1 / LD9.58 L1 L1 D1
D1 D1
L1 D1 Drawing No.
0.0 D1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0.0

1 / LD9.53 1.3 1.8 1.4 1.1 1.1 P1a


MH = 20'-0" 0.0

1.6 1.6 1.3 1.1 1.2 0.0


0.1 0.1 0.1 0.1 0.0
0.1

1.9 1.6 1.3 1.3 1.6


BUILDINGS • EARTH & ENVIRONMENT • ENERGY
0.1 INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
P1a
MH = 20'-0"
0.2 0.5 1.2 2.1 1.6 1.4 1.6 1.8
0.1
L

L
0.1
0.2 0.6 1.6 1.3 1.1 1.0 1.3 2.1 1.5 1.2 1.3
1 / LD9.52

0.1

0.8 1.2 1.1 1.1 1.2 1.7 1.7 1.3 1.0 1.2 0.2

0.2

0.8 0.9 1.3 1.6 1.7 1.5 1.2 1.1 1.3 0.3

0.3
1.1 2.0 1.7 1.4 1.3 1.4
SCOPE DOCUMENTS
P1a
K

K
MH = 20'-0"
0.3 The Contract Documents Issued for [Conceptual Design, Schematic
1.1
P1a 2.2 2.0 1.5 1.4 1.8 Design, Design Development, Partial Construction Documents or Other
MH = 20'-0" Issuance up to Issued for Construction] are intended to be at that level of
0.3 development and as such, may be neither complete nor coordinated. The
1.2 2.1 1.8 1.3 1.2 1.9 [Construction Manager, Contractor, Design/Builder] is responsible for
complete and coordinated pricing [and execution] of the Work, and shall
0.3 include items necessary for the proper execution and completion of the
1.7 1.9 1.5 1.2 1.2 P1a Work, as shown, specified, reasonably inferred or required for a complete
MH = 20'-0" Project. For Work of delegated designs; systems, assemblies,
0.3 components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
1.9 2.0 1.8 1.5 1.3 1.3
shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
0.3
omissions, inconsistencies or errors in the Contract Documents.
P1a
MH
2.1= 20'-0" 2.3 1.6 1.5 1.7

0.2

1.0 2.0 1.8 1.3 1.2 2.1

0.2
ISSUANCES
ISSUANCES
No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
1.3 1.4 1.8 1.5 1.1 1.1
P1a
MH = 20'-0" 0.2 01 IDD
1 IDD Submission
IDD
IssueSubmittal
for IDD
Package 11/20/23
11/20/2023
11/20/2023
11/22/23
1.8 1.7 1.6 1.4 1.2 1.1
H

H
0.2

0.9 2.0 1.7 1.6 1.6 1.4 0.3


P1a
MH = 20'-0"
0.3
1.0 1.9 1.5 1.3 1.7 1.7

0.3

0.9 1.4 1.6 1.3 1.1 1.3


0.4
P1a
MH = 20'-0" 0.4
1.4 1.2 1.3 1.4 1.2 1.0
G

G
0.5

1.7 1.9 2.0 1.4 1.3 1.4 1.3 1.2


P1a 0.6
MH = 20'-0"
D1
1.9 1.4 1.6 1.9 1.3 1.1 1.5 1.7 0.6

D1
0.6
1.7 1.9 1.4 1.2 1.4 1.1 0.9 1.2
6.1 D1

0.6
D1 P1a 1.4 1.6 1.8 1.3 1.3 1.2 1.0 0.9 1.1 P1a
5.9 MH = 20'-0" MH = 20'-0"
F

F
D1 0.5

1.5 1.7 1.9 1.4 1.2 1.1 1.1 1.1


5.6 19.6
D1
0.4

D1 1.1 1.4 1.6 1.8 1.3 1.0 1.0 1.4 1.4


19.4
D1
0.3
D1
D119.3 0.8 0.9 1.0 1.2 1.3 1.0 0.7 0.8 1.5
15.8

D1
1 / LD9.55

0.3

19.2 16.0 1.7 0.3 0.3 0.5 0.9 0.9 0.7 0.6 0.7 1.3 P1a
D1
E

E
MH = 20'-0"
D1 0.2

D116.2 0.2 0.3 0.3 0.4 0.6 0.6 0.6 0.6 0.8 1.4
19.0

D1 0.2
D1 0.2 0.2 0.2 0.3 0.4 0.5 0.5 0.7 1.2
18.9 16.4

D1 0.1
D1
0.2 0.2 0.3 0.4 0.4 0.5 0.5 0.9 1.6
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

18.7 16.6
D1
0.1
PROJECT STARBOARD
IDD PACKAGE
0.4 0.4 0.5 0.7 0.7 0.6 0.6 0.8 1.6
D1
18.6 16.8
D

D
0.1
D1 Luminaire Schedule
18.5 17.1
8.7 0.7 0.6 0.9 1.1 1.1 0.9 0.8 0.9 1.4 P1a Description Tag LLF Luminaire Luminaire Label
D1 MH = 20'-0" Lumens Watts
0.1
D1 4IN CANOPY DOWNLIGHT D1 0.900 2299 33.1 A4-RM_NCXXX-35S-XXX_A4-2790-X
9.1 0.8 0.9 1.3 1.6 1.7 1.3 1.0 1.1 1.7 40IN BOLLARD WITH TYPE 3 OPTIC B1 0.900 464 11 ABB-B1-LED-D1-A
18.3 D1
17.2
FULL CUT-OFF POST TOP - 13FT POLE P1B 0.900 2151 24 ARB-B1-LED-D1-T3-7030
D1 0.1
FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030
D1 9.4 0.7 0.8 0.8
P1a 1.0 1.4 1.2 1.5
FULL CUT-OFF POST TOP - 20FT POLE P1A 0.900 4197 48 ARB-B2-LED-D1-T3-7030 - B2
18.1 MH = 20'-0" 0.2 FULL CUT- OFF DECORATIVE BOLLARD B2 0.900 39 8.96 Cornet B-27 3400240027
D1 FLOODLIGHT LG W/ SNOOT - FLOOD OPTIC W/ LINEAR SPREAD F2A 0.900 4104 50 LBL-120-27K-FL-XX-XX-LSL 7007 SeaWorld Dr, Orlando, FL 32821
D1 0.2 FLOODLIGHT LG W/ SNOOT - MEDIUM OPTIC F2B 0.900 3901 50 LBL-120-27K-M-XX-XX-SN
3.5 18.1
9.7 0.6 1.0 1.5 FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - HIGH OUTPUT F1J 0.900 12881 200 LBX HO-120-27K-FL-XX-XX-SN ♦
C

C
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

D1 0.3 FLOODLIGHT XL W/ SNOOT W/ LINEAR SPREAD - HIGH OUTPUT F1G 0.900 16818 200 LBX HO-120-27K-M-XX-XX-LSL

1.0
0.6 FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - HIGH OUTPUT F1H 0.900 15155 200 LBX HO-120-27K-M-XX-XX-SN SEAWORLD
D1 0.6 1.0 FLOODLIGHT XL W/ SNOOT - NARROW FLOOD OPTIC - HIGH OUTPUT F1F 0.900 17823 200 LBX HO-120-27K-NF-XX-XX-SN
11.5 19.5 17.8 3.5
D1 FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - REGULAR OUTPUT F1B 0.900 10074 140 LBX RO-120-27K-FL-XX-XX-SN
P1a
SITE PHOTOMETRICS
1.4 FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - REGULAR OUTPUT F1A 0.900 12977 140 LBX RO-120-27K-M-XX-XX-LSL
D1 MH = 20'-0" FLOODLIGHT XL W/ SNOOT - WIDE FLOOD OPTIC - REGULAR OUTPUT F1C 0.900 13585 140 LBX RO-120-27K-WFL-XX-XX
D1 0.5 0.9
2.7 17.6 20.5 19.5 12.0 UNDERBENCH LINEAR ACCENT LIGHT N1A 0.900 163 1.68 SW24-1_5-DRY-27
D1
D1

D1
1.3
AREA 06
SHEET NUMBER: LD9.56 - SITE PHOTOMETRICS AREA 06

0.6 1.1
D1 2.9 17.6 20.6 20.5
D1 17.8

D1
D1
D1
1.2
CALCULATION SUMMARY - SITE
D1 0.8 1.5
10.8 19.3 20.6 20.5 18.1
B

B
D1 D1 AREA AVG MAX MIN AVG / MIN
D1 D1
1.1

D1 0.7 1.7 ROADS 1.1 3.0 0.20 5.5


2.2 17.1 D1 20.6 20.7 20.4 17.8
D1 A. Ebben USS-23002562-00
D1 D1 1.2 PATHS 4.32 29.60 0.20 21.6 Principal-in-Charge Project No.
D1 D1
2.4
D1
17.1 20.2 20.1 19.2 D1 9.6
0.6 1.3
POOLS 9.58 49.9 3 3.19 20.8 J. Baker 11/20/23
11/10/23
D1 P1a Project Manager Date
1.4
D1 D1
11/10/2023 6:56:16 PM

D1 MH = 20'-0" ZERO ENTRY 14.24 49.9 6.3 2.6


D1 0.4 0.6 L. Dixon
10.1 17.7 11.1 9.7 16.2 4.2
D1 SCOPE BOUNDARY 0.36 1.60 0.00 N/A Designer
D1 D1 1.4
D1
L. Fordyce
PORTE COCHERE 13.80 21.4 0.3 46.00
1.8 15.5 D110.7 2.1 2.1 14.7 4.2 D1 0.6 0.9
Drafter
LD9.56
A

A
D1 1.2
D1
D1
15.0D1
0.9 1.3
2.0 4.6 0.3 1.7 14.1
1.1
1" = 20'-0"
1 / LD9.59
D1
D1 1.1 Drawing No.
9.5 17.4 4.7 0.3 1.1 6.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

- / ---

CALCULATION SUMMARY - SITE BUILDINGS • EARTH & ENVIRONMENT • ENERGY


AREA AVG MAX MIN AVG / MIN INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY

ROADS 1.1 3.0 0.20 5.5


L

L
PATHS 4.32 29.60 0.20 21.6

POOLS 9.58 49.9 3 3.19 20.8

ZERO ENTRY 14.24 49.9 6.3 2.6

SCOPE BOUNDARY 0.36 1.60 0.00 N/A

PORTE COCHERE 13.80 21.4 0.3 46.00

SCOPE DOCUMENTS
K

K
Luminaire Schedule
Description Tag LLF Luminaire Luminaire Label The Contract Documents Issued for [Conceptual Design, Schematic
Lumens Watts
Design, Design Development, Partial Construction Documents or Other
4IN CANOPY DOWNLIGHT D1 0.900 2299 33.1 A4-RM_NCXXX-35S-XXX_A4-2790-X
Issuance up to Issued for Construction] are intended to be at that level of
40IN BOLLARD WITH TYPE 3 OPTIC B1 0.900 464 11 ABB-B1-LED-D1-A
development and as such, may be neither complete nor coordinated. The
FULL CUT-OFF POST TOP - 13FT POLE P1B 0.900 2151 24 ARB-B1-LED-D1-T3-7030
[Construction Manager, Contractor, Design/Builder] is responsible for
FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030
FULL CUT-OFF POST TOP - 20FT POLE P1A 0.900 4197 48 ARB-B2-LED-D1-T3-7030 - B2 complete and coordinated pricing [and execution] of the Work, and shall
FULL CUT- OFF DECORATIVE BOLLARD B2 0.900 39 8.96 Cornet B-27 3400240027 include items necessary for the proper execution and completion of the
FLOODLIGHT LG W/ SNOOT - FLOOD OPTIC W/ LINEAR SPREAD F2A 0.900 4104 50 LBL-120-27K-FL-XX-XX-LSL Work, as shown, specified, reasonably inferred or required for a complete
FLOODLIGHT LG W/ SNOOT - MEDIUM OPTIC F2B 0.900 3901 50 LBL-120-27K-M-XX-XX-SN Project. For Work of delegated designs; systems, assemblies,
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - HIGH OUTPUT F1J 0.900 12881 200 LBX HO-120-27K-FL-XX-XX-SN components and materials shall comply with national, state and local code
FLOODLIGHT XL W/ SNOOT W/ LINEAR SPREAD - HIGH OUTPUT F1G 0.900 16818 200 LBX HO-120-27K-M-XX-XX-LSL requirements. The [Construction Manager, Contractor, Design/Builder]
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - HIGH OUTPUT F1H 0.900 15155 200 LBX HO-120-27K-M-XX-XX-SN shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
FLOODLIGHT XL W/ SNOOT - NARROW FLOOD OPTIC - HIGH OUTPUT F1F 0.900 17823 200 LBX HO-120-27K-NF-XX-XX-SN omissions, inconsistencies or errors in the Contract Documents.
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - REGULAR OUTPUT F1B 0.900 10074 140 LBX RO-120-27K-FL-XX-XX-SN
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - REGULAR OUTPUT F1A 0.900 12977 140 LBX RO-120-27K-M-XX-XX-LSL
FLOODLIGHT XL W/ SNOOT - WIDE FLOOD OPTIC - REGULAR OUTPUT F1C 0.900 13585 140 LBX RO-120-27K-WFL-XX-XX
UNDERBENCH LINEAR ACCENT LIGHT N1A 0.900 163 1.68 SW24-1_5-DRY-27

ISSUANCES
ISSUANCES
No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
01 IDD
1 IDD Submission
IDD
IssueSubmittal
for IDD
Package 11/20/23
11/20/2023
11/20/2023
11/22/23
H

H
G

G
1 / LD9.58
F

F
0.3 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.3 0.3 0.4
0.3 0.7 1.1 0.9 0.6
0.1
E

E
1.3 0.8 0.5

0.1

1.8 1.0 0.6 0.4 0.5 0.6 0.8 1.0 1.0 0.9 0.9 1.0 1.2 1.2 1.0 1.0 1.1
P1a
0.1 MH = 20'-0"

1.6 1.0 0.7 0.6 0.7 0.8 1.0 1.3 1.8 1.7 1.4 1.4 1.6 2.0 1.9 1.6 1.5 1.7

0.1
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

1.2 0.9 0.7 0.8 0.9 1.1 1.2 1.5 1.8 1.9 1.8 1.8 1.7 1.7 1.4 1.5 1.8 1.6 1.5

0.2 P1a
P1a
MH = 20'-0" PROJECT STARBOARD
IDD PACKAGE
MH = 20'-0"
D

D
1.0 0.8 0.9 1.1 1.4 1.6 1.6 1.4 1.1

0.2

1.0 0.9 1.0 1.4 2.0 1.7 1.2

0.2 P1a
MH = 20'-0"
1.2 1.1 1.2 1.6 1.5 0.8

0.2

1.6 1.3 1.3 1.5 1.1


7007 SeaWorld Dr, Orlando, FL 32821
0.2

C

C
2.0 1.4 1.3 1.3 1.1
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

0.2
SEAWORLD
P1a
1.9 MH 1.4
= 20'-0" 1.3 1.4 1.4

0.2
SITE PHOTOMETRICS
1.7 1.5 1.3 1.3 1.7 1.4

0.3
P1a
MH = 20'-0"
AREA 07
SHEET NUMBER: LD9.57 - SITE PHOTOMETRICS AREA 07

1.6 1.3 1.1 1.3 1.9 1.3

0.3
B

B
1.6 1.2 0.9 1.0 1.4 1.4

0.3

1.8 1.2 0.8 0.8 0.9 1.0


A. Ebben USS-23002562-00
Principal-in-Charge Project No.
0.3
J. Baker 11/20/23
11/10/23
1.6 1.8 1.1 0.7 0.5 0.6 0.6 0.5
Project Manager Date
11/10/2023 6:56:18 PM

0.5
P1a L. Dixon
1.5 1.1 MH = 0.8
20'-0" 0.5 0.4 0.4 0.4 0.3 0.2 P1a Designer
MH = 20'-0"
0.8
0.0 0.0 0.0 0.0 0.0 0.0 L. Fordyce
LD9.57
0.0 0.0 0.0
0.1 0.0 0.0
0.2 0.1 Drafter
A

A
0.2 0.2 0.2
0.6 0.4 0.3
0.6 0.8 0.7

1" = 20'-0"

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 0.2 0.2 0.2 0.2 8
0.2 0.4 0.3 0.2 0.2 0.2 9
0.2 1.3 10 11 12 13 14 15
0.0 B2 B2
B2 D1
L1 0.2 0.2 1.1 0.2 0.3 0.2 0.2 0.8 B20.2
1 / LD9.55 B2
B2 D1 D1
0.2 D1
0.0 L1
L1 L1 D1
D1 D1
L1 D1
0.0 D1
D1
BUILDINGS • EARTH & ENVIRONMENT • ENERGY
0.0 INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
L

L
0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0

0.0

0.0

0.0 SCOPE DOCUMENTS


K

K
1.4 1.5

The Contract Documents Issued for [Conceptual Design, Schematic


Design, Design Development, Partial Construction Documents or Other
0.0 0.5 P1a
1.3 1.8 1.0
MH = 20'-0" Issuance up to Issued for Construction] are intended to be at that level of
development and as such, may be neither complete nor coordinated. The
[Construction Manager, Contractor, Design/Builder] is responsible for
0.0 0.4 0.6 1.4 1.3 complete and coordinated pricing [and execution] of the Work, and shall
include items necessary for the proper execution and completion of the
Work, as shown, specified, reasonably inferred or required for a complete
0.0 0.8 0.6 0.8 1.2 Project. For Work of delegated designs; systems, assemblies,
components and materials shall comply with national, state and local code
requirements. The [Construction Manager, Contractor, Design/Builder]
0.0 shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
1.6 1.2 0.8 0.7
omissions, inconsistencies or errors in the Contract Documents.

1 / LD9.59
0.0 0.8 1.9 1.4 0.9

P1a
0.0 MH = 20'-0"
0.6 1.0 1.7 1.2
ISSUANCES
ISSUANCES
No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
0.0 1.0 1.3 1.3 01 IDD
1 IDD Submission
IDD
IssueSubmittal
for IDD
Package 11/20/23
11/20/2023
11/20/2023
11/22/23

0.0
H

H
1.0 1.4 1.3 0.5

P1a
0.0 0.8 MH = 20'-0"
1.8 1.5 0.8 0.8

0.0 0.7 1.9 1.5 0.5 0.6 1.1 1.2

0.0 1.7 1.3 1.0 0.8 0.7 0.5 0.5 0.9 1.7

0.0
G

G
1.3 1.0 1.0 1.1 1.0 0.7 0.6
1.5

0.0 1.1 0.8 0.8 1.3 1.4 P1a


0.9 1.6
MH = 20'-0"
1.3
0.1 1.0 1.1 0.8 0.7 1.1 1.8
1.0

0.1 0.6 1.2 1.3 1.0 0.8 1.0

1.2
1 / LD9.57

P1a
0.1 MH
1.2 = 20'-0"
F

F
0.8 0.7 0.5 0.5 0.9 1.7 1.5

1.3

0.2 0.4 0.7 1.3 1.0 0.7 0.6 0.9 1.1

1.2

1.5
0.4 0.8 1.0 0.7 0.5 0.6 1.5 1.5 P1a 0.9
MH = 20'-0" 1.5

0.9
0.6 0.9 0.9 0.6 0.5 0.8 1.5 1.0 0.7 0.7
0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.6
0.8

P1a 1.0
MH1.4= 20'-0"
E

E
0.8 0.7 0.7 0.8 0.9 0.9 0.8 0.8 1.1 1.3 1.4 1.0 0.6 0.4 0.6 1.0 1.0 0.7 0.5 0.5 1.1 1.4 0.9 0.6 0.7 1.8
1.2

1.3

1.0 1.1 1.2 1.3 1.1 1.1 1.2 1.4 1.4 1.2 1.2 1.3 1.6 1.5 1.3 1.3 1.5 1.7 1.7 1.5 0.9 0.5 0.5 0.9 1.5 1.0 0.6 0.5 0.8 P1a
1.7 1.1
1.0
MH = 20'-0"
0.8
P1a
1.3 1.9 1.1 0.7 0.5 0.9 1.8 = 20'-0"
1.1 0.7 0.9
1.5 1.7 2.0 2.0 1.7 1.6 1.8 2.0 1.9 1.8 1.7 1.9 1.9 1.9 1.8 1.7 2.1 1.6 P1a MH 1.1
MH = 20'-0" 1.2
0.8
P1a 0.8
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

1.6 1.5 1.2 1.3 1.8 1.7 1.5 P1a MH = 20'-0" 1.0
P1a
MH = 20'-0"
MH = 20'-0"
0.5
0.8
1.2
PROJECT STARBOARD
IDD PACKAGE
0.6
D

D
0.8
1.0
0.7
0.5

1.4 1.1 0.7 0.5 Luminaire Schedule


1.2
Description Tag LLF Luminaire Luminaire Label
0.8 Lumens Watts
4IN CANOPY DOWNLIGHT D1 0.900 2299 33.1 A4-RM_NCXXX-35S-XXX_A4-2790-X
40IN BOLLARD WITH TYPE 3 OPTIC B1 0.900 464 11 ABB-B1-LED-D1-A
0.5
FULL CUT-OFF POST TOP - 13FT POLE P1B 0.900 2151 24 ARB-B1-LED-D1-T3-7030
FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030
FULL CUT-OFF POST TOP - 20FT POLE
FULL CUT- OFF DECORATIVE BOLLARD
P1A
B2
0.900
0.900
4197
39
48
8.96
ARB-B2-LED-D1-T3-7030 - B2
Cornet B-27 3400240027
7007 SeaWorld Dr, Orlando, FL 32821
0.3
FLOODLIGHT LG W/ SNOOT - FLOOD OPTIC W/ LINEAR SPREAD F2A 0.900 4104 50 LBL-120-27K-FL-XX-XX-LSL ♦
C

C
FLOODLIGHT LG W/ SNOOT - MEDIUM OPTIC F2B 0.900 3901 50 LBL-120-27K-M-XX-XX-SN
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

0.2
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - HIGH OUTPUT
FLOODLIGHT XL W/ SNOOT W/ LINEAR SPREAD - HIGH OUTPUT
F1J
F1G
0.900
0.900
12881
16818
200
200
LBX HO-120-27K-FL-XX-XX-SN
LBX HO-120-27K-M-XX-XX-LSL
SEAWORLD
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - HIGH OUTPUT F1H 0.900 15155 200 LBX HO-120-27K-M-XX-XX-SN
FLOODLIGHT XL W/ SNOOT - NARROW FLOOD OPTIC - HIGH OUTPUT F1F 0.900 17823 200 LBX HO-120-27K-NF-XX-XX-SN
0.1 FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - REGULAR OUTPUT
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - REGULAR OUTPUT
F1B
F1A
0.900
0.900
10074
12977
140
140
LBX RO-120-27K-FL-XX-XX-SN
LBX RO-120-27K-M-XX-XX-LSL
SITE PHOTOMETRICS
0.1
FLOODLIGHT XL W/ SNOOT - WIDE FLOOD OPTIC - REGULAR OUTPUT
UNDERBENCH LINEAR ACCENT LIGHT
F1C
N1A
0.900
0.900
13585
163
140
1.68
LBX RO-120-27K-WFL-XX-XX
SW24-1_5-DRY-27 AREA 08
SHEET NUMBER: LD9.58 - SITE PHOTOMETRICS AREA 08

0.0
CALCULATION SUMMARY - SITE
B

B
AREA AVG MAX MIN AVG / MIN
0.0

ROADS 1.1 3.0 0.20 5.5


A. Ebben USS-23002562-00
Principal-in-Charge Project No.
0.0 PATHS 4.32 29.60 0.20 21.6 J. Baker 11/20/23
11/10/23
POOLS 9.58 49.9 3 3.19 20.8 Project Manager Date
11/10/2023 6:56:25 PM

0.0 L. Dixon
0.0
ZERO ENTRY 14.24 49.9 6.3 2.6
0.0 0.0 0.0 Designer
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 SCOPE BOUNDARY 0.36 1.60 0.00 N/A L. Fordyce
Drafter
LD9.58
A

A
PORTE COCHERE 13.80 21.4 0.3 46.00

1" = 20'-0"

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1.8 15.5
D110.7 2.1 2.1 14.7
D1
4.2
1.2
D1
D1 1 / LD9.56
15.0D1
0.9 1.3
2.0 4.6 0.3 1.7 14.1
1.1

D1
D1 1.1
9.5 17.4 4.7 0.3 1.1 6.0
1.1

D1
D1 CALCULATION SUMMARY - SITE BUILDINGS • EARTH & ENVIRONMENT • ENERGY
0.4 0.9
16.0 19.5 5.2 1.4 8.7 3.3 D1 1.3 INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
D1 D1 AREA AVG MAX MIN AVG / MIN
D1 P1a
MH = 20'-0" ROADS 1.1 3.0 0.20 5.5
D1 0.5 0.9
D1
L

L
1.7 16.1 19.8 6.5 9.9 D117.4 1.4
D1 PATHS 4.32 29.60 0.20 21.6
D1 D1
D1
D1 9.1 18.7 20.6 14.9 18.8
D1 19.6
0.8
1.2 POOLS 9.58 49.9 3 3.19 20.8
D1
1 / LD9.55

D1 D1
D1 ZERO ENTRY 14.24 49.9 6.3 2.6
D1
D1 18.5 21.2 21.3 D1 21.1 21.0 19.5
0.8 1.3
1.1
D1 SCOPE BOUNDARY 0.36 1.60 0.00 N/A
D1
D1 D1
D1 D1 0.8 1.7 PORTE COCHERE 13.80 21.4 0.3 46.00
1.1
15.3 21.2 D1 21.4 21.4 21.3 20.2
D1
D1 D1
D1
D1 0.4 0.8 1.2 SCOPE DOCUMENTS
D1
K

K
18.4 21.1 21.0 20.9 20.3
D1 D1 P1a Luminaire Schedule
D1 MH = 20'-0" Description Tag LLF Luminaire Luminaire Label The Contract Documents Issued for [Conceptual Design, Schematic
D1 0.6 0.9 1.3 Lumens Watts Design, Design Development, Partial Construction Documents or Other
D1 20.7 13.8 10.1 9.7 8.9 4IN CANOPY DOWNLIGHT D1 0.900 2299 33.1 A4-RM_NCXXX-35S-XXX_A4-2790-X Issuance up to Issued for Construction] are intended to be at that level of
40IN BOLLARD WITH TYPE 3 OPTIC B1 0.900 464 11 ABB-B1-LED-D1-A development and as such, may be neither complete nor coordinated. The
D1 FULL CUT-OFF POST TOP - 13FT POLE P1B 0.900 2151 24 ARB-B1-LED-D1-T3-7030
D1 0.9 0.7 1.0 1.3
1.2 [Construction Manager, Contractor, Design/Builder] is responsible for
14.4 13.8 4.1 FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030 complete and coordinated pricing [and execution] of the Work, and shall
FULL CUT-OFF POST TOP - 20FT POLE P1A 0.900 4197 48 ARB-B2-LED-D1-T3-7030 - B2 include items necessary for the proper execution and completion of the
D1 FULL CUT- OFF DECORATIVE BOLLARD B2 0.900 39 8.96 Cornet B-27 3400240027 Work, as shown, specified, reasonably inferred or required for a complete
1.1
7.7 4.6
1.8 0.9 0.7 0.6 1.4 FLOODLIGHT LG W/ SNOOT - FLOOD OPTIC W/ LINEAR SPREAD F2A 0.900 4104 50 LBL-120-27K-FL-XX-XX-LSL Project. For Work of delegated designs; systems, assemblies,
FLOODLIGHT LG W/ SNOOT - MEDIUM OPTIC F2B 0.900 3901 50 LBL-120-27K-M-XX-XX-SN components and materials shall comply with national, state and local code
D1 FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - HIGH OUTPUT F1J 0.900 12881 200 LBX HO-120-27K-FL-XX-XX-SN requirements. The [Construction Manager, Contractor, Design/Builder]
1.2
FLOODLIGHT XL W/ SNOOT W/ LINEAR SPREAD - HIGH OUTPUT F1G 0.900 16818 200 LBX HO-120-27K-M-XX-XX-LSL
1.9 1.4 1.3 1.1 0.5 1.4 shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - HIGH OUTPUT F1H 0.900 15155 200 LBX HO-120-27K-M-XX-XX-SN
D1 P1a omissions, inconsistencies or errors in the Contract Documents.
1.4 FLOODLIGHT XL W/ SNOOT - NARROW FLOOD OPTIC - HIGH OUTPUT F1F 0.900 17823 200 LBX HO-120-27K-NF-XX-XX-SN
MH = 20'-0"
FLOODLIGHT XL W/ SNOOT - FLOOD OPTIC - REGULAR OUTPUT F1B 0.900 10074 140 LBX RO-120-27K-FL-XX-XX-SN
1.2 P1a 2.1 1.6 1.6 1.5 0.4 0.6
P1a MH = 20'-0" FLOODLIGHT XL W/ SNOOT - MEDIUM OPTIC - REGULAR OUTPUT F1A 0.900 12977 140 LBX RO-120-27K-M-XX-XX-LSL
1.5 FLOODLIGHT XL W/ SNOOT - WIDE FLOOD OPTIC - REGULAR OUTPUT F1C 0.900 13585 140 LBX RO-120-27K-WFL-XX-XX
UNDERBENCH LINEAR ACCENT LIGHT N1A 0.900 163 1.68 SW24-1_5-DRY-27
1.9 1.7 1.9 1.9 0.6 0.6 0.7
1.4 ISSUANCES
ISSUANCES
P1a No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
01 IDD
IDD Submission
IDD Submittal 11/20/23
11/20/2023
1.5 1.6 1.6 1.9 1.2 1.0 0.9
1.1 1 Issue for IDD
Package 11/20/2023
11/22/23
P1a
MH = 20'-0"
1.2 1.3 1.4 1.0 0.7 0.9 1.5 1.3 1.0
H

H
1.1
0.8 0.9 1.0 1.0 0.9 0.9 1.6

P1a
MH = 20'-0" 1.3
1.5 0.6 0.8 1.0 1.1 1.1

1.5

1.8 1.0 0.5 0.6 1.1 1.5 1.4

1.5

1.3 0.4 0.5 0.8 1.9


G

G
1.5

P1a
MH = 20'-0"
0.5 0.5 0.5 0.8 1.5

1.3
0.7 0.8 0.7
1 / LD9.58

1.2
0.5 1.0 1.1 1.0

1.0

0.3 0.4 0.9 1.6


F

F
1.0
P1a
MH = 20'-0"
1.2
0.3 0.3 0.4 0.8

1.5

0.5 0.4 0.3 0.4


1.5

0.8 0.8 0.6 0.4 1.2

0.7

1.1 1.2
P1a
0.8
E

E
MH = 20'-0" 0.5

0.9 1.7 0.7

1.1

1.5

1.6
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

1.3 PROJECT STARBOARD


IDD PACKAGE
D

D
7007 SeaWorld Dr, Orlando, FL 32821

C

C
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

SEAWORLD

SITE PHOTOMETRICS
AREA 09
SHEET NUMBER: LD9.59 - SITE PHOTOMETRICS AREA 09

B
A. Ebben USS-23002562-00
Principal-in-Charge Project No.

J. Baker 11/20/23
11/10/23
Project Manager Date
11/10/2023 6:56:29 PM

L. Dixon
Designer

L. Fordyce
Drafter
LD9.59
A

A
1" = 20'-0"

Drawing No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOT ISSUED FOR CONSTRUCTION


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0.7
CALCULATION SUMMARY - SKYBRIDGE

MATCHLINE
1.1 1.2

1.9 1.6 1.8 1.8 AREA AVG MAX MIN AVG / MIN MAX / MIN
BUILDINGS • EARTH & ENVIRONMENT • ENERGY
P1c
1.8 2.4 2.1 2.2 1.4
P1c
SKYBRIDGE 8.36 27.30 0.40 20.90 68.25 INDUSTRIAL • INFRASTRUCTURE • SUSTAINABILITY
15' 2.3 2.6 2.2 2.4 15'

3.3 2.6 2.2 2.3


Luminaire Schedule
L

L
P1c Scene: Sky Bridge Handrails
2.7 3.2 2.6
15' Description Tag LLF Luminaire Luminaire Label
1.9 1.9 2.6 3.0 1.7 Lumens Watts
P1c FULL CUT-OFF POST TOP - 15FT POLE P1C 0.900 1930 21 ARB-B1-LED-D1-T5-8030
2.1 2.2 2.4 2.4 2.5 2.2 2.1 2.2 2.4 1.8 15'
UNDERBENCH LINEAR ACCENT LIGHT N1A 0.900 163 1.68 SW24-1_5-DRY-27
P1c
P1c 2.3 2.5 2.1 1.8
15'2.5 2.9 2.6 2.6 2.4 1.9
15' P1c
1.9 2.7 3.0 2.5 2.5 2.9 2.0 1.7
15'
2.8 3.4 2.7 2.9 2.7 1.6 2.2 1.6

2.0 2.4 3.0 2.6 2.4 2.7 2.5 2.4 2.1 2.2 1.9 1.3
P1c P1c N1a
15' 15'
LED LED LED LED LED LED

1.1 1.7 2.1 1.8 1.9 2.3 1.9 1.8 2.0 2.5 2.3 1.7 2.5 2.8 2.5 2.0 2.2 2.2
LED LED LED LED

27.2 27.2 SCOPE DOCUMENTS


K

K
1.5 1.9 2.2 2.3 2.2 2.1 2.0 2.1 2.1 2.3 2.5 2.3 2.4 2.5 2.5 3.2 3.0 2.3 2.2 2.3 1.2 1.4 3.2 8.5 10.4 10.6
N1a10.7 The Contract Documents Issued for [Conceptual Design, Schematic
P1c LED LED LED LED LED LED LED LED
Design, Design Development, Partial Construction Documents or Other
1.5 1.8 2.0 2.3 2.0 1.9 2.1 2.3 2.2 2.4 2.3 2.2 2.3 2.2 2.2 2.6 3.2 2.4 2.5 1.9 2.2 15' 1.7 2.1 1.8 2.0
P1c Issuance up to Issued for Construction] are intended to be at that level of
1.6 1.2 1.2 1.9 2.0 1.9 2.2 1.6 1.5 1.9 2.5 2.2 2.1 2.1 2.2 2.6 2.5 2.4 2.1 15' 2.2 2.4 2.6 1.8 1.5 1.6 1.9 2.0 development and as such, may be neither complete nor coordinated. The
P1c [Construction Manager, Contractor, Design/Builder] is responsible for
15' 2.7 2.6 2.4 2.4 2.4 2.5 2.3 1.8 2.2 2.0 1.5 2.8 2.3 2.1 2.8 2.6 1.7 1.9 1.9
P1c complete and coordinated pricing [and execution] of the Work, and shall
15' include items necessary for the proper execution and completion of the
P1c
1.6 1.7 2.4 2.3 2.3 2.1 2.0 1.9 2.2 2.7 2.6 1.7 2.8 2.8 2.0 1.4
P1c 15'
Work, as shown, specified, reasonably inferred or required for a complete
2.0 1.9 1.6 1.8 2.1 2.3
15' 2.9 2.5 1.8 2.2 1.4 Project. For Work of delegated designs; systems, assemblies,
P1c components and materials shall comply with national, state and local code
15'
2.7 2.5 1.8 P1c 2.2 2.3
requirements. The [Construction Manager, Contractor, Design/Builder]
15'
2.4 2.5 2.5 2.2 shall inform the Owner and Architect, in timely fashion, of any discovered
J

J
omissions, inconsistencies or errors in the Contract Documents.
2.3 2.7 1.9 2.2

2.5 2.5 P1c 1.8 2.0


15'
P1c 2.0 2.7 2.3 1.7

15' 1.6 2.7 2.0 1.4


ISSUANCES
ISSUANCES
2.7 2.7 P1c 1.8 1.4
15' No.
No. Drawing Issue
Drawing Issue Description
Description Date
Date
2.1 2.3 1.6 2.1 1.9
01 IDD
1 IDD Submission
IDD
IssueSubmittal
for IDD
Package 11/20/23
11/20/2023
11/20/2023
11/22/23
1.9 1.9 1.9 2.3 2.4 2.3 1.7

1.7 1.9 2.2 1.7 P1c


H

H
15'

LED LED
N1a
LED LED LED LED
N1a
LED LED LED LED

27.2 27.2 27.2 27.1 26.8


LE D
LE D

3.2 8.5 10.4 10.6


N1a10.7 10.7 7.7 16.2
LE D

LED LED LED LED LED LED LED LED


LE D

25.0 8.5
LE D
LE D

N1a
G

G
LE D
LE D

LE D
LE D

8.2 26.7
LE D
LE D

LE D

N1a
LE D

15.1 16.0
LE D
LE D
LE D

26.8 9.1
LE D
LE D

LE D

9.9 26.8
LE D
LE D
LE D
LE D

19.3 16.3
LE D
LE D

N1a
LE D
LE D

9.9
LE D
LE D

LE D
LE D

N1a
LE D

12.3 27.1
LE D

LE D
LE D

N1a
LE D

23.8 16.9 LED


LED
LE D
F

F
LED
N1a
LE D

LED
LED
LED
15.5 14.1 17.6 24.8 27.3 LED
LED

LED
LED N1a
LED
LED
LED
LED
N1a
LED
LE LE
D LE
18.8 D 27.2 24.5 16.4 12.5 13.8 19.7 26.7 25.1D LED
LED
LED
LED
N1a
LED
LED
LED
LED
N1a
LED
LED LED
LED LED
17.0 26.1 25.4 17.1 11.8 11.2 15.1 22.6 27.2
LED
LED
LED
N1a
LED
LED
LED
LED
N1a
LED
LED LED
LED LED

24.8 26.3
LED
LED
LED
N1a11.6
18.1
LED
9.7 11.6 17.5 25.3 26.0 LED
LED
LED
N1a
LED
LED LED
LED LED

23.2 LED
26.9
LED N1a 11.9
LED 19.3
LED
8.8 9.2 13.1 20.5 26.9

LE
LED

D
LED

N1a
LE
D
LED
LED
21.5 27.0LED 20.8 12.3 6.6 20.1

LE
LED

D
LED

LE
N1a
D
LE
D
LE

20.9 6.6 24.2

LE
D

D
LE

LE
D

D
LE
LE

N1a
D
D

19.0 7.3 26.7


LE
D
E

E
LE
D

LE
LE

D
17.3 8.5
D

LE
D
LE
N1a
D
LE
LE

15.7 10.2
D
D

LE
LE

D
D

LE
LE

N1a14.4
D
D

12.7
LE
D
LE
D

LE
LE

D
13.3 16.1
D

LE
D
LE N1a
D
LE
12.5 20.3
LE

D
D

LE
MATCHLINE

LE

D
D

LE
LE

LED
D LED LED
LED
LELE
N1a D
D LED
D LE D LE
D

D LE D LE
D LD
D LE
12.1 LDELE ELDE
LE

ELDE LDE
Autodesk Docs://20230011 SeaWorld Resort Hotel/23002562_SeaWorld Resort Hotel_Lighting.rvt

ELD LDE
D

ELD LDE
LDE
ELD
LE

LD LDE
LDE LDE

PROJECT STARBOARD
D

LDE LDE
LE
LE

D
D

26.2 8.7 5.6 4.3 4.8 12.3


D

LE
LE
D

LDE
LDE

LDE
LDE

LDE
LDE

LDE
LDE

IDD PACKAGE
LDE
LDE

22.0 6.5 1.3 0.9 0.9 1.6 4.6

LDE
LDE

LDE
ELDE

LDELD
D

D
D LD
D LE

ELE
D LE
D LE

D LE
LELE

22.4 2.6 0.7 0.4 0.4 0.7 2.0 18.7

D LED
LED

D LED
LED
LED
LED

LED
LEDLED

LED
15.3 1.8 0.6 0.4 0.4 0.6 1.7 12.3
N1a

LED
LED
LEL

LED
DED

DED
LELDE

EL
21.9 2.8 0.9 0.5 0.5 0.9 3.3 25.6

LELD
LDELD

DED
ELDE

L
LDE
D
LE

LDE
LDE

LDE
18.3 13.6 2.6 1.0 1.2 2.5 11.5 13.8
D
LE

LDE
LDE

LDE
LDE

LDE
LDE

LE
LE

D
D

LDE LDE
LDE LDE
LDE LDE
LDE15.7
LDE 16.0 3.1 LE
D
LDE 6.4 20.0
LDE LDE
LDEL LDE
LED

DELD E
EL LDELD
LED

DED LELDE
LED
LED

LED
LEL LED
DED
L ED LED
LED LED LED
LED
L ED
LED

27.0 8.7
LED
LED

LED
LED
LED

LED

7007 SeaWorld Dr, Orlando, FL 32821


L ED

LED
LED

LED
LED

25.8 9.4
LED
LED

LED
LED

LED
LED

LED


LED

LED
LED

24.7 8.4
LED
LED

LED
LED
C

C
LED
LED
PROJECT NUMBER: USS-23002562-00 PROJECT NAME: PROJECT STARBOARD

LED
LED

SEAWORLD
LED
LED

23.3 7.8
LELE
LED

D LE
LELE

D LE
D LE

D LE
D LE

D LE
D LE

7.7
D LE
D LE

D LE
D LE

D LE
D LE

D LE
D LE

D LE
D LE

10.7
D LE

SITE PHOTOMETRICS
D LE

D LE
D LE

D LD
D LE
D LE

EL
DELD
D LE

20.2 12.6
D LD

ELE
D LD
ED
LELD

ELDE

BRIDGE
ELE

LDELD
D LD

N1a
ELDE

26.8 8.5
ELDE

N1a

You might also like