JSA-Rehabilitatin of UCT
JSA-Rehabilitatin of UCT
~ _s J)
FAUJI FERTILIZER COMPANY LIMITED 1J \ __
Plantsite - MM
MIRPUR MATHELO
Hazard Level:
I High Medium I- Low
Page 1 or 5
FAUJI FERTILIZER COMPANY LIMITED Plantsite - MM
. f MIRPUR MATHELO
Page 2 of 5
• ~ JFJJ@
• •• • FAUJI FERTILIZER COMPANY LIMITED
'b , Plantsi te - MM
MIRPUR MATHELO
Page 3 of 5
FAUJI FERTILIZER COMPANY LIMITED ~ JJIFCG
Plantsite - MM
MIRPUR MATHELO
i>age ~ of 5
~ ..rl Wii<frl~
~:'.....'.J d \.'.:!J
FAUJI FERTILIZER COMPANY LIMITED Plantsitc" - MM
MIRPUR MATHELO
Note :
> Safety Lalk specific to maintenance job with all the work force is to be conducted on daily
ba sis before job execution. Aspect of heavy ammonia leakage is also to be covered in
safely talk. (R esponsibility : Arca Engineer EM)
> Independent operators to be deputed at cooling tower top I cold basin f()r supervision/
vessel entry. (Responsibility: Shift Engineer Urea)
> Al! the casual labor is to be checked for "No smoking" in the area. They should be told
to avoid taking any matches/lighter/cigarettes on daily basis before job execution.
(Responsibility: Field Operator on Duty & Job Supervisor)
> Avoid parallel jobs at different heights . (Respons ibility: Shift Engineer UREA)