You are on page 1of 12

WELLPLAN SIMULATION

Username: edm (DAE database)

Password: Landmark1

Pre-drill analysis

Pre-req data: (to be saved in DOMC global share)

1. Well trajectory (to be import into COMPASS)

2. Wellbore Schematic

 Hole size
 Casing Scheme (with weight and type of casing)

3. Fluids Rheology

4. Pore and Fracture

5. BHA

Input Directory

1. Datum

As per well details (DFE- see no 2)

Internal
2. Wellpath (from compass)

 Project Properties
I. Latest magnetic model

II. Map Info (if not specific use generic as below)

Internal
 Site Properties
I. Location (if not specific use generic as below)

 Well Properties
I. Depth Reference (*IMPORTANT* to be used in Wellplan)

Internal
 Wellbore Properties
I. Magnetic (for anticollision)
Default as below: latest model

 Plan Design Properties

Internal
 Plan Editor
I. Copy from excel (MD, INC to AZI) by sequence to plan editor (APPLICABLE if project
team provided especially for Development well)

II. IF VERTICAL WELL (4o at 1000m and hold to TD) – to create separation between
Roadmaps FF

3. Hole Section Editor

Internal
4. String Editor

I. FOR DRILLING BHA


1. Bottom to top order
2. BIT TFA
3. REGARDLESS RSS/MUD MOTOR use Mud motor from Sperry (pressure loss included)
4. MWD that contain pressure loss
5. Drillpipe = new (Wall thickness 100%)

II. FOR CASING


1. STANDOFF DEVICES only applicable for size 13-3/8 and bigger

Internal
5. Fluid Editor

a.

Default for Seawater


b. Box = generic info for SBM

6. Subsurface Properties (define PPFG and Geothermal)

7. Rig Properties (specify surface pressure loss=100psi)

8. Operation as per module

Internal
TORQUE AND DRAG ROADMAP
-Operations Tab
a) WOB = 20 kip
b) TOB = 3000 ft-lbf
c) Tick Rotating Off Bottom

-Analysis Settings
a) Stepsize = 20m/100ft
b) Block weight = 65 kip
c) Tick Use Bending Stress Magnification, Use fluid column gradient
d) Using % of yield : 80 % (to cater New DP use in BHA)

-ROADMAP COMPUTATION
a) Copy FF = 0.10 to 0.30 and 0.30 to 0.50 for both casing and hole (Di FF utk OH and CH)
 Copy to roadmap template (DRAG; P/U AND S/O & TORQUE; ROTATE ON-BOTTOM
AND ROTATE OFF-BOTTOM)

b) Rotating off bottom regardless FF


c) Max Weight Yield to be compute using Csg FF = 0.25 and OH FF =0.35 (slight diff using
other FF)
d) String Analysis to be compute using Csg FF = 0.25 and OH FF =0.35 (big different in
MOP if using other FF) – using 0.4 CH/OH for completion
e) Effective tension to be compute using Csg FF = 0.25 and OH FF =0.35
f) Torque depth plots to be compute using Csg FF = 0.25 and OH FF =0.35

Internal
HYDRAULICS ROADMAP
-Analysis Settings
1) SPP roadmap computation (Circulating Pressure vs Run Depth)
a) Hole section 17.5in (900GPM-1200GPM);
Hole section 12.25in (800GPM-1100GPM);
Hole section 8.50in (400GPM-700GPM)
Hole section 6.00in (250GPM,300GPM,350GPM and 400GPM)
b) Tick Use Values from circulating system,
Include cutting loading
i. Cuttings diameter (0.250in for SBM and 0.125in for WBM/SW)
ii. ROP : 30m/hr or 100ft/hr
iii. Rotary speed : Depends (RSS=150RPM) or (mud motor = max 120RPM for <1.5o
< max 80RPM)

2) ECD roadmap computation (ECD vs Run Depth)


a) Tick Use Values from circulating system,
Include cutting loading
i. Cuttings diameter (0.250in for SBM and 0.125in for WBM/SW)
ii. Fixed GPM value based on OPTIMUM GPM (more than 1.0HSI and min hole
cleaning)
iii. ROP varies (0,30,50,100m/hr) or (0,100,200,300ft/hr)
iv. Rotary speed : Depends (RSS=150RPM) or

Internal
(mud motor = max 120RPM for <1.5o < max 80RPM)

Internal
Internal
Internal