CONDOMINIUM DEVELOPMENT AT
WELIGAMA
METHOD STATEMENT
FOR
EXCAVATION AND BACK FILLING
Method Statement for Excavation and Backfilling
1 Purpose ................................................................................................................. 2
2 Scope ..................................................................................................................... 2
3 Specification and Drawing Reference ................................................................. 2
4 Equipment ............................................................................................................. 2
5 PPE Materials ....................................................................................................... 3
6 Resources and Manpower..................................................................................... 3
7 Methodology .......................................................................................................... 3
8 Inspections and Approvals .................................................................................... 4
9 Health and Safety ......................................................................................................... 4
LIST OF DRAWINGS
ANNEXURES
1 Purpose
➢ All excavation (Apartment & MEP building) & site clearing and back filling
will be carried out in accordance with the specification detailed in the BOQ,
drawings & tender specifications.
2 Scope
4 Equipment
➢ Excavator – 120
➢ JCB
➢ Lorry
➢ Plate Compactor
➢ Total station
➢ Level machine
➢ Level staff
➢ Porker Vibrate
5 PPE Materials
➢ Following PPE (Personal Protective Equipment) should be provide in order to
all work.
• Safety Helmets
• Safety Boots
• Safety Masks
• Hand Gloves
• High visibility vest
➢ Site Engineer
➢ Site Supervisor
➢ Skilled Labors
➢ Unskilled Labors
➢ Machine Operators as required.
7 Methodology
➢ Site clearing
• Where the existing ground surface is covered with the topsoil or unsuitable
material will be completely removed.
• Topsoil will be removed and transported to the disposal yard.
➢ Completion of setting out as per the approved method statement.
➢ Removing of top soil up to raft top level including 1m away from building
perimeter line.
➢ Completion earth work system as per the approved method statement.
➢ Start the excavation up to required level using JCB and Excavator.
➢ Excavated soil disposal off site with using lorry and JCB, disposal soil stock in
adjoining rented land for backfilling.
➢ After completion of entire raft concrete, backfilling work shall be carried out by
300mm layers and compact using water & porker vibrators.
➢ Porker vibrator shall be inserted at 450mm regular interval in both directions &
450mm depth.
➢ In accordance with the BML Health and safety guidelines & tender specification.
58600
4100 6600 6400 6100 6100 6100 6100 6400 6600 4100
37200
+0.250EL.
1000 Tk. 300
ZONE 1 4115
988
CATCH PIT +2.150EL. +2.200EL.
400x400x250 1000 Tk.
200 400 410 1050 950 Tk.
175
ZONE 2
4540
250
400 400
1850
300
300
1
600
600
1000
214
50
850
300
300
300
300
300
400
300 300 200 100
200 3532
+2.200EL. 300 300
1000 Tk.
3530
2679
RETAINING SYSTEM
(203x102x23 Kg/m
& 2" TIMBER PLANKS)
285
290
746
785
C.L
900
1001
51
ZONE 3
2477
250
49
200 4100 456 250 1830 250
+1.350EL.
3910
300 Tk.
600
8200
250
6623
+2.200EL.
1000 Tk.
+2.200EL.
1000 Tk.
3944
+2.200EL.
1000 Tk.
3
347
644
2401 3999 2946 800 200 2154
1995
1648
181 1170
400
146
156
350
350
400
3900
1666
400x400x400mm
1826
2116
201
1525
CATCH PIT.
1766
1766
51
400
200
4789
5870
6191
200 800
+2.200EL.
+2.200EL.
1000 Tk.
4350
1000 Tk.
750
400
ZONE 6
9100
400 1800
2000
1600
ZONE 4
450x450x300mm
6605
6634
CATCH PIT
800 200
2582
3415 2984
2705
600
895
2980
ZONE 8
2909
2429
600 200
2025
650
1729
1629
1340
1340
29
1230
1169
254
379
350
350
350
200
5
379
800
721
99
1596
1596
1596
651
+1.350EL.
2305
875
300 Tk.
250 1830 250 359
100
201 199 651 2335 3414 6501 4051
+2.200EL. +2.200EL. +2.200EL. 201
1600
1600
49
250
1000 Tk. 99
1000 Tk. 1000 Tk.
4650
5370
2400
8
S04.2
17100
No. Date Description Issued by
SHOP DRAWING
PROPOSED CONDOMINIUM
DEVELOPMENT SOUTH BEACH
WELIGAMA PROPERTIES(PVT) LTD AT
DISCIPLINE
STRUCTURAL WORK
DRAWING TITLE
CONTRACTOR :
E-mail : buildmart@sltnet.lk
Web : www.buildmartlanka.lk
BASEMENT LEVEL
4100 6600 6400 6100 6100 6100 6100 6400 6600 4100
2000
50 150
1076 1088
1'
37200
A TIO
VA 2 5
N
CA +0.250EL.
-8
988
N
+2.150EL.
300
+2.200EL. A EXISTING
LEVEL
6001
EX EL. TIO 5
1699
1677
1672
1659
1636
1640
1605
1503
VA
1000 Tk.
V 2
LE CA +11
2888
EX EL.
2586
300 300
V 3108
LE
3678
3623
300
300
300
1 +1125
214
600
600
300
1000
50
300
850
300
LEVEL
300
200
300
100
200 300 300
400 3532 +2.200EL.
1975
1000 Tk.
3530
2679
-0.0/+0.0
2 290 285 SEA LEVEL
785
746
1001
900
51 N
TIO 5
250
2477
7 49 456 -825
VA
200
S04.1
2 4100 1830
3910
300 Tk.
V
LE 600
9100
600
8200
250
6623
+2.200EL.
B B
1000 Tk.
+2.200EL.
1000 Tk.
3944
SECTION A-A
+2.200EL.
1000 Tk.
3 347
644
200
2401 3999 2946 800 2154 301
1995
1648
1170
3834 3651
400
204
146
156 181
4 350 350
146
1666
1826
201
1916
1566
1766
51
200 200
N
800 2700 800
A B C D E F G H I J K
200
2400
4789
5073
197 111
TIO
1896 4204 1894 2266 3834
6191
5870
C
+2.200EL. VA
CA +62
5 TIO
N
800
+2.200EL.
200 1000 Tk.
C
4350
VA
1000 Tk.
EX EL.
750
5
CA +62
9100
V EX EL. 2000
LE
6805
2
6634
S03
V
LE
200 300
1903
2582
1160
2705
600
3
2980
896
2909
S03
600 240
2025
EXISTING
1729
1629
200
254
29
1029
5
721
1596
1596
2033
1990
651
1968
1945
1917
+1.350EL.
1874
2000
2305
875
1744
1730
2000
1716
1645
1645
300 Tk. 359
1545
1830 100
651 2335 3414 6501 4051
250 250 49
1600
1600
E
+1125
2399
Y
LEVEL
101
1225 2850 6524 1076 3975 725 624
2000
2000
E
17100
-0.0/+0.0
2000 2000 SEA LEVEL
1200 1200
4750 2925
1200
1200
6
8025
N
4474 9549
6
SECTION B-B
1575
TIO 5
4600
4350
VA
1200
D
SSL-1.600 m
D 8
2965
CA . -16
700
7700
4150
7
EX L
FFL -1.200 m
FFL -1.200 m
SSL-1.600 m 7
1750
SSL-1.600 m
E VE A B C D E F G H I J K
L
4600
4350
3959
FFL -1.200 m
2774
2774
3573 2799
8 8
1200
1200
EXISTING
M N O
LEVEL
2204
2245
2245
2212
2153
2051
1893
1780
2728
1630
1546
1475
2203
+1225
LEVEL
+625
500
500
LEVEL
-0.0/+0.0
SEA LEVEL
SECTION C-C
1'
5'
2
5
1
M N O
EXISTING
LEVEL
EXISTING
4036
3896
3898
2071
3847
3832
2106
2057
2019
LEVEL
1666
1590
1575
1575
-0.0/+0.0
SEA LEVEL
+1125
LEVEL
-1685
LEVEL -0.0/+0.0
SEA LEVEL
EXISTING
LEVEL
4018
3923
3886
3890
-0.0/+0.0
SEA LEVEL
PROPOSED CONDOMINIUM
DEVELOPMENT SOUTH BEACH
WELIGAMA PROPERTIES(PVT) LTD AT
CONTRACTOR :
E-mail : buildmart@sltnet.lk
Web : www.buildmartlanka.lk
Layer thickness
Porcker placement space
Porcker placement depth
Back fill up to required
level
Remarks