SURIA ENGINEERING
DOSSIER FOR TT307B STRUCTURE
EDC/VCM EXTENTION
CLIENT:
www.suriaengineering.com
1
SURIA ENGINEERING
TABLE OF CONTENTS
DOC NO.:-QC-FIL-001
2
SURIA ENGINEERING
3
SURIA ENGINEERING
1. QUA
LITY
INPE
CTIO
QUALITY INSPECTION PLAN OF TT - 307 STRUCTURE WORK Rev. : 1
Date : 14-Dec-20
EPCL MANUFACTURER
ITEM ACTIVITY ACCEPTANCE CRITERIA VERIFYING DOCUMENTS REMARKS
Status Sign Status Sign
1 DOCUMENTATION
N
1.1 Drawings Drawings H H
1.2 Welding Procedures Specification,WQT ASME Sec-IX DWGS WPS/PQR R -
1.3 Marking and Cutting Plan As per Drawing - -
1.4 Material Identification/ Verification & Control of Heat Number Material Test Certificate MTCs H H
2 Material Identification/ Verification & Control of Heat Number PO/ ASME II Part A/ DWGS MTCs H H
2.1 Column As per Drawing Specs. R
2.2 Base Plates As per Drawing Specs. R
2.3 Corner Beams As per Drawing Specs. R
2.4
2.5
2.6
2.7
2.8
Mid Beams
Mid Support Beams
Gusset Plates
Bracings of Structure
PLA
Internal and External Direct Attachments
As per Drawing Specs.
As per Drawing Specs.
As per Drawing Specs.
As per Drawing Specs.
As per Drawing Specs.
R
R
R
R
R
2.9 Supporting Saddles As per Drawing Specs. R
N
3 FABRICATION Drawings QIP W H
3.1.1 Marking Inspection Before Cutting of All Parts As per Drawing W H
3.1.2 Cutting of marked parts As per Drawing W W
3.2 MACHINING AND DRILLING As per Dwg.Specifciation QIP/Insp Report W H
3.2.1 Inspection of hole marking before drilling As per Drawing W H
3.2.2 Drilling of Plates / Hole diameter measurement As per Drawing W H
3.2.3 Extra edges flushing and Burr Removal As per Drawing W H
3.1 FIT-UP Drawings QIP W H
3.1.1 Fit-up check of each weld as per Drawing W H
3.5 WELDING ASME Sec:IX & QIP W H
3.5.1 Welding of each weld as per WPS Dwgs. W H
4 FINAL INSPECTION ASME SEC-V,Drawings Inspection & Test Reports H H Project will inspect final dimensions
4.1 Visual & Dimensional inspection according to last revised drawing W H
4.2 Surface preparation for painting Painting spec W H
4.3 Painting and DFT as per specifications Painting spec W H
5 NDE
5.1 100% DPT of all column joints ASME Sec V W H
5.2 20% DPT of bracings ASME Sec V W H
5.3 100% visual inspeciton of all welds ASME Sec V W H
ROUTE PREPARED BY REVIEWED BY APPROVED BY
NAME ALTAF KHAN NAUMAN SURIA
SIGNATURE
DATE 11/25/2020
Legends
H = Hold Point (Mandatory)
M = Monitor
R = Review (Documentation)
W = Witness
4
SURIA ENGINEERING
5
SURIA ENGINEERING
6
SURIA ENGINEERING
7
SURIA ENGINEERING
MTC Document:
8
SURIA ENGINEERING
MTC Document:
9
SURIA ENGINEERING
10
SURIA ENGINEERING
11
SURIA ENGINEERING
12MM PLATE
12
SURIA ENGINEERING
20mm
13
SURIA ENGINEERING
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 19-11-2019
14
SURIA ENGINEERING
15
SURIA ENGINEERING
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 03-12-2019
ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 10mm 20mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 10MM 10MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE
16
SURIA ENGINEERING
17
SURIA ENGINEERING
SURIA ENGINEERING
Welder Qualification
18
SURIA ENGINEERING
ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 10mm Unlimited
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 12MM 20MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE
19
SURIA ENGINEERING
20
SURIA ENGINEERING
1.0 Scope.
This Procedure Provides a System of general conditions and Specific Instructions to perform Liquid
Penetrant Examination in accordance with the applicable ASME code edition for Examination of
Carbon Steel, Stainless Steel, Welds and on Porous Material.
2.1 Penetrant Material used Shall be water Washable, Visible Colour contrast of the
Following Specifications
2.1.1 Brand
Magnaflux Spot Check
2.1.2 Material Specifications
Penetrant SLK-SPI in aerosol can.
Cleaner SKC-S in aerosol can.
Developer SKD-S2 in aerosol can.
2.2 Any change in Material from the above list shall require requalification of Procedure
2.3 Intermixing of Penetrant Materials of different manufacturers is not permitted.
3.0 Procedure.
3.2.1 Prior to Penetrant application the Surface to be Examined and all the adjacent Areas
Within 25mm Shall be Cleaned by Mechanical Means and Solvent to remove dirt, grease
Scale, Welding flux or other matter which could interfere with the Examination
3.2.2 Operations that may Close the opening and Compromise the integrity of the Examination
Such as sand blasting are not recommended when these operations are being performed.
3.2.3 A Minimum of five minutes Shall be allowed for drying the surface to be Examined
Accomplished by evaporation before applying Penetrant.
21
SURIA ENGINEERING
3.3.1 The Temperature of the Penetrant and the Surface of the part to be Examined Shall
not be below 5˚c nor above 52˚c, Local Heating or Cooling is permitted.
The Penetrant Shall be Applied by Spraying, so that all Surface under Examination
Shall be Thoroughly and uniformly covered by Penetrant.
After Application excess Penetrant is drained out from the part allowing suitable Dwell
Time of minimum 5 minutes. The area to be examined Shall remain covered by Penetrant
throughout the Dwell time.
3.4.1 After Dwell time the Penetrant on the Surface Shall be Removed by using Clean with
Cloth This operation Shall Continue until most traces of Penetrant on the surface is
Removed.
3.4.2 The Remaining Traces of Penetrant Shall be Removed be wiping the Surface Clean
with Cloth moistened with solvent remover, to Minimize removal of Penetrant from
discontinues, care Shall be taken to avoid excess Solvent Remover.
3.4.3 Flushing the surface with solvent remover following application of the penetrant and
prior to developing is strictly prohibited.
3.5.1 The developer is of Solvent, Suspended wet type and shall be applied as soon as possible
after excess penetrant has been removed and part is dried Developer Shall be Sprayed in
such a manner to assure complete coverage with a thin uniform film. The Second coat
may be applied across the first coat.
22
SURIA ENGINEERING
5.1 The Following acceptance standards shall apply which have been referred from ASME
Sec-I, Sec VIII Division -I
5.2 All Welds Such as Longitudinal and Circumferential seams, including fillet weld
Pressure Parts. Joining of Nipples. Header Shall be Free of all relevant Indication
5.2.1 All Cracks. Lack of fusion and relevant imperfections
x______________________________________x
23
SURIA ENGINEERING
24
SURIA ENGINEERING
25
SURIA ENGINEERING
7. DIMENSIONAL INSPECTION
REPORT
ELEVATION.104.000
26
SURIA ENGINEERING
ELEVATION.107.300
Beam to beam distance found as per drawing.
LINE FRAME-01
Beam to beam distance found as per drawing.
27
SURIA ENGINEERING
LINE FRAME-02
Beam to beam distance found as per drawing.
LINE FRAME-A
28
SURIA ENGINEERING
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 03-11-2020
PAGE- 01 of 02
Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
01 EL-100.300 HEB240/BP4 01 7000 Accepted
02 EL-100.300 HEB240/BP4 01 7000 Accepted
03 EL-100.300 HEB240/BP4 01 7000 Accepted
04 EL-100.300 HEB240/BP4 01 7000 Accepted
05 EL-104.000 IPE240/SS/SS 01 5000 Accepted
06 EL-104.000 IPE240/SS/SS 01 5000 Accepted
LINE FRAME-B
07 EL-104.000 IPE160/SR 01 1750 Accepted
08 EL-104.000 IPE160/SR 01 1450 Accepted
Beam to beam distance found as per drawing.
09 EL-104.000 IPE240/EM/EM 01 4000 Accepted
10 EL-104.000 IPE240/EM/EM 01 4000 Accepted
11 EL-107.300 IPE200/SS 01 1550 Accepted
12 EL-107.300 CT100/SS1/SS1 01 1500 Accepted
13 EL-107.300 CT100/SS1/SS1 01 1500 Accepted
14 EL-107.300 CT100/SS1/SS1 01 1500 Accepted
15 EL-107.300 IPE200/SS 01 1550 Accepted
16 EL-107.300 IPE200/SS/SS 01 5000 Accepted
17 EL-107.300 IPE160/SS/SS 01 2750 Accepted
18 EL-107.300 IPE160/SS/SS 01 2250 Accepted
19 EL-107.300 IPE160/SS/SS 01 2250 Accepted
20 EL-107.300 IPE160/SS/SS 01 2250 Accepted
21 EL-107.300 IPE160/SS/SS 01 2750 Accepted
22 EL-107.300 IPE200/SS/SS 01 5000 Accepted
23 EL-107.300 IPE200/SS 01 1050 Accepted
24 EL-107.300 CT100/SS1/SS1 01 1000 Accepted
25 EL-107.300 IPE160/SS/SS 01 1000 Accepted
26 EL-107.300 CT100/SS1/SS1 01 1000 Accepted
27 EL-107.300 IPE200/SS 01 1050 Accepted
28 EL-107.300 IPE200/SS/SS 01 4000 Accepted
29 EL-107.300 IPE200/EMT1/EMT1 01 4000 Accepted
30 EL-107.300 IPE160/SS/SS 01 1500 Accepted
31 EL-107.300 IPE160/SS/SS 01 1500 Accepted
32 EL-107.300 IPE200/SS/SS 01 4000 Accepted
33 EL-107.300 IPE200/EMT1/EMT1 01 4000 Accepted
34 EL-107.300 IPE200/SS/SS 01 4000 Accepted
35 EL-107.300 L70/LT/LT 01 1627 Accepted
36 EL-107.300 L70/LT/LT 01 1555 Accepted
37 EL-107.300 CT150/LT/LT 01 1555 Accepted
QC INSPECTOR SURIA QUALITY DEPT.
SIGNATURE SIGNATURE
NAME SHAKEEL ABBASI NAME ALTAF KHAN
DATE DATE 29
SURIA ENGINEERING
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 03-11-2020
PAGE- 02 of 02
Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
38 EL-107.300 CT150/LT/LT 01 3111 Accepted
39 EL-107.300 CT150/LT/LT 01 3111 Accepted
40 EL-107.300 CT150/LT/LT 01 2830 Accepted
41 EL-107.300 CT150/LT/LT 01 2725 Accepted
42 EL-107.300 L70/LT/LT 01 1280 Accepted
43 EL-107.300 IPE160/SR 01 900 Accepted
44 EL-107.300 IPE160/SS/SS 01 1250 Accepted
45 Line Frame-A CT150/LT/LT 01 3536 Accepted
46 Line Frame-A CT150/LT/LT 01 3536 Accepted
47 Line Frame-A L90/LT/LT 01 2475 Accepted
48 Line Frame-A L90/LT/LT 01 2122 Accepted
49 Line Frame-A CT150/LT/LT 01 4060 Accepted
50 Line Frame-A CT150/LT/LT 01 4060 Accepted
51 Line Frame-A L70/LT/LT 01 1414 Accepted
52 Line Frame-B CT150/LT/LT 01 3536 Accepted
53 Line Frame-B CT150/LT/LT 01 3536 Accepted
54 Line Frame-B L90/LT/LT 01 2050 Accepted
55 Line Frame-B L90/LT/LT 01 2121 Accepted
56 Line Frame-B CT150/LT/LT 01 4060 Accepted
57 Line Frame-B CT150/LT/LT 01 4060 Accepted
58 Line Frame-B L70/LT/LT 01 1273 Accepted
59 Line Frame-2 L70/LT/LT 01 1273 Accepted
60 Plate 10MM 01 11 Accepted
61 Plate 12MM 01 0.19 Accepted
62 Plate 30MM 01 2.09 Accepted
63 LD-1 L100 01 8380 Accepted
64 LD-1 L100 01 8380 Accepted
65 LD-1 Rod-25mm 01 13500 Accepted
66 LD-1 Flat Bar 01 8380 Accepted
67 LD-1 Flat Bar 01 8380 Accepted
68 LD-1 Flat Bar 01 8380 Accepted
69 LD-1 Flat Bar 01 8380 Accepted
70 LD-1 Flat Bar 01 8380 Accepted
31
SURIA ENGINEERING
32
SURIA ENGINEERING
.
Purchaser: Engro Polymer & Chemical
PO:
Limited. S a n d B l a s ti n g a n d P a i n ti n g A p p l i c a ti o n
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION P ro ce d u re
Rev.:00
Painting Procedure
33
SURIA ENGINEERING
1) General:
This procedure covers the outline of procedure adapted for the sand blasting
and primer application for structure.
2) Surface Preparation:
Sand blasting could be done in late hours of a day but subject to weather condition.
Sand blasting shall not be done when surface temperature is less than 3°C above
the dew point and relative humidity is greater than 85% or there is a possibility that
blasted surface shall be subject to wetting before application of primer.
Before blasting, oil, grease or other oily objects, if any, shall be removed with the
help of any detergent wash.
34
SURIA ENGINEERING
3) PAINT APPLICATION:
Base will be stirred thoroughly to homogenize. Then hardener will be added to base
in recommended ratio as mentioned in “Manufacturer's Data Sheet” with constant
stirring. A
recommended solvent shall be mixed for required thinning of primer.
Roller and or brush shall be used for application of Primer, if not restricted by Primer
Specification Sheets” by manufacturer.
After sand blasting primer shall be applied within 3 to 4 hours of blasting activity.
After each coat, surface will be left for a period recommended for drying and recoating.
Such quantity of primer shall be removed from containers and mixed with
hardeners and thinner, which must be consumed same day and with-in the Pot-life
time.
35
SURIA ENGINEERING
While applying the primer care shall be taken that paint should not be dripped,
sagged, skipped or dripped-off during application or immediately after application, if
these defects are detected then immediately be dressed with brush. If defect is not cured
then primer shall be removed completely and re-coated with the same system.
4) INSPECTIONS:
During surface preparation and primer application following inspection shall be carried out.
DFT of each coat shall be 80-100 Microns and should be measured at 5 spots per 9
SQ.M, and for area less than 9 SQ.M; at least 3 spots shall be measured.
5) Paint System:
Following paint system shall be adopted for structure including (ladder /Platforms):
36
SURIA ENGINEERING
37
SURIA ENGINEERING
38
SURIA ENGINEERING
39
SURIA ENGINEERING
40
SURIA ENGINEERING
41