List of Documents For Item Rate Contract For Consultants - Combined
List of Documents For Item Rate Contract For Consultants - Combined
A B C D E F G H I J K L M N O
Man hour
Number of revisions Designer Quote in Man hour Rate Rate for document /
SL No. Discipline Document Title Unit Drawing size Inputs Amount of input Max Days Engg. Hours Rate for
expected Hours percentage for Designer drawing
Engineer
2
Piping Piping SOQ LS NA Piping BOQ 2 20 0
3
Piping Isometric Drawings per drawing A3 Piping GAD 0.5 4 0
4
Piping Piping GAD - Plant per drawing A1 P&ID & Plot Plan 20 100 0
6
Piping Piping GAD - Dock line & Racks per drawing A1 or A0 P&ID & Plot Plan 10 30 0
per system (A
P&ID, Line List, GAD, Isometric
system may
Piping Stress Analysis Report
consist of up to 6
NA drawings (optional), equipment 60 0 0
drawings
8 lines)
P&ID, Line List, GAD, Data
9
Piping Piping Volume Calculation per line NA
sheets
3 0
10
Piping Overall Piping Key Plan per drawing A0 Plot Plan, P&ID-s 5 40 0
11
Piping Pipe Support drawing per drawing A4 GAD 0.5 4 0
12
Piping Pipe support drawing per drawing A3 GAD 1 8 0
13
Piping Tie in schedule per drawing NA P&ID and GAD 10 20 0
Man hour
Number of revisions Designer Quote in Man hour Rate Rate for document /
SL No. Discipline Document Title Unit Drawing size Inputs Amount of input Max Days Engg. Hours Rate for
expected Hours percentage for Designer drawing
Engineer
33
Instrumentation System Architecture -DCS LS NA - - 2 2 10 20 0
34
Instrumentation System Architecture -CCTV LS NA - - 2 2 8 10 0
Instrument Cable, JB, Main Cable Tray P&ID (or ref. P&ID from similar
Instrumentation Location Layout Drawings
LS NA
projects) & Plot Plan
1 sheet plot plan 2 2 10 30 0
35
Location Layout - P&ID (or ref. P&ID from similar
Instrumentation CCTVCamera,PA,GD,MCP & Accessories
LS NA
projects) & Plot Plan
1 sheet plot plan 2 2 10 40 0
36
P&ID (or ref. P&ID from similar
37
Instrumentation Instrument Standard Hook ups Drawing LS NA
projects) & Plot Plan
1 sheet plot plan 2 2 10 30 0
Man hour
Number of revisions Designer Quote in Man hour Rate Rate for document /
SL No. Discipline Document Title Unit Drawing size Inputs Amount of input Max Days Engg. Hours Rate for
expected Hours percentage for Designer drawing
Engineer
Electrical - ETAP
MOTOR START UP & REPORT LS A4 SLD & Load list 3 3 15 0 0
64 Calculations
Electrical - ETAP
TRANSICENT STABILITY & REPORT LS A4 SLD & Load list 3 3 15 0 0
65 Calculations
Electrical - ETAP
RELAY COORDINATION & REPORT LS A4 SLD & Load list 3 3 15 0 0
66 Calculations
Electrical - ETAP
HARMONIC STUDY & REPORT LS A4 SLD & Load list 3 3 15 0 0
67 Calculations
Electrical - Detail Single Line Diagram with Indication,
per drawing A3 Equipment List & Load list 2 3 10 10 0
68 Engg Protection and Metering scheme
Electrical - Detail
Cable route layout with section and civil inputs per drawing A3 Layout drawings 2 3 6 10 0
69 Engg
Electrical - Detail Lighting calculation and report through
per drawing A3 Layout drawings 2 3 6 10 0
70 Engg software
Electrical - Detail
Lighting layout with section and civil inputs per drawing A3 Layout drawings 2 3 6 10 0
71 Engg
Electrical - Detail
Earthing layout with section and civil inputs per drawing A3 Layout drawings 2 3 6 10 0
72 Engg
Mechanical - DESGIN BASIS REPORT FOR FIRE
LS A4 Equipment layout 2 3 10 0 0
Firefighting PROTECTION SYSTEM
73
Mechanical - TECHNICAL SPECIFICAITON FOR FIRE Equipment layout & Scope of
Document A4 2 3 20 0 0
74 Firefighting PROTECTION SYSTEM work
Mechanical - Equipment layout & Scope of
BOQ FOR FIRE PROTECTION SYSTEM Document A4 3 3 10 5 0
75 Firefighting work
Mechanical - PROCEDURES FOR HYDRO TEST OF
Document A4 Scope documents 3 3 6 0 0
76 Firefighting PIPELINE
Man hour
Number of revisions Designer Quote in Man hour Rate Rate for document /
SL No. Discipline Document Title Unit Drawing size Inputs Amount of input Max Days Engg. Hours Rate for
expected Hours percentage for Designer drawing
Engineer
Mechanical - SCHEMATIC DIAGRAM FOR FOAM (HVLR) Equipment layout & Scope
Drawing A2 2 3 10 18 0
92 Firefighting SYSTEM document
Mechanical - SCHEMATIC DIAGRAM OF FIRE ALARM
Drawing A2 Plot plan and building layout 2 3 10 18 0
93 Firefighting SYSTEM FOR BUILDING
Mechanical - PIPING LAYOUT AND DETAILS OF FIRE
Drawing A1 Plot plan and building layout 3 3 20 30 0
94 Firefighting WATER HYDRANT SYSTEM
PIPING LAYOUT AND DETAILS OF FIRE
Mechanical -
WATER SPRAY SYSTEM FOR TANK CAP. Drawing A1 Plot plan and building layout 3 3 20 30 0
95
Firefighting __________ KL
Mechanical - PIPING LAYOUT AND DETAILS OF FOAM
Drawing A1 Plot plan and building layout 3 3 20 30 0
96 Firefighting (HVLR) SYSTEM
PIPING LAYOUT AND DETAILS OF FIX
Mechanical -
FOAM SYSTEM FOR TANK CAP. Drawing A1 Plot plan and building layout 3 3 20 30 0
97
Firefighting __________ KL
Mechanical - PIPING LAYOUT AND DETAILS OF FIRE
Drawing A2 Plot plan and building layout 2 3 20 30 0
98 Firefighting ESCAPE HYDRANT FOR BUILDING
Mechanical -
LAYOUT OF FIRE EXTINGUISHER Drawing A2 Plot plan and building layout 2 3 8 8 0
104 Firefighting
TYPICAL DETAILS OF OPERATION
Mechanical -
PLATFORM FOR WATER CUM FOAM Drawing A2 Plot plan and building layout 2 3 10 18 0
105
Firefighting MONITOR FOR TANK
TYPICAL DETAILS OF OPERATION
Mechanical -
PLATFORM FOR FOAM CHAMBER FOR Drawing A2 Plot plan and building layout 2 3 10 18 0
106
Firefighting TANK
Mechanical -
GA FOR DELUGE VALVE HOUSING Drawing A2 Plot plan and building layout 1 3 8 8 0
108 Firefighting
109
Mechanical MR for Centrifugal horizontal pumps Document A4 PDS 1 2 3 10 0
112
Mechanical MR for AODD Pumps Document A4 PDS, Layout 2 2 3 10 0
113
Mechanical MR for Air compressor Document A4 PDS, Layout 2 3 3 20 8 0
114
Mechanical MR for Air dryer Document A4 PDS, Layout 2 3 3 20 8 0
116
Mechanical MR for EOT Document A4 PDS, Layout 2 3 3 20 8 0
117
Mechanical MR for HOT Document A4 PDS, Layout 2 3 3 20 8 0
118
Mechanical MR for Additive dosing skid Document A4 PDS, P&IDs, Layout 3 3 3 10 0
A B C D E F G H I J K L M N O
Man hour
Number of revisions Designer Quote in Man hour Rate Rate for document /
SL No. Discipline Document Title Unit Drawing size Inputs Amount of input Max Days Engg. Hours Rate for
expected Hours percentage for Designer drawing
Engineer
119
Mechanical MR for Chiller packge Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
120
Mechanical MR for Flare Package Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
121
Mechanical MR for ETP Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
122
Mechanical MR for STP Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
123
Mechanical MR for Weigh Bridge Document A4 PDS, Layout 3 3 3 20 8 0
Left Blank 0
124
125
Mechanical Data sheet for Centrifugal horizontal pumps Document A4 PDS 1 2 3 10 0
126
Mechanical Data sheet for Loading arm Document A4 PDS, Layout 2 2 3 10 0
127
Mechanical Data sheet for Vertical Pumps Document A4 PDS, Layout 2 2 3 10 0
128
Mechanical Data sheet for AODD Pumps Document A4 PDS, Layout 2 2 3 10 0
129
Mechanical Data sheet for Air compressor Document A4 PDS, Layout 2 3 3 20 8 0
130
Mechanical Data sheet for Air dryer Document A4 PDS, Layout 2 3 3 20 8 0
131
Mechanical Data sheet for Pig Launcher Document A4 PDS, Layout 2 3 3 10 0
132
Mechanical Data sheet for EOT Document A4 PDS, Layout 2 3 3 20 8 0
133
Mechanical Data sheet for HOT Document A4 PDS, Layout 2 3 3 20 8 0
134
Mechanical Data sheet for Additive dosing skid Document A4 PDS, P&IDs, Layout 3 3 3 10 0
135
Mechanical Data sheet for Chiller packge Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
136
Mechanical Data sheet for Flare Package Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
137
Mechanical Data sheet for ETP Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
138
Mechanical Data sheet for STP Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
139
Mechanical Data sheet for Weigh Bridge Document A4 PDS, Layout 3 3 3 20 8 0
140
Mechanical TBE for Centrifugal horizontal pumps Document A4 PDS 1 2 3 10 0
141
Mechanical TBE for Loading arm Document A4 PDS, Layout 2 2 3 10 0
142
Mechanical TBE for Vertical Pumps Document A4 PDS, Layout 2 2 3 10 0
143
Mechanical TBE for AODD Pumps Document A4 PDS, Layout 2 2 3 10 0
144
Mechanical TBE for Air compressor Document A4 PDS, Layout 2 3 3 20 8 0
145
Mechanical TBE for Air dryer Document A4 PDS, Layout 2 3 3 20 8 0
146
Mechanical TBE for Pig Launcher Document A4 PDS, Layout 2 3 3 10 0
147
Mechanical TBE for EOT Document A4 PDS, Layout 2 3 3 20 8 0
148
Mechanical TBE for HOT Document A4 PDS, Layout 2 3 3 20 8 0
149
Mechanical TBE for Additive dosing skid Document A4 PDS, P&IDs, Layout 3 3 3 10 0
150
Mechanical TBE for Chiller packge Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
151
Mechanical TBE for Flare Package Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
A B C D E F G H I J K L M N O
Man hour
Number of revisions Designer Quote in Man hour Rate Rate for document /
SL No. Discipline Document Title Unit Drawing size Inputs Amount of input Max Days Engg. Hours Rate for
expected Hours percentage for Designer drawing
Engineer
152
Mechanical TBE for ETP Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
153
Mechanical TBE for STP Document A4 PDS, P&IDs, Layout 3 3 3 20 8 0
154
Mechanical TBE for Weigh Bridge Document A4 PDS, Layout 3 3 3 20 8 0
VDR for Centrifugal horizontal pumps (GAD,
155
Mechanical data sheet, curve, name plate, packaging list, Document A4 PDS 1 2 3 60 0
test procedures etc.)
156
Mechanical VDR for Loading arm Document A4, A3 PDS, Layout 2 2 3 60 0
157
Mechanical VDR for Vertical Pumps Document A4, A3 PDS, Layout 2 2 3 60 0
158
Mechanical VDR for AODD Pumps Document A4, A3 PDS, Layout 2 2 3 60 0
159
Mechanical VDR for Air compressor Document A4, A3 PDS, Layout 2 3 3 60 8 0
160
Mechanical VDR for Air dryer Document A4, A3 PDS, Layout 2 3 3 60 8 0
161
Mechanical VDR for Pig Launcher Document A4, A3 PDS, Layout 2 3 3 60 0
162
Mechanical VDR for EOT Document A4, A3 PDS, Layout 2 3 3 60 8 0
163
Mechanical VDR for HOT Document A4, A3 PDS, Layout 2 3 3 60 8 0
164
Mechanical VDR for Additive dosing skid Document A4, A3 PDS, P&IDs, Layout 3 3 3 60 0
165
Mechanical VDR for Chiller packge Document A4, A3 PDS, P&IDs, Layout 3 3 3 100 8 0
166
Mechanical VDR for Flare Package Document A4, A3 PDS, P&IDs, Layout 3 3 3 60 8 0
167
Mechanical VDR for ETP Document A4, A3 PDS, P&IDs, Layout 3 3 3 100 8 0
168
Mechanical VDR for STP Document A4, A3 PDS, P&IDs, Layout 3 3 3 100 8 0
169
Mechanical VDR for Weigh Bridge Document A4 PDS, Layout 3 3 3 60 8 0