Professional Documents
Culture Documents
Design year : ............... (present year + ...............) District : ............... Ward No : ............
Tap No. of Population Schools and Institution
Consumption Figures (l/d) Water Deman Tap flow Tap flow
No. Locality houses Present Design Present Design Domestic Institution Design (l/d) Nominal (l/s) Adopted(l/s) Remarks
A B C D E F G H I J=H+I K L
There are seperate water demand for bazar and village area requiring seperate calculation.
Total peak flow required in the system (Q ) = Design Water Demand x Peak Factor.
86400
If Q is not roughly same ± 20% with sum of all the taps provided, recheck tap flow calculation.
If Q is less then safe source yield, the designer may consider open system.