Downtime Man Hours Skill Requirements
4 Hrs 3 Mechanical & Electrical
Work Preparation
1. Safety
Switch off the power supply prior to any maintenance and put UNDER MAINTENANCE Board on the
panel, also switch off the CB of respective crane.
2. Tools and Equipments Required
(a) Paint Brush (b) Torch (c) Spanners (d) Dust clothes (e) Sand papers (f) Safety Helmet
(g) WD-40 (h) Grease. (i) Lubrication Oil (j) Screw driver set

NOTE:- Use scissor lift to access bridge area of crane to check for any fault.
S. Equipment Maintenance Actions OK/ Remarks
No NOT OK
1 Main Girder Check for any Mechanical Damage.
Check for any weld seems for cracks.
2 Limit switches Check functionalities of limit switches.
Unscrew and remove the limit switches and
then clean all limit switches
3 Gear box Check the lubrication oil level in gear boxes
of hoist.
Check for any leakage.
4 Emergency Check operation of emergency switch.
switch
5 Hoist limit Check operation of limit switches during
switches lowering and lifting.
Collision Move the crane to nearest crane and check
6 prevention whether it stops or not upon reaching other
system (For WS crane.
cranes)
Clean dirt accumulation on reflectors.

Check contactor & mcb for sparking, change


if required.
Check working of all push buttons in pendant.

7 Check all underbridge and platform lights,


Power supply
buzzer/alarm system are working.
Check for any damage of stationary cable,
moving connection cable and pendant cable.
Check UP/Down movement of hoist.
8 Operation Check cross movement of hoist.
Check longitudinal movement of the crane.
Greasing of wire ropes and rope drum.
9 Greasing Greasing of bearing housing through grease
nipples with the use of grease gun
10 Nut bolt Tighten all nuts of the drive couplings.
tightening
Check tie rod nuts and tighten if necessary
11 Checking of hoist Inspect the brake shoe thickness, if found
brakes less than 3mm, replace it.
Lift the nominal load of the given crane and
check for hoist brake while lifting.
Check rope wire for any broken stand.
12 Miscellaneous Check hook and hook safety latch for any
crack or damage.
Air cleaning of crane bridge platform, cabin
etc.
Maintenance Signature
Done by: