amper R 139,8 A Beban 93,20 %
S 107,9 A Beban 71,93 %
T 120,9 A Beban 80,60 %
page # 1
THERMOGRAPHIC REPORT
Client : Total Biah Bintaro
Problem :
IDENTIFICATION
Location : Bintaro
Equipment : Tufur dari KWH meter ( Outgoing ) ke panel COS
PROBLEM DECRIPTION
Panas Yng cukup berlebih , pada salah satu Phase R dan S
Penyambungan daya 105 KVA ( 150 A x 230 V )
Comments
Tegangan Jala jala Normal 223/392 V V drop 3,04 %
225/396 V V drop 2,17 %
224/395 V V drop 2,61 %
Cukup baik
page # 2
THERMOGRAPHIC REPORT
Client : Total Biah Bintaro
Problem :
IDENTIFICATION
Location : Bintaro
Equipment : Tufur PLN dan COS
PROBLEM DECRIPTION
Comments
page # 3
THERMOGRAPHIC REPORT
Client : Total Biah Bintaro
Problem : Kabel In -Out KWH
IDENTIFICATION
Location : Bintaro
Equipment : Tufur PLN dan COS
PROBLEM DECRIPTION
Incloming
PLN
Outgoung
COS
Distance Rate Load Mess Load % Load
Comments
Tufur PLN temperatur Baik dan Drop Voltage juga baik
Ada masalah pada sisi Outgoing kabel sudah hangat dan tidak Balance
page # 4
THERMOGRAPHIC REPORT
Client : Total Biah Bintaro
Problem : Panel SDB
IDENTIFICATION
Location : Bintaro
Equipment : Tufur PLN dan COS
PROBLEM DECRIPTION
Comments
Kabel Panel tufur dari COS ke beban sudah hangat perlu ada perubahan soize kabel