You are on page 1of 4

NUMBER E18-E01

REV. NO. 1
ENGINEERING STANDARD DATE JUN 2001
PAGE 1 OF 4

Checklist: Installation Requirements


for Electrical Equipment

This document is issued by Engineering Standards Section, SABIC R&D Complex, PO Box 42503, Riyadh 11551, Kingdom of Saudi Arabia.
The information contained in this document is the confidential property of SABIC. It can not be disclosed, copied or used for any purpose
without prior approval from SABIC. If you are not authorized to possess this document, please destroy it immediately.
NUMBER E18-E01
Checklist: Installation Requirements REV. NO. 1
for Electrical Equipment DATE JUN 2001
ENGINEERING STANDARD PAGE 2 OF 4

CONTENTS

1. SCOPE ................................................................................................ 3
2. REFERENCES 3
3. GENERAL 3
4. CHECKLISTS ...................................................................................... 3
4.1 Switchgear 3
4.2 Transformers 4
4.3 Bus Duct ......................................................................................... 4
4.4 Neutral Grounding Resistors 4
4.5 Motor Control Centers 4
4.6 Motors ............................................................................................ 4
4.7 Batteries and Chargers 4
4.8 Standby Generator 4
4.9 Adjustable Frequency Drives ......................................................... 4
4.10 UPS Equipment 4
NUMBER E18-E01
Checklist: Installation Requirements REV. NO. 1
for Electrical Equipment DATE JUN 2001
ENGINEERING STANDARD
PAGE 3 OF 4

1. Scope
This standard provides checklists to be used for the commissioning of new electrical equipment and
defines the methodology for use of these checklists.

2. References
Reference is made in this standard to the following documents. The latest issues, amendments, and
supplements to these documents shall apply unless otherwise indicated.
SABIC Engineering Standards (SES)
E03-T01 Inspection and Testing of Protective Relays
E04-T01 Transformers Testing Criteria
E18-X01B Transformer Installation Checklist
E06-T01 Inspection and Testing of AC Induction Motors
E06-T02 Inspection and Testing of Synchronous Motors
E18-X01F Motor Installation Checklist
E07-T01 Generators, Inspection and Testing
E18-X01H Standby Generator Installation Checklist
E08-T01 Inspection and Testing of Low and MV Switchgear
E18-X01A Switchgear Installation Checklist
E09-T01 Motor Control Center, Inspection and Testing 600 volt
E09-T02 Motor Control Center, Inspection and Testing 5000 volt
E18-X01E Motor Control Center Installation Checklist
E13-T01 UPS Inspection and Testing
E18-X01J UPS Installation Checklist
E18-X01C Bus Duct Installation Checklist
E18-X01D Neutral Grounding Resistor Installation Checklist
E18-X01I Adjustable Frequency Drive Installation Checklist
E18-X01G Batteries and Chargers Frequency Drive Installation Checklist
E12-S01 Batteries, Racks and Chargers
E25-S01 Busbars and Busducts
E10-S01 Adjustable Frequency Drives for Low Voltage Motors
E10-S02 Adjustable Frequency Drives for MV Motors
E11-S01 Low Resistance Grounding

3. General
3.1 It is the intent of this practice to provide checklists to assist field personnel in management for electrical
equipment installation. A check list is to be completed for each tagged item of equipment.
3.2 The check list serves as a ready reference for required activities and status report for each piece of
equipment.
3.3 The check list shall not be construed to replace test and inspection procedures or test and inspection
reports.
3.4 Any conflict(s) between this standard, SES and industry standards, engineering drawings, and
contract documents shall be resolved at the discretion of SABIC.

4. Checklists
4.1 Switchgear
Checklist SES E18X01A shall be completed for switchgear; test and inspection shall be completed In
accordance with SES E08T01 and E03T01.
NUMBER E18-E01
Checklist: Installation Requirements REV. NO. 1
for Electrical Equipment DATE JUN 2001
ENGINEERING STANDARD PAGE 4 OF 4

4.2 Transformers
Checklist SES E18X01B shall be completed for transformers; test and inspection shall be completed in
accordance with SES E04T01.
4.3 Bus Duct
Checklist SES E18X01C shall be completed for Bus Duct; test and inspection shall be completed in
accordance with industry standards indicated in SES E25S01.
4.4 Neutral Grounding Resistors
Checklist SES E18X01D shall be completed for Neutral Grounding Resistors; test and inspection shall be
completed in accordance with industry standards indicated in SES E11S01.
4.5 Motor Control Centers
Checklist SES E18X01E shall be completed for Motor Control Centers; test and inspection shall be
completed in accordance with E09T01 or E09T02 as applicable.
4.6 Motors
Checklist SES E18X01F shall be completed for Motors; test and inspection shall be completed in
accordance with E06T01 or E06T02 as applicable.
4.7 Batteries and Chargers
Checklist SES E18X01G shall be completed for Batteries and Chargers; test and inspection shall be
completed In accordance with industry standards indicated in SES E12S01.
4.8 Standby Generator
Checklist SES E18X01H shall be completed for Standby Generators; test and inspection shall be
completed in accordance with E07T01.
4.9 Adjustable Frequency Drives
Checklist SES E18X01I shall be completed for Batteries and Chargers; test and inspection shall be
completed In accordance with industry standards indicated in SES E10S01 or E10S02 as applicable.
4.10 UPS Equipment
Checklist SES E18X01J shall be completed for Batteries and Chargers; test and inspection shall be
completed In accordance with SES E13T01.