You are on page 1of 1

2 HOLES (B1 TO B2)

8 HOLES (A1 TO A8) 148.0 152.0 18 H7


13 THRU
C'HOLE 19 DEEP 14
48.0 52.0

4 HOLES (C1 TO C4)


B1
M 6 TAP
THRU A1 A2 A3 A4

159.0

225.0
144.0
129.0
190.0
77.0

D1
C2
C1

2 HOLES (D1 TO D2)


15 H7

49.0
190.0

128.0
143.0
158.0
225.0

C3
D2
C4
A8 A7 A6 A5

B2

48.0 52.0
148.0 152.0

1522 VMC DRILLING OPERATION


BASE PLATE PROCESS DRILLING NAME DATE
CO-ORDINATES
MAHABAL METAL DESIGNED SOURABH 10-07-23

PVT.LTD,MIRAJ DRAWN SOURABH 10-07-23

CHECKED SOURABH 10-07-23


SCALE- TITLE- STANDARD
1522 VMC DRIILING FXR
BASE PLATE APPROVED
PROCESS DOWEL
CO-ORDINATES SHEET NO.-
DWG NO.-

You might also like