This document is an itemized bill for excavation and foundation work. It lists 7 line items with descriptions of the work, quantities, rates, and amounts. The total sum for all items is 8,237,530.
This document is an itemized bill for excavation and foundation work. It lists 7 line items with descriptions of the work, quantities, rates, and amounts. The total sum for all items is 8,237,530.
This document is an itemized bill for excavation and foundation work. It lists 7 line items with descriptions of the work, quantities, rates, and amounts. The total sum for all items is 8,237,530.
Number 1 EXCAVATION WORK m3 1500 344.34 516,510.0 2 BACKFILL TO EXCAVATION m3 500 1756.48 878,240.0 CONCRETE C-25 FOR FOUNDATION PAD AND 3 m3 150 9024.54 1,353,681.0 CONCRETE COPPING FORMWORK FOR FOUNDATION PAD AND 4 m2 102.20 722.27 73,816.0 CONCRETE COPPING REINFORCEMENT BAR FOR FOUNDATION PAD 5 kg 2585.22 150 387,783.0 AND CONCRETE COPPING CLASS-B CEMENT MORTARED STONE 6 m3 1000 5000 5,000,000.0 MASONARY WALL INCLUDING POINTING 7 PVC WEEP HOLE PIPE ml 200 100 20,000.0 GEO-TEXTILE FILTER FABRIC BEHIND WEEP 8 ml 75 100 7,500.0 HOLE (optional) TOTAL SUM 8,237,530.0
The Institute of Energy's Second International Conference on COMBUSTION & EMISSIONS CONTROL: Proceedings of The Institute of Energy Conference Held in London, UK, on 4-5 December 1995