LATERAL ANALYSIS Figure 2

Loads:
Load Factor for Vertical Loads= 1.0
Load Factor for Lateral Loads= 1.0
Loads Supported by Pile Cap= 0 %
Shear Condition: Static

Vertical Load, Q= 400.6 -kN


Shear Load, P= 39.2 -kN
Slope Restain St= 0.00 -cm/-cm

Profile:
Pile Length, L= 19.0 -m
Top Height, H= -1.0 -m
Slope Angle, As= 0
Batter Angle, Ab= 0

Fixed Head Condition

Drilled Pile (dia <=24 in. or 61 cm)

Soil Data: Pile Data:


Depth Gamma Phi C K e50 or Dr Nspt Depth Width Area Per. I E Weight
-m -kN/m3 -kN/m2 -MN/m3 % -m -cm -cm2 -cm -cm4 -MP -kN/m
0 9.2 27.9 20 32.6 1.24 6 0.0 40 1256.6 125.7 125663.7 20683 2.963
4 9.8 13.5 23.4 49.8 1.07 7 19.0 40 1256.6 125.7 125663.7 20683 2.963
6 8.9 17.93 15.0 25.9 1.33 5
8 8.9 17.93 15.0 25.9 1.33 5
10 9.9 17.93 22.4 54.5 1.04 8
12 10.9 20 48 164.2 0.66 16
14 10.9 20 42 136.9 0.71 14
16 11.1 20 52.5 229.7 0.56 21
18 11.2 33.8 60 272.5 0.52 24
20 12.2 38.0 219 788.8 0.29 73
Single Pile Lateral Analysis:
Top Deflection, yt= 0.26700-cm
Max. Moment, M= 40.40-kN-m
Top Deflection Slope, St= 0.00000
OK! Top Deflection, 0.2670-cm is less than the Allowable Deflection= 2.50-cm

Note: If the program cannot find a result or the result exceeds the upper limit. The result will be displayed as 9999.
The Max. Moment calculated by program is an internal force from the applied load conditions. Structural engineer has to check whether
the pile has enough capacity to resist the moment with adequate factor of safety. If not, the pile may fail under the load conditions.

CivilTech GIS Bekasi 500kV


Software Borepile d40 cm gantry foundation
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

PILE DEFLECTION & FORCE vs DEPTH


Pile below Ground (NTS) Single Pile, Khead=5, Kbc=2
Water above Pile
Depth (Zp) DEFLECTION, yt -cm MOMENT -kN-m SHEAR -kN  -kN/m3  C-kN/m2 k-MN/m3e50 % Depth (Zp)
from from
Pile Top-m -0.50 0 +0.50 -50 0 +50 -50 0 +50 9.2 27.9 20 32.6 1.24 Pile Top-m
0 Silt (Phi + C) 0

2 2

9.8 13.5 23.4 49.8 1.07


yt=0 at 3.8-m Silt (Phi + C)
4 4
St=0 at 4.8-m
8.9 17.93 15.0 25.9 1.33
6 Silt (Phi + C) 6

8.9 17.93 15.0 25.9 1.33


8 Silt (Phi + C) 8

9.9 17.93 22.4 54.5 1.04


10 Silt (Phi + C) 10

10.9 20 48 164.2 0.66


12 Silt (Phi + C) 12

10.9 20 42 136.9 0.71


14 Silt (Phi + C) 14

11.1 20 52.5 229.7 0.56


16 Silt (Phi + C) 16

11.2 33.8 60 272.5 0.52


18 Silt (Phi + C) 18

Tip yt=-1.07E-14 Top yt=2.67E-1 Top Moment=-40.4 Top Shear=39.1


20 Max. yt=2.67E-1 Max. Moment=40.4 Max. Shear=39.1 E -MP=20683 20
Top St=1.13E-18 I'-cm4=125664

22 22

24 24

26 26

28 28

30 30

CivilTech GIS Bekasi 500kV